       DEVELOPMENT ASSESSMENT REPORT
DEVELOPMENT APPLICATION FOR OPERATIONAL WORK (PRESCRIBED TIDAL
                           WORKS)

                            LOT 83 N21847

                     37 MOSSMAN COURT, NOOSA HEADS

File Number: 20153                                   13 July 2020
Log in to download the original file

05. Hales - Planning Report.pdf · 2.3 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 42 pages

Page 2

 PROJECT URBAN – 20153                                                                                                            13 Jul 2020

DOCUMENT INFORMATION

 Project number:                       20153

 Report prepared for:                  Mr David & Mrs Louise Hales


DOCUMENT CONTROL

   Revision #                Date                   Prepared by                     Reviewed by                      Authorised by

       Draft              8/07/2020                 Trish Belt                       Glen Wright                      Glen Wright
       Final             13/07/2020                 Trish Belt                       Glen Wright                      Glen Wright

COMPANY DETAILS

 Project Urban Pty Ltd
 Suite 1 Corner Surf Road & Gardak Street
 ALEXANDRA HEADLAND QLD 4572
 Tel: 07 5443 2844
 Fax:
 Email: [email protected]


Disclaimer Statement

Project Urban Pty Ltd retains ownership and copyright of the contents of this document including drawings, plans, figures and other work
produced by Project Urban Pty Ltd. This document is not to be reproduced in full or any part, unless separately approved by Project Urban Pty
Ltd. The client may use this document only for the purpose of which it was prepared. No third party is entitled to use or rely on this document.

This report is based on our opinion of the town planning issues that arise from the statutory provisions relating to this site. Comments and
conclusions in or construed from this report relating to matters of law are not to be relied upon. You should only rely upon the advice of your
professional legal advisors with respect to matters of law. This report is provided on the basis that our standard Terms and Conditions apply.




 Development Assessment Report                                                                                                      Page 2 of 42
 Operational Works
 37 Mossman Court, Noosa Heads 4567

Page 3

 PROJECT URBAN – 20153                                                                                                                                   13 Jul 2020


TABLE OF CONTENTS

1.0     APPLICATION SUMMARY................................................................................................... 4
2.0     INTRODUCTION ................................................................................................................ 5
3.0     BACKGROUND .................................................................................................................. 6
  3.1     PRIOR DEVELOPMENT APPROVALS .......................................................................................................... 6
4.0     SITE DESCRIPTION ............................................................................................................. 7
  4.1     SUBJECT SITE & FORESHORE ..................................................................................................................... 7
  4.2     MARITIME AMENITY OF THE AREA ........................................................................................................... 8
5.0     PROPOSED WORKS ............................................................................................................ 9
6.0     STATUTORY REQUIREMENTS ........................................................................................... 11
  6.1     TYPE OF DEVELOPMENT ........................................................................................................................... 11
  6.2     ASSESSMENT TYPE .................................................................................................................................... 11
  6.3     OWNER’S CONSENT .................................................................................................................................. 11
  6.4     REFERRAL .................................................................................................................................................... 11
  6.5     STATE DEVELOPMENT ASSESSMENT PROVISIONS .............................................................................. 11
7.0     PRESCRIBED TIDAL WORKS.............................................................................................. 13
  7.1     PRESCRIBED TIDAL WORKS CODE........................................................................................................... 13
8.0     PLANNING SCHEME......................................................................................................... 37
  8.1     PLANNING SCHEME – WATERCOURSES WORKS CODE....................................................................... 37
9.0     CONCLUSION .................................................................................................................. 42




 Development Assessment Report                                                                                                                             Page 3 of 42
 Operational Works
 37 Mossman Court, Noosa Heads 4567

Page 4

PROJECT URBAN – 20153                                                                          13 Jul 2020


1.0 APPLICATION SUMMARY

 SITE DETAILS

 Address                             37 MOSSMAN COURT, NOOSA HEADS

 Real Property Description           Lot 83 on N21847

 Local Authority                     Noosa Council

 Registered Landowner                Mr David Hales & Mrs Louise Hales

 PLANNING SCHEME DESIGNATIONS

 Planning Scheme                     The Noosa Plan 2006

 Locality / Planning Area            Noosa Heads

 APPLICATION DETAILS

 Applicant                           David & Louise Hales

 Application Type                    Development Permit for Operational Works (Prescribed Tidal
                                     Works)

 Proposal                            Removal of existing retaining wall, concrete ramp and jetty &
                                     installation of new boundary wall and jetty

 Level of Assessment                 Code

 Referrals                           SARA for the Department of State Development, Manufacture,
                                     Infrastructure & Planning (DSDMIP)
                                           Tidal works within a Coastal Management District



 PROJECT TEAM

 Town Planning                       Project Urban

 Engineering                         SCG Consulting Engineers




Development Assessment Report                                                                   Page 4 of 42
Operational Works
37 Mossman Court, Noosa Heads 4567

Page 5

 PROJECT URBAN – 20153                                                                   13 Jul 2020


2.0 INTRODUCTION

This Development Assessment Report has been prepared to support a Development Application
for Operational Works for Prescribed Tidal Works on behalf of David & Louise Hales.



The subject site is located at 37 Mossman Court, Noosa Heads and described as Lot 83 on N21847.



Under The Planning Act 2016, the proposal is subject to code assessment.



The purpose of this report is to describe the characteristics of the site, detail the proposed
development and provide an assessment against the applicable planning provisions.



