e : as ” . oo a4 - 7 ;
‘écoaccess Coe “
"environmental licences and.permits . :

Notice
Concurrence Agency Response

 

 

In the latter case, alternative action may be appropriate to minimise the risk in the first instance.
For example, where the risk of exposure to any UXO that may.exist is.reduced by.the‘preserice of
a structure or, natural barrier, issuance of the standard UXO warning (see Condition 2) may suffice
while the structuire, ‘stockpile or barrier‘remains in place: Where a strlictureis to be rémoved ‘or
reduced as part of the development program, protective precautions, commensurate with any
gréater risk to which workers might then be exposed, may need to be considered. Progressive
assessment will be necessary where such circumstances exist. Unless, at the completion of
preliminary works, there is evidence then available to the: UXO contractor that any residual risk is
-:neigible ee use of detection caer will ‘typically 2 be a feguired to; ‘onfi irm-the site's status: a 1 te «

noon ed : « nt eels iM ; A ha

   
   

 

‘Staged iD iavectigationrerediation is most likely to be’ applicable where development of sinaller’ ‘built
.on lots (which can present circumstances such as those discussed above) or broadhectare sités is
proposed. In such cases, the EPA’s assessment of the report and‘advice to Council in regard to
approval of the development will be dependent « on n agreement: with the management: plan.

19 ye a

  

.Where- Condition 1 is to be Satisfi ed: ‘by a ‘whole lot or broadhectare’ developmen stage® bein "
‘subjected to” investigation. and ‘any necessary’ ‘remedial action, ‘the:EPA, based on the’ subsequent
. investigation/remediation report's findings.and recommendation/s}: ‘may reassess the lot; or ‘that’
oy portion coriprising the development Stage, as being:remediated: or not: needing: rémediation, and
_advise.the applicant and Council accordingly. Otherwise, any balance of.land that has not been
* furthéririvéstiqated. will.retairy theirisk.assessment made by Defence and.the.EPA’s Area
.” Management Advice. will continue to apply. This is unless evidence obtained from: the investigated
.” paft/s'can:be ‘used, to refute Deferice’s.asseSsment in regard to‘all or part of the balance. In:the latter

he EPA may reassess all 9, the, balance or the applicable part/s as being unaffected: by UXO.
ued a, TS . -

  
  
 
 
 
 
 
 
 
 
 
  
  
   
 
 
 
  
    

    

Additional inférmation for applicants oF . : o Be

This concurrence.response pursuant to the Environmental Protection Act 1994 applies oniy to
contaminated. land issues and does not remove the need to obtain any, ‘further approval for this
‘ development which’ may be required by this or othér legislation, State and/or Commonwealth.
‘Applicants ; are advised. ‘to check with all relevant s Statutory 2 authorities. for. such requirements:
#a ay) oe _* Byes x * a ° *
Enquiries: | * ‘
*Ranald Scott, Project Manager (UXO) - Environmental Protection Agency
Ph: (07) 3224 5644 Fax: (07) 3247 3278 email:[email protected]

 
   
 
 
  

    

~ End of Concurrence Agency Response ~

eS

 

Page 5.of 5 » AF080109.

 

Used in these records

About this file

File size
394 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_1805 - Referral Agency Response - EPA [As Published].pdf · 394 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.