18. On installation of any new mechanical equipment OR if requested by Council,
written certification must be submitted from a suitably qualified person
confirming noise levels from any mechanical equipment comply when
measured at either the residential boundary or outside the most exposed part of
an affected building, whichever is the closest to the equipment.
19. Service vehicle movements associated with the development (including loading
and unloading) and noise generating activities (such as leaf blowers, gurneys,
waste removal, disposal of bottles, and the like) must not occur outside the
hours of 7am to 6pm.
Spill Light
20. Lighting associated with the use must be designed, sited, installed and tested to
comply with Table 2.1 & 2.2 of Australian Standard AS4282-1997 “Control of
the obtrusive effects of outdoor lighting” using a control level of 1.
21. Certification must be submitted to Council from a suitably qualified person*
within 6 months of this approval taking effect which certifies that all outdoor
lighting devices comply with AS4282-1997 and the requirements of this
Decision Notice. * See advisory note.
Landscaping
22. The site shall be landscaped in accordance with the provisions of The Noosa
Plan.
Carparking
23. A minimum of 39 off street carparking spaces, 4 scooter parking bays and 8
bicycle parking bays as indicated on the approved plan of development. All
vehicles must enter and exit the site in a forward direction.
24. Linemarking must be completed to both the development’s carparks in
accordance with the approved plans.
Refuse
25. Refuse containers must be provided in accordance with the requirements of the
Environmental Protection (Interim Waste) Regulation 1996 and (Waste
Management) Regulation 2000, for the storage and collection of refuse.
26. An imperviously paved area must be provided to accommodate all refuse and
recycling containers to the reasonable satisfaction of Council’s Environmental
Health Officer. This area is to be aesthetically screened from any road frontage
or adjoining property boundary and is to be set back a distance of two (2)
metres from any road frontage. A suitable hosecock, hoses and approved
drainage outlet to Council’s sewer, are to be located in the vicinity of the refuse
container area for washing containers.
B. Find the following are sufficient grounds to justify the decision despite the conflict with
the Planning Scheme:
1. The site has an existing development permit for a retail garden centre and café.
2. The development’s mix of uses is consistent with contemporary garden and
lifestyle centres and is appropriate for the site’s location, being on a collector
road and adjacent Noosaville’s Business Centre zone.
3. The development will not introduce significant negative impacts on adjoining
residents, or the visual and residential amenity of the surrounding area.
Page 6 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.