This report is to be read in conjunction with the accompanying covering letter, DA form, engineered
plans and engineer design advice.




 Development Assessment Report                                                             Page 5 of 42
 Operational Works
 37 Mossman Court, Noosa Heads 4567

Page 6

 PROJECT URBAN – 20153                                                                                13 Jul 2020


3.0 BACKGROUND

3.1 PRIOR DEVELOPMENT APPROVALS


A timber jetty is currently located on site. A search of Queensland Globe records indicates that a
right jetty was approved under Section 86 sanction. Reference number for the sanction is
EH805564. This jetty will be demolished as part of the proposed new works.




                                 Figure 1: Existing approved jetty (Source: Qld Globe 2020)




                                                                                        Existing
                                                                                        jetty to be
                                                                                        removed




                          Figure 2: Existing approved jetty to be removed (Source: Nearmap 2020)

 Development Assessment Report                                                                         Page 6 of 42
 Operational Works
 37 Mossman Court, Noosa Heads 4567

Page 7

 PROJECT URBAN – 20153                                                                                           13 Jul 2020


4.0 SITE DESCRIPTION

4.1 SUBJECT SITE & FORESHORE


The subject site is located at 37 Mossman Court, Noosa Heads and described as Lot 83 on N21847.

The site’s location and context is illustrated in the figures below:




                                    Subject Site




                                      Figure 3: Location of Subject Site (Google Maps)




                                               Subject Site




              Figure 4: Aerial Photograph of Subject Site, NearMap, Accessed July 2020, http://www.nearmap.com


 Development Assessment Report                                                                                    Page 7 of 42
 Operational Works
 37 Mossman Court, Noosa Heads 4567

Page 8

 PROJECT URBAN – 20153                                                                             13 Jul 2020

At the rear or canal side of the property there is a masonry retaining wall behind the house. In
front of the retaining wall and forward of the boundary is a grassed area edged with larger rocks
at the top of the canal foreshore. There is an existing right hand jetty and a concrete boat ramp
on the eastern edge of the property. Figure 5 below shows the existing foreshore.




                                                                        Boat ramp eastern corner


                                                                 Existing right hand jetty

                   Retaining wall at          Grassed area with rock edge
                   rear of house


                                       Figure 5: Existing foreshore (Source: Nearmap)




4.2 MARITIME AMENITY OF THE AREA


The property is located on the eastern end of Mossman Court. The DSDMIP mapping facility
identifies the property as not being within a high-risk maritime development zone and being within
a developed waterway.




                               Figure 6: Waterway status (Source:- Qld Govt DA Mapping 2020)
 Development Assessment Report                                                                      Page 8 of 42
 Operational Works
 37 Mossman Court, Noosa Heads 4567

Page 9

 PROJECT URBAN – 20153                                                                                13 Jul 2020

The canal area of Mossman Court and Witta Circle is highly populated with marine structures and
the jetty proposed is in keeping with this amenity. See Figure 7.




                                                Subject Site




                       Figure 7: Marine amenity Mossman Court & Witta Circle (Source: Nearmap 2020)


5.0 PROPOSED WORKS

This application seeks a Development Permit for Operational Works for:-

    1.   Removal of the existing retaining wall, boat ramp and jetty; and
    2.   Installation of a new boundary wall and jetty.

The demolition works is shown in Figure 8 below. This involves the removal of the existing finger jetty,
retaining wall and small concrete ramp located on the south-western corner of the property. The foreshore
rocks and grassed area (labelled as “Landscaping” in figure 8) will also be removed to allow for the
construction of the new boundary wall and reshaped to allow for the jetty entry access.




                                                Figure 8: Demolition works


 Development Assessment Report                                                                         Page 9 of 42
 Operational Works
 37 Mossman Court, Noosa Heads 4567

Page 10

 PROJECT URBAN – 20153                                                                                  13 Jul 2020

The new boundary wall will be constructed along the boundary line of the property with no portion of the
wall extending past the defined boundary. The boundary wall will be constructed of masonry block and have
a finished level of approximately RL 1.5m AHD. The new jetty will be freestanding and not connect to the
new wall but rather abut up to the same level as the top of the new wall.




                                               Figure 9: Proposed works


The jetty deck will initially slope down slightly keeping a low profile in line with the beach level and then level
out with a finished level of RL 0.8m AHD. The jetty will extend a total of 15m from the boundary wall to the
designated quay line. It will be constructed of timber with 200mm diameter treated hardwood piles for
support. The jetty is to be left-turned with a head of 7000mm in length and 1500m in width. There will be a
handrail down one side of the jetty as required for Australian Standards.




                                       Figure 10: Proposed elevation of the works



A safety ladder will be installed on the inside edge of the jetty head for the safety of the users as
required under the Prescribed Tidal Works Code. In addition, a light that meets with Council
requirements is to be provided on the jetty head to ensure navigational safety during darkness
hours.
 Development Assessment Report                                                                          Page 10 of 42
 Operational Works
 37 Mossman Court, Noosa Heads 4567

Page 11

 PROJECT URBAN – 20153                                                                              13 Jul 2020

The jetty structure will allow for the private mooring of a vessel measuring a maximum of 10m in
length and 4m in beam.



