        9.4.      Low impact construction techniques are used around vegetation to minimise
                  interference with the vegetation.
10.     Cleared vegetation is to be suitably processed by one of the following methods and removed
        from the site:
        10.1.     Processing through a woodchipper or shredder. The resulting mulch is to be
                  stockpiled loose in heaps of less than 1000 cubic metres, less than 2.5 metres high
                  with a minimum of 10 metres between edges of heaps.
        10.2.     Disposal for firewood.
        10.3.     Disposal for landscaping purposes.
11.     The applicant is advised that burning off is an unacceptable method of disposal.
12.     Transport to an alternative site for breaking down materials is acceptable provided that all
        necessary permits have been obtained to allow the alternate site to be used for this purpose.
13.     The areas to the north and south of the ground floor deck to the rear of the dwelling shall be
        landscaped garden areas consisting of dense native, endemic species planted in
        accordance with Council’s Planning Scheme Policy PSP3 Landscaping Plants and
        Guidelines.
14.     Gates shall not be installed along the rear property boundary.
Water Storage
15.     All hot water systems installed shall be either solar, electric heat pump; or gas (LPG or
        natural).
General
16.     The development shall be undertaken and operated in a manner that causes no detrimental
        effect upon the amenity of the neighbourhood due to the creation of excessive noise, lighting
        nuisance, or other emissions.
17.     Buildings and structures (including swimming pools, sheds, or outbuildings) shall not be
        constructed under overhead electricity transmission lines, or within any easements.
18.     External colours and finishes of the building shall comprise of muted/environmental tones
        that blend with the natural environment.
Earthworks
19.     Earthworks required on site shall be carried out in accordance with Council’s Planning
        Scheme Policy PSP5 Engineering Design Standards, so as not to cause the additional
        ponding of water on any adjoining lands or concentrate or direct overland flow on to an
        adjoining property.
Sediment and Erosion Control
20.     Sediment and erosion control measures shall be in place prior to the building works. If such
        measures are not in place or are not satisfactory, ‘on the spot’ fines may be issued. Such
        fines can be issued if sediments from the site are found to enter or have the potential to
        enter Council’s stormwater system or natural waterways.

5     REFERRAL AGENCY CONDITIONS

Not applicable.
6     APPROVED PLANS/DOCUMENTS

The approved plans and / or documents for this development approval are listed in the following
table:

                                                                                     Page 3 of 9

Used in these records

About this file

File size
60 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

SPA Decision Notice [As Published].pdf · 60 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.