@                                                               @                                                              4
           BUSINESS USES CODE                                                                                                                                                                                  wy      mm
           Performance Criteria and Acceptable Solutions                                                                                                                                                       ‘1       GRISBANE

                      ded a) EV (Ol ome aen edad ey                     ACCEPTABLE SOLUTIONS                        SOLUTIONS’                                 COMMENTS                                  COUNCIL USE ONLY
          Table 14 - For all Business Uses
          14.17 Effects of use
          Electricity infrastructure
                                                                                                                         v¥           The development proposal will not adversely impact the existing or
          01 The development does not adversely impact on | $7.1 No solution provided                                                 future electricity supply and will ensure that all necessary upgrades
           existing or future electricity supply infrastructure;                                                                      will be undertaken.
           AND
           02 All uses and works maintain an adequate safe | $2.1 Development for uses adjacent to or within             v            The subject site is not within SOm of an existing substation.
           distance from  electrical infrastructure including | 50m  of   an_  existing  electricity substation
           substations, overhead powerlines, power poles and | incorporates noise   attenuation  measures   to
           transformers.                                      mitigate noise impacts; and
                                                              $2.2 Buildings and structures (including swimming          v            No structure will be constructed under powerlines.
                                                              pools, sheds, tennis courts and outbuildings) are
                                                              not   constructed   under   overhead _ electricity
                                                              transmission lines, or within electricity easements.

           14.18 Amenity                    :
           Noise
                                                                                                                         v            The proposal will not adversely affect the existing amenity of the
           03 Development is designed and sited to avoid | No solution provided                                                       area as the surrounding areas are within the Industry Zone. The
           noise emissions that unreasonably diminish the                                                                             proposal will not generate any excessive noise levels,
          amenity of the area or surrounding uses.
          Mechanical plant and equipment and storage
.         areas                                                                                                                       All mechanical plants will be adequately screened with all air-
                                                                                                                                      conditioning units to be located on the roof of the building and will
          04 Mechanical plant and equipment (including air | $4.7 Mechanical plant and equipment are—                    v            not be visible from the street.
          conditioning equipment} and storage areas are | a)       located more than 2m from any property
          designed and located to—                                 boundary;
          a)  avoid adverse visual impacts when viewed | b)        where located at ground level, screened by
              from the street and adjoining properties; and        fencing 1.5m in height or dense vegetation of
           1    Solution;    =~ = Acceptable Solution                                                                                                                                                               Appendix C
                             A/S = Altemative Solution                                                                                                                                                       business code.doc
                             N/A = Not applicable to this proposal
           178-182 Eumundi Noosa Road, Noosaville                                                                                                                                                                       Page 1

Used in these records

About this file

File size
13.3 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

0015E24E.001.pdf · 13.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.