6.0 STATUTORY REQUIREMENTS

6.1 TYPE OF DEVELOPMENT


This application seeks a Development Permit for Operational Works (prescribed tidal works). The proposed
works are for removal of the existing retaining wall, concrete boat ramp and existing jetty and installation of
a new boundary wall and jetty.


6.2 ASSESSMENT TYPE


The proposal is code assessable development located within a local government tidal area where the local
government (Noosa Council) is the Assessment Manager.

Part 17 Division 2 Table 1 of the Planning Regulation 2017 confirms that the assessment benchmark is
schedule 3 of the Coastal Protection and Management Regulation.

Under the requirements of The Noosa Plan, the proposal must also address the Watercourses Works Code.



6.3 OWNER’S CONSENT


Under Division 2 Item 51 of the Planning Act 2016, owner’s consent is not required to support an application
for work on land below HWM and within a canal.


6.4 REFERRAL


In accordance with the Planning Regulation 2017, referral to the State Assessment and Referral Agency
(SARA) is triggered under:-

       Schedule 10, Part 17 Division 3 Table 2 for Assessable development under s28 in tidal waters.

The Department of State Development, Manufacture, Infrastructure & Planning has been identified as a
Concurrence Agency for this application.


6.5 STATE DEVELOPMENT ASSESSMENT PROVISIONS




 Development Assessment Report                                                                       Page 11 of 42
 Operational Works
 37 Mossman Court, Noosa Heads 4567

Page 12

 PROJECT URBAN – 20153                                                                              13 Jul 2020

The State Development Assessment Provisions (SDAP) set out the matters of interest to the state. The state
assessment and referral agency (SARA) is responsible for assessing or deciding development applications as
assessment manager or as a referral agency.

Referral for Maritime Safety (State Code 7) is required to be addressed in this instance. An assessment against
this code has been undertaken and is included in the application documents.




 Development Assessment Report                                                                       Page 12 of 42
 Operational Works
 37 Mossman Court, Noosa Heads 4567

Page 13

 PROJECT URBAN – 20153                                                                            13 Jul 2020


7.0 PRESCRIBED TIDAL WORKS


7.1   PRESCRIBED TIDAL WORKS CODE
The proposal complies with the Acceptable Solutions of the Prescribed Tidal Works Code as demonstrated
in the table below.

 Performance Criteria            Acceptable Solution                            Comments
 Character & Amenity (generally) – Prescribed Tidal Work in a Canal
 1.1 Prescribed tidal works in a The design and construction of the             Compliant
 canal are compatible with its prescribed tidal work is consistent with the
 location, having regard to the following standards:-                           The proposed works are
 following:-                     a) subject to paragraph (c), prescribed        consistent with the Mossman
 a) the       character     and                                                 Court and Witta Circle maritime
                                     tidal work does not extend past the
                                                                                development.
      amenity of the work’s          side boundary or extended side
      immediate surroundings         boundary of the lot connected to the       The jetty does not extend
      and the locality within        work;                                      within 3m of the prolongations
      which the work is located; b) subject to paragraph (c):-                  of    the     boundaries    in
 b) if the relevant planning         i) for prescribed tidal works for a        accordance     with    Council
                                                                                planning scheme.
      scheme       states    the         private purpose – the works are
      desired character or               not roofed; or                         The proposed works are not
      amenity for the work’s         ii) for prescribed tidal works for a       roofed.
      immediate surrounds or             non-private purpose – the works
      the locality within which          are not roofed unless they are the
      the work is located – the          main access to land;
      stated desired character c) if a relevant planning scheme standard
      or amenity.                    is more stringent than the standard
                                     mentioned in paragraph (a) or (b) – the
                                     relevant planning scheme standard, to
                                     the extend it is more stringent than the
                                     standard mentioned in paragraph (a)
                                     or (b);
                                 d) any other relevant planning scheme
                                     standard that is not inconsistent with
                                     the     standards      mentioned      in
                                     paragraphs (a) to (c)

 Performance Criteria           Acceptable Solution                             Comments
 Character & Amenity (generally) – Prescribed Tidal Work NOT in a Canal
 2.1 Prescribed tidal works not The design and construction of the              Not applicable
 in a canal are compatible with prescribed tidal work is consistent with the
 its location, having regard to following standards:-                           The proposed works              are
 the following –                a) subject to paragraph (d), prescribed         located within a canal.
 a) the       character    and       tidal works do not extend past the side
      amenity of the work’s          boundary or extended side boundary
      immediate      surrounds       of the lot connected to the work;


 Development Assessment Report                                                                     Page 13 of 42
 Operational Works
 37 Mossman Court, Noosa Heads 4567

Page 14

PROJECT URBAN – 20153                                                                             13 Jul 2020


Performance Criteria           Acceptable Solution                              Comments
Character & Amenity (generally) – Prescribed Tidal Work NOT in a Canal
    and the locality within b) subject to paragraph (d), prescribed
    which the work is located;     tidal works are the only work of its type
b) if the relevant planning        along the edge of the tidal water
    scheme       states    the     fronting the lot connected to the work;
    desired character or c) subject to paragraph (d):-
    amenity for the work’s         (i) for prescribed tidal works for a
    immediate surrounds or              private purpose - the works are
    the locality within which           not roofed; or
    the work is located – the      (ii) ii) for prescribed tidal works for a
    stated desired character            non-private purpose – the works
    or amenity.                         are not roofed unless they are the
                                        main access to land;
                               d) if a relevant planning scheme standard
                                   is more stringent than the standard
                                   mentioned in paragraph (a), (b) or (c) –
                                   the      relevant    planning    scheme
                                   standard, to the extent it is more
                                   stringent than the standard mentioned
                                   in paragraph (a), (b) or (c).
                               e) any other relevant planning scheme
                                   standard that is not inconsistent with
                                   the       standards     mentioned       in
                                   paragraphs (a) to (d).



