Skip to the record
Every meeting, every word.

Council archive · source document

0015E24E.001

of 236

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (13.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Text sections not matched to the original PDF pages. See original document to check page numbers.

EROSION AND SEDIMENT CONTROL CODE                                                                                                                                                                  4        mm
          Performance Criteria and Acceptable Solutions                                                                                                                                                       ‘ P BRISBANE

                    PERFORMAACE CRITERIA                               ACCEPTABLE SOLUTIONS                       SOLUTIONS’                                  COMMENTS                                  COUNCIL USE ONLY

         14.143 Effects of works
         Erosion and sediment control
         Of Development minimises erosion and transport      $1.4 Site disturbance is limited to building areas,        ¥            All sites disturbances will be limited to building areas.
          of sediments off-site.                             their surrounds and other use areas;
                                                             AND
                                                             $1.2 Sediment barriers are provided throughout             v            Sediment barriers will be employed where necessary.
                                                             and downslope of disturbed areas to prevent
                                                             sediment washing into gutters, drains and
                                                             watercourses either on or off the site;                                                        :
                                                             AND
                                                             §1.3 All stockpiles including sand, soil or building       v            All stockpiles will be appropriately retained.
                                                             materials are within the premises and contained
                                                             within individual sediment barriers;
                                                             AND
                                                             $1.4 Sediment basins are provided where the site           v            Sediment basins will be used where required.
                                                             contains fine or dispersive soils;
                                                             OR
                                                             $1.5 A stormwater catchpit incorporating a                 v            Stormwater catchpits will be employed where necessary.
                                                             stormwater catchpit protection device is installed so
‘                                                            that all runoff from disturbed areas flows to the
                                                             catchpit;
                                                             AND
                                                             $1.6 For buildings,                                        v            Downpipes will be connected to the stormwater system prior to
                                                             a) temporary or permanent downpipes are                                 roofing with erosion control measures being employed.
                                                                connected to the stormwater   system before
          1     Solution.   =~ = Acceptable Solution                                                                                                                                                               Appendix C
                            A/S = Alternative Solution                                                                                                                                                    erosion sediment.doc
                            N/A = Not applicable to this proposal
          178 -— 182 Eumundi Noosa Road, Noosaville                                                                                                                                                                    Page 1

Used in these records

About this file

File size
13.3 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

0015E24E.001.pdf · 13.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.