SPA Decision Notice [As Published] · 132010.334
2010/334
9.4. Low impact construction techniques are used around vegetation to minimise
interference with the vegetation.
10. Cleared vegetation is to be suitably processed by one of the following methods and removed
from the site:
10.1. Processing through a woodchipper or shredder. The resulting mulch is to be
stockpiled loose in heaps of less than 1000 cubic metres, less than 2.5 metres high
with a minimum of 10 metres between edges of heaps.
10.2. Disposal for firewood.
10.3. Disposal for landscaping purposes.
11. The applicant is advised that burning off is an unacceptable method of disposal.
12. Transport to an alternative site for breaking down materials is acceptable provided that all
necessary permits have been obtained to allow the alternate site to be used for this purpose.
13. The areas to the north and south of the ground floor deck to the rear of the dwelling shall be
landscaped garden areas consisting of dense native, endemic species planted in
accordance with Council’s Planning Scheme Policy PSP3 Landscaping Plants and
Guidelines.
14. Gates shall not be installed along the rear property boundary.
Water Storage
15. All hot water systems installed shall be either solar, electric heat pump; or gas (LPG or
natural).
General
16. The development shall be undertaken and operated in a manner that causes no detrimental
effect upon the amenity of the neighbourhood due to the creation of excessive noise, lighting
nuisance, or other emissions.
17. Buildings and structures (including swimming pools, sheds, or outbuildings) shall not be
constructed under overhead electricity transmission lines, or within any easements.
18. External colours and finishes of the building shall comprise of muted/environmental tones
that blend with the natural environment.
Earthworks
19. Earthworks required on site shall be carried out in accordance with Council’s Planning
Scheme Policy PSP5 Engineering Design Standards, so as not to cause the additional
ponding of water on any adjoining lands or concentrate or direct overland flow on to an
adjoining property.
Sediment and Erosion Control
20. Sediment and erosion control measures shall be in place prior to the building works. If such
measures are not in place or are not satisfactory, ‘on the spot’ fines may be issued. Such
fines can be issued if sediments from the site are found to enter or have the potential to
enter Council’s stormwater system or natural waterways.
5 REFERRAL AGENCY CONDITIONS
Not applicable.
6 APPROVED PLANS/DOCUMENTS
The approved plans and / or documents for this development approval are listed in the following
table:
Page 3 of 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SPA Decision Notice [As Published]Related documentApplication case desk ↗
About this file
- File size
- 60 KB (small file)
- File type
No other editions are linked here.