 Performance Criteria            Acceptable Solution                            Comments
 Character & Amenity (materials and colours)
 3.1 Prescribed tidal work is The height, scale and size of the prescribed      Compliant.
 of a height, scale and size to tidal work is consistent with each relevant
 ensure      the    work      is planning scheme standard.                      The proposed works are
 compatible       with      the                                                 consistent with the planning
 character and amenity of its                                                   scheme      requirements     of
 location, having regard to                                                     structures outside of the Noosa
 the following:-                                                                Waters canal.
 a) the height, scale and
      size of the natural                                                       The minimum setbacks are in
      features of the work’s                                                    place.
      immediate surrounds
      and the locality within                                                   The jetty is of the preferred
      which the work is                                                         sizing.
      located;
 b) the height, scale and                                                       Character and amenity will
      size of the existing                                                      remain in keeping with the
      buildings    or    other                                                  marine infrastructure of the
      structures in the work’s                                                  immediate area.
      immediate

Development Assessment Report                                                                      Page 14 of 42
Operational Works
37 Mossman Court, Noosa Heads 4567

Page 15

PROJECT URBAN – 20153                                                                         13 Jul 2020


 Performance Criteria          Acceptable Solution                          Comments
 Character & Amenity (materials and colours)
     surroundings and the
     locality within which the
     work is located;
 c) if the relevant planning
     scheme       states   the
     desired height, scale or
     size of buildings or
     other structures in the
     work’s         immediate
     surroundings or the
     locality within which the
     work is located – the
     stated desired height,
     scale or size.

 Performance Criteria           Acceptable Solution                         Comments
 Character & Amenity (materials and colours)
 4.1 The materials used for, The materials used for, and colours of, the    Compliant.
 and     the     colours    of, prescribed tidal work are consistent with
 prescribed tidal work are each relevant planning scheme standard.          The materials and colours used
 compatible        with    the                                              for the proposed structure will
 character and amenity of                                                   be commensurate with similar
 the work’s location, having                                                structures in the locality,
 regard to the following:-                                                  providing a consistent amenity
 a) the natural features of                                                 value.
     the work’s immediate
     surroundings and the
     locality within which the
     work is located;
 b) the existing buildings or
     other structures in the
     work’s         immediate
     surroundings and the
     locality within which the
     work is located;
 c) if the relevant planning
     scheme       states   the
     desired materials to be
     used for, or desired
     colours of, buildings or
     other structures in the
     work’s         immediate
     surroundings or the
     locality within which the
     work is located – the


Development Assessment Report                                                                  Page 15 of 42
Operational Works
37 Mossman Court, Noosa Heads 4567

Page 16

PROJECT URBAN – 20153                                                                                 13 Jul 2020


 Performance Criteria                Acceptable Solution                            Comments
     stated desired materials
     or colours.

 Performance Criteria                Acceptable Solution                            Comments
 Lighting
 5.1 Lighting, other than an         The lighting for the prescribed tidal work,    Not applicable.
 aid to navigation, for              other than an aid to navigation, is
 prescribed tidal work is            consistent with the following standards:-      No lighting is proposed other
 installed in a way to ensure        a) subject to paragraph (c), lighting for      than that required for safe
 the security and safe use of            prescribed tidal work is hooded and        navigation.
 the work without causing                directed downwards;
 significant adverse effects         b) subject to paragraph (c), each lighting
 on the amenity of the                   standard, to the extent relevant;
 locality within which the           c) if a relevant planning scheme standard
 work is located.                        is more stringent than the standard
                                         mentioned in paragraph (a) or (b) – the
                                         relevant planning scheme standard, to
                                         the extent the standard is more
                                         stringent than the standard mentioned
                                         in paragraph (a) or (b);
                                     d) any other relevant planning scheme
                                         standard that is not inconsistent with
                                         the standards mentioned paragraphs
                                         (a) to (c).

 Performance Criteria                Acceptable Solution                            Comments
 Signage
 6.1    A sign erected or            A sign erected or otherwise placed in          Not applicable.
 otherwise placed in position        position for prescribed tidal work, other
 for prescribed tidal work,          than a sign erected or placed for safety       No signage is proposed as part
 other than a sign erected or        reasons, is consistent with the following:-    of this application.
 placed for safety reasons or        a) subject to paragraph (c), a sign erected
 under an Act:-                          or placed in position for identifying
 a) is compatible with the               prescribed tidal work, or the owner of
     character and amenity               the work, is the only sign erected or
     of the work’s immediate             placed in position for identifying the
     surroundings and the                work or owner;
     locality within which the       b) subject to paragraph (c), a sign erected
     work is located; and                or otherwise placed in position for
 b) is not a dominant                    prescribed tidal work is integrated into
     feature of the work,                the design and construction of the
     unless the dominance is             work;
     for safety reasons.             c) if a relevant planning scheme standard
                                         is more stringent than the standard
                                         mentioned in paragraph (a) – the
                                         relevant planning scheme standard, to


Development Assessment Report                                                                         Page 16 of 42
Operational Works
37 Mossman Court, Noosa Heads 4567

Page 17

PROJECT URBAN – 20153                                                                                  13 Jul 2020


 Performance Criteria                Acceptable Solution                             Comments
                                        the extent it is more stringent than the
                                        standard mentioned paragraph (a);
                                     d) any other relevant planning scheme
                                        standard that is not inconsistent with
                                        the     standards      mentioned       in
                                        paragraphs (a), (b) and (c).

