Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

0015E24E.001

of 236

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (13.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Text sections not matched to the original PDF pages. See original document to check page numbers.

EARTH WORKS CODE                                                                                                                                                                                       4 pmm
                                                                                                                                                                                                           q!
     Performance Criteria and Acceptable Solutions                                                                                                                                                          \        BRISBANE
    fed med E YO ome lad Ey                               ACCEPTABLE SOLUTIONS                                SOLUTIONS’          COMMENTS                                                           COUNCIL USE ONLY
                                                          b) provision of dust stabilised or sealed intemal
                                                            roads;
                                                          ¢) protective covering of exposed areas that are left
                                                            for more than 2 weeks; and
                                                          G) if there is no valid development permit for the
                                                            site, disturbed areas are revegetated using
                                                            species identified in PSP3 — Landscaping Plants
                                                            and Guidelines.
                                                         AND                                                                                                                 .
                                                         $4.2 Earthworks are undertaken only during the              ¥            Earthworks will only occur between 7am and 6pm
                                                         hours of 7am to 6pm, Monday to Friday and 7am to
                                                         6pm on Saturday. No work is undertaken on
                                                         Sunday or public holidays.                                                                 ;
    Vegetative Waste
    05 Vegetation cleared from a development site is     $5.1 Cleared vegetation is transported offsite for          v            All cleared vegetation will be appropriately disposed of.
    disposed of in an environmentally responsible        disposal in an approved green waste disposal
   manner.                                               facility;
                                                         OR
                                                         $5.2 Cleared vegetation is mulched on-site and
                                                         reused for landscaping of the finished
                                                         development;
                                                         OR
                                                         $5.3 Cleared vegetation is disposed of for the
                                                         purpose of firewood.
    Managing contamination risk
    06 Materials used as fill are suitable for           $6.1 The fill material is solid clean earth, free of        v            All fill that is used will be of an appropriate quality.
    development of the land and filling or excavation    putrescible or refuse material, vegetation, acid
   works do not result in the contamination of land.     sulfate soils, building or construction material or
    1     Solution:   v= Acceptable Solution                                                                                                                                                                    Appendix C
,                     AJS = Alternative Solution                                                                                                                                                            earth works.doc
                      N/A = Not applicable to this proposal
    178 - 182 Eumundi Noosa Road, Noosaville             .                @                                                                ©                                                                        Page 2

Used in these records

About this file

File size
13.3 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

0015E24E.001.pdf · 13.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.