 Performance Criteria                Acceptable Solution                             Comments
 Earthwork and Vegetation
 7.1 Excavation and filling for      The earthwork and filling for the prescribed    Compliant.
 prescribed tidal work:-             tidal work is consistent with each relevant
 a) is carried out only to the       planning scheme standard.                       Only the minimum excavation
     extent         reasonably                                                       necessary for the wall works
     necessary for the work;                                                         and placement of the jetty will
     and                                                                             occur. A temporary sediment
 b) does not have a                                                                  control measure will be used
     significant       adverse                                                       and this is shown on the
     effect on:-                                                                     proposed plans.
     (i) the natural features,
          including the banks,
          of the tidal water in
          the           works’
          immediate
          surroundings; or
     (ii) the level of the
          surface of the land
          under the tidal
          water in the works’
          immediate
          surroundings or any
          foreshore near the
          works.
 7.2       The location and          Vegetation on land affected by the              Not applicable.
 construction of prescribed          prescribed tidal works is dealt with in a way
 tidal      works      ensures       consistent with the following standards:-       No vegetation will be disturbed
 vegetation is cleared or            a) subject to paragraph (b), the clearing       on the site.
 disturbed only to the extent            or disturbance of vegetation for a
 reasonably necessary for the            purpose      associated      with     the
 work.                                   construction of prescribed tidal works,
                                         including, for example, parking for
                                         construction or workers’ vehicles or
                                         stockpiling of construction materials –
                                         (i) Is avoided; or
                                         (ii) If the clearing or disturbance of
                                              vegetation     for    a    purpose
                                              associated with the construction of
                                              a works cannot be avoided – the

Development Assessment Report                                                                           Page 17 of 42
Operational Works
37 Mossman Court, Noosa Heads 4567

Page 18

PROJECT URBAN – 20153                                                                                    13 Jul 2020


 Performance Criteria                Acceptable Solution                             Comments
 Earthwork and Vegetation
                                              clearing or disturbance is limited
                                              to the smallest area of land
                                              reasonably necessary for the
                                              purpose;
                                     b) any other relevant planning scheme
                                         standard that is not inconsistent with
                                         paragraph (a).
 7.3 After the construction          Land or vegetation affected by the              Compliant.
 of prescribed tidal works,          prescribed tidal works is dealt with in a way
 any land damaged or                 consistent with the following standards:-       The top of the canal bank will
 destabilized by, and any            a) subject to paragraph (b):-                   be returned to its natural profile
 vegetation         damaged,             i)        land surfaces damaged or          as part of the works.
 destroyed or removed by,                          destabilised by the prescribed
 the construction of the                           tidal works are restored an
 works is rehabilitated.                           stabilised; and
                                         ii)       vegetation           damaged,
                                                   destroyed or removed by
                                                   prescribed tidal works is
                                                   replaced        with     native
                                                   vegetation for the locality
                                                   within which the work is
                                                   located, to the extent it is
                                                   reasonably practicable to
                                                   replace the vegetation with
                                                   native vegetation;
                                     b) if a relevant planning scheme standard
                                         is more stringent than the standard
                                         mentioned in paragraph (a) – the
                                         relevant planning scheme standard, to
                                         the extent it is more stringent than the
                                         standard mentioned paragraph (a);
                                     c) any other relevant planning scheme
                                         standard that is not inconsistent with
                                         the      standards      mentioned      in
                                         paragraphs (a) and (b).

 Performance Criteria                Acceptable Solution                             Comments
 Public access – availability
 8.1 Prescribed tidal works          The design and construction of the              Compliant
 do not have a significant           prescribed tidal work is consistent with:-
 adverse effect on the               a) subject to paragraph (b), prescribed         There is no public access
 availability of public access           tidal works do not involve the erection     permitted along the foreshore
 to, along or across State               or placement of any physical barrier        in this location. The proposed
 coastal land.                           preventing existing public access,          structure does not involve the
                                         along or across State coastal land near     erection of any physical barrier
                                         the works;

Development Assessment Report                                                                             Page 18 of 42
Operational Works
37 Mossman Court, Noosa Heads 4567

Page 19

PROJECT URBAN – 20153                                                                                13 Jul 2020


 Performance Criteria                Acceptable Solution                            Comments
                                     b) if a relevant planning scheme standard      preventing access along the
                                         is more stringent than the standard in     foreshore.
                                         paragraph (a) – the relevant planning
                                         scheme standard, to the extent it is
                                         more stringent than the standard in
                                         paragraph (a);
                                     c) any other relevant planning scheme
                                     standard that is not inconsistent with the
                                     standards in paragraphs (a) and (b).

 Performance Criteria                Acceptable Solution                            Comments
 Public access – safety
 9.1 The location and design         Public access to State coastal land near the   Compliant.
 of prescribed tidal works           prescribed tidal works is consistent with
 does not adversely affect           each relevant planning scheme standard.        The proposed structure does
 the safety of members of                                                           not affect the safety of
 the public accessing State                                                         members     of     the public
 coastal land.                                                                      accessing the foreshores, as
                                                                                    there is no access along the
                                                                                    foreshore available.

 Performance Criteria            Acceptable Solution                             Comments
 Navigable access to, or egress from, lots that adjoin, or are in the immediate surroundings of, a lot connected
 to prescribed tidal works
 10.1 Prescribed tidal works The design and construction of the Compliant.
 that are for a private prescribed tidal work is consistent with the
 purpose do not adversely following standards:-                                  The proposed structure does
 affect navigable access to,          a) subject      to     paragraph    (b), not intrude within 3m of the
 or navigable egress from,                prescribed tidal works:-               extended side boundaries.
 any lot that adjoins, or is in       i)      for a lot connected to the
 the immediate surroundings                   works for which there is a The proposed new boundary
 of, a lot connected to                       water allocation area – are not wall structure is to be located
 prescribed tidal works.                      constructed outside the water across the full width of the
                                              allocation area; and               property however it will not
                                      ii)     for a lot connected to works interfere with any navigable
                                              for which there is no water access to or from neighbouring
                                              allocation area – are no closer properties.
                                              than 1.5m to that lot’s side
                                              boundary or extended side
                                              boundary;
                                 b) if a relevant planning scheme standard
                                 is more stringent than the standard
                                 mentioned in paragraph (a) – the relevant
                                 planning scheme standard, to the extent it
                                 is more stringent than the standard
                                 mentioned in paragraph (a).


Development Assessment Report                                                                         Page 19 of 42
Operational Works
37 Mossman Court, Noosa Heads 4567

Page 20

PROJECT URBAN – 20153                                                                                13 Jul 2020


 Performance Criteria              Acceptable Solution                           Comments
 Infrastructure, including, access, parking, sewerage and water services
 11.1 Prescribed tidal work The infrastructure for prescribed tidal work         N/A
 has               appropriate is consistent with each relevant planning
 infrastructure, including, in scheme standard.                                  The proposed structure does
 particular, road access,                                                        not require any additional
 parking facilities, sewerage                                                    services of this nature.
 services and water services,
 having regard to the
 following:-
 a) the nature and scale of
      the work; and
 b) the number of people
      that may be on or at the
      work at any time; and
 c) the number of vehicles
      that may be on or
      moored at the work at
      any time; and
 d) the protection of any
      foreshores near the
      work and the vegetation
      and marine plants on
      the foreshores

 Performance Criteria            Acceptable Solution                             Comments
 Design, construction and safety – all prescribed tidal work
 12.1 Prescribed tidal works The design and construction of the                  Compliant.
 are        designed        and prescribed tidal work is consistent with the
 constructed in a way to following standards:-                                   The proposed structure will be
 ensure it is structurally a) subject to paragraph (c), each                     consistent     with     Australian
 sound, having regard to the        Australian Standard relevant to the          Standards relevant to the
 following:-                        design or construction of structures, to     design and construction of the
 a) relevant        engineering     the extent requirements stated in the        structure. All requirements will
      standards;                    Standard apply to the design or              be addressed in the engineered
 b) the location of the work;       construction of prescribed tidal works;      plans and as contained in the
 c) the purpose for which b) subject to paragraph (c), the projected             structural certificate.
      the work is to be used;       sea level rise is factored into the design
 d) the impact of flooding,         and construction of the prescribed
      storm tide, overtopping       tidal works;
      by waves, projected sea c) if a relevant planning scheme standard
      level      rise,     tidal    is more stringent than any standard
      influences            and     mentioned paragraph (a) – the relevant
      hydrodynamic forces;          planning scheme standard, to the
 e) the design life of the          extent it is more stringent than the
      works;                        standard mentioned in paragraph (a)
                                    or (b).


Development Assessment Report                                                                         Page 20 of 42
Operational Works
37 Mossman Court, Noosa Heads 4567

Page 21

PROJECT URBAN – 20153                                                                              13 Jul 2020


 Performance Criteria            Acceptable Solution                            Comments
 Design, construction and safety – all prescribed tidal work
 f) the dead load of the
     works and the intended
     live load for the works;
 g) the        impact         of
     hydrostatic      pressures
     on the works;
 h) the        stability      of
     individual components
     of the works, including
     for example, boulders,
     concrete       blocks    or
     sandbags.
 12.2 Prescribed tidal work The design and construction of the                  Compliant.
 does not adversely affect prescribed tidal work is consistent with the
 the structural integrity of following standards:-                              The proposal includes the
 any existing revetment or a) subject to paragraph (b), prescribed              installation of a new boundary
 seawall or another existing         tidal works, including any shore           wall. The proposed jetty will
 structure.                          abutment, piling or other structure        not attach to the new wall so no
                                     connected with the work:-                  additional loads will be placed
                                     (i) does not place an additional load      on this wall.
                                          on any existing revetment or
                                          seawall or another existing
                                          structure; or
                                     (ii) can be structurally supported by
                                          an existing revetment or seawall or
                                          another existing structure;
                                 b) if a relevant planning scheme standard
                                     is more stringent than the standard
                                     mentioned in paragraph (a) – the
                                     relevant planning scheme standard, to
                                     the extent it is more stringent than the
                                     standard mentioned in paragraph (a).
 12.3 Prescribed tidal work The design and construction of the                  Compliant.
 are       designed          and prescribed tidal works is consistent with
 constructed in a way to the following standards:-                              The proposed works will
 ensure it does not adversely a) subject to paragraph (b), prescribed           involve       only      minimal
 affect the stability of the bed     tidal work does not cause, by changing     disturbance to the canal bed
 and banks of any tidal water.       the flow of water, the removal of, or      and banks during the works.
                                     disturbance to, the sediment on the        Temporary sediment control
                                     bed and banks of any tidal water;          measures will be input in place
                                 b) if a relevant planning scheme standard      as per the proposed plans. The
                                     is more stringent than the standard        effects will be relatively short
                                     mentioned in paragraph (a) – the           term. This is certified in the
                                     relevant planning scheme standard, to      engineer’s certificate.
                                     the extent it is more stringent than the
                                     standard mentioned in paragraph (a).

Development Assessment Report                                                                       Page 21 of 42
Operational Works
37 Mossman Court, Noosa Heads 4567

Page 22

PROJECT URBAN – 20153                                                                              13 Jul 2020


 Performance Criteria             Acceptable Solution                            Comments
 Design, construction and safety – all prescribed tidal work
 12.4 Prescribed tidal works The design and construction of the                  Compliant.
 are        designed         and prescribed tidal works is consistent with
 constructed using materials the following standards:-                           The proposed structure will be
 suitable        for      marine a) subject to paragraph (b), each               constructed utilizing materials
 environments,            having     Australian Standard relevant to the         that have a long life and are
 regard to their ability to          materials that should be used, or the       resilient to marine organisms,
 resist the following:-              measures that should be taken to treat      corrosion and saltwater. The
 a) attack        by      marine     materials used, for structures, to the      engineered plans show the
      organisms;                     extend the requirements stated in the       materials used.
 b) corrosion;                       Standard apply to structures located in
 c) deterioration              or    a marine environment;
      breakage resulting from b) if a relevant planning scheme standard
      exposure                 to    is more stringent than the standard
      environmental                  mentioned in paragraph (a) – the
      conditions including, for      relevant planning scheme standard, to
      example, the following:-       the extent it is more stringent than the
          (i)        abrasion;       standard mentioned in paragraph (a).
          (ii)       immersion
                     in seawater;
          (iii)      wave
                     action.
 12.5 Prescribed tidal works The design and construction of the                  Not applicable.
 are        designed         and prescribed tidal works is consistent with
 constructed in a way to the following standards:-                               There are no stormwater
 ensure       they     do    not a) subject to paragraph (c), vessels            outlets near the proposal.
 adversely        affect     the     moored at prescribed tidal work do not
 operation or maintenance            impede the discharge of stormwater;
 of any existing stormwater b) subject to paragraph (c), prescribed
 outlet.                             tidal work does not restrict access to
                                     any stormwater outlet;
                                  c) if a relevant planning scheme standard
                                     is more stringent than the standard
                                     mentioned in paragraph (a) – the
                                     relevant planning scheme standard, to
                                     the extent it is more stringent than the
                                     standard mentioned in paragraph (a)
                                     or (b).
 12.6 Prescribed tidal works The design and construction of the                  Compliant.
 are        designed         and prescribed tidal works is consistent with
 constructed in a way to the following standards:-                               The proposed structure will
 ensure       they     do    not a) subject to paragraph (b), each               involve only minimal and short
 adversely affect the water          Australian Standard relevant to the         term disturbance to the canal
 quality of any tidal water,         design or construction of structures        bed during the works. There
 including, in particular, as a      under, within or over tidal water, to the   will be temporary sediment
 result of:-                         extent the requirements stated in the       control measures put in place
 a) release, into the tidal          Standard are directed at maintaining        to      keep       disturbance
      water, of materials used       the water quality of tidal water;           minimalized for the duration of
Development Assessment Report                                                                       Page 22 of 42
Operational Works
37 Mossman Court, Noosa Heads 4567

Page 23

PROJECT URBAN – 20153                                                                               13 Jul 2020


 Performance Criteria          Acceptable Solution                               Comments
 Design, construction and safety – all prescribed tidal work
     in the construction of b) if a relevant planning scheme standard            the works. The location of the
     the work; or                   is more stringent than the standard          control is shown on the
 b) disturbance       to   the      mentioned in paragraph (a) – the             proposed plans.
     sediment on the bed            relevant planning scheme standard, to
     and banks of the tidal         the extent it is more stringent than the
     water; or                      standard mentioned in paragraph (a).
 c) exposure        to    acid
     sulphate soils.
 12.7 Prescribed tidal works The design and construction of the                  Compliant.
 are      designed         and prescribed tidal works is consistent with
 constructed in a way to the following standards:-                               The proposed works will be
 ensure it is safe for persons a) subject to paragraph (d), each                 consistent with the relevant
 using the works.                   Australian Standard relevant to the          Australian Standards. This is
                                    design or construction of structures,        incorporated in the engineer’s
                                    the materials that should be used, for       certificate.
                                    structures, to the extend the                The proposed works will be
                                    requirements stated in the Standard          suitable for each required
                                    are directed at ensuring any surface of      purpose and this is certified by
                                    prescribed tidal works on which may          the engineer’s certificate.
                                    stand or walk is:- on which a person
                                    may stand or walk is:-
                                    (i) not slippery; and
                                    (ii) does not have any feature that
                                         may cause the person to trip or fall;
                               b) subject to paragraph (d), any part of
                                    prescribed tidal works that is unsafe for
                                    persons standing or walking on the
                                    work is surrounded by adequate
                                    barriers to deter persons from entering
                                    the part;
                               c) subject to paragraph (d), each
                                    Australian Standard relevant to the
                                    design or construction of structures, to
                                    the extent the requirements stated the
                                    Standard are directed at ensuring
                                    prescribed tidal works provide safety
                                    ladders or other design features for the
                                    safety of a person who falls off the
                                    works into water;
                               d) if a relevant planning scheme standard
                                    is more stringent than the standard
                                    mentioned in paragraph (a), (b) or (c) –
                                    the     relevant    planning     scheme
                                    standard, to the extent it is more
                                    stringent than the standard mentioned
                                    in paragraph (a), (b) or (c).

Development Assessment Report                                                                        Page 23 of 42
Operational Works
37 Mossman Court, Noosa Heads 4567

Page 24

PROJECT URBAN – 20153                                                                              13 Jul 2020


 Performance Criteria           Acceptable Solution                             Comments
 Design, construction and safety – all prescribed tidal work
 12.8 Appropriate measures The design and construction of the                   Not applicable.
 are taken for prescribed prescribed tidal works is consistent with
 tidal works for a non-private the following standards:-                        The proposed structure is for
 purpose to ensure an a) subject to paragraph (b), prescribed                   private use.
 unsupportable live load is         tidal work has erected or placed in
 not applied to the work by         position on or near the work, a sign
 persons or vehicles.               that:-
                                    (i) is visible at all times; and
                                    (ii) states the maximum live load that
                                         may be applied to the work, in
                                         terms of the maximum number of
                                         persons that may be on the work
                                         at any given time or the maximum
                                         number of vehicles of a particular
                                         type that may be on or moored at
                                         the work at any given time;
                                b) if a relevant planning scheme standard
                                    is more stringent than the standard
                                    mentioned in paragraph (a) – the
                                    relevant planning scheme standard, to
                                    the extent it is more stringent than that
                                    mentioned in paragraph (a).
 12.9 Prescribed tidal works, The design and construction of the                Compliant.
 other than a prescribed deck prescribed tidal works is consistent with
 for a private purpose, are each relevant planning scheme standard.             The proposed jetty structure is
 designed and constructed                                                       compliant      with    Council
 to ensure the use of tidal                                                     requirements. The proposed
 water in a canal for a non-                                                    boundary      wall   will   be
 maritime      purpose       is                                                 constructed completely within
 minimised.                                                                     the freehold boundary.
 12.10       Prescribed tidal (s 5(2) outcome)                                  Not applicable.
 works that are a prescribed The design and construction of the
 deck and for a private prescribed deck is consistent with the                  The proposal       is   not      a
 purpose, are designed and following standards:-                                prescribed deck.
 constructed in a way that a) subject to paragraph (c), a boardwalk
 ensures the use of tidal           or independent deck does not extend
 water in a canal for a non-        more than 3m from the waterfront
 maritime      purpose       is     boundary of the lot connected to the
 minimised.                         boardwalk or deck;
                                b) subject to paragraph (c), a boardwalk
                                    or independent deck is at least 3m
                                    inside of the side boundary or
                                    extended side boundary of the lot
                                    connected to the boardwalk or deck;
                                c) if a relevant planning scheme standard
                                    is more stringent than the standard
                                    mentioned in paragraph (a) – the
Development Assessment Report                                                                       Page 24 of 42
Operational Works
37 Mossman Court, Noosa Heads 4567

Page 25

PROJECT URBAN – 20153                                                                          13 Jul 2020


 Performance Criteria          Acceptable Solution                             Comments
 Design, construction and safety – all prescribed tidal work
                                    relevant planning scheme standard, to
                                    the extent it is more stringent than the
                                    standard mentioned in paragraph (a)
                                    or (b).

Performance Criteria            Acceptable Solution                          Comments
Design, construction and safety – boat ramps and slip ways for private purpose
13.1 Prescribed tidal works (s 5(2) outcome)                                 Not applicable.
that are a boat ramp or slip
way for a private purpose is The design and construction of the boat The proposal is not a boat ramp
designed and constructed in ramp or slip way is consistent with the or slip way.
a way to ensure it is following standards:-
structurally sound while also a) subject to paragraph (c), the walls at
ensuring the safe movement          the edge of a boat ramp or slip way
of vehicles or persons              penetrate into the earth at least
between the boat ramp or            600mm below the surface of the land
slipway and the surface of the      on which the boat ramp or slip way is
land on which the boat ramp         located;
or slip way is located.         b) subject to paragraph (c), the surface of
                                    a boat ramp or slip way is not more
                                    than 200mm above the surface of the
                                    land on which is it located;
                                c) if a relevant planning scheme standard
                                    is more stringent than the standard
                                    mentioned in paragraph (a) – the
                                    relevant planning scheme standard, to
                                    the extent it is more stringent than the
                                    standard mentioned in paragraph (a)
                                    or (b).
13.2 Prescribed tidal works The design and construction of the boat Not applicable.
that are a boat ramp or slip ramp or slip way is consistent with the
way for a private purpose are following standards:-                          The proposal is not a boat ramp
designed and constructed in a) subject to paragraph (d), the upper or slip way.
a way to ensure the safe            surface of a boat ramp or slip way has
movement of vehicles or             a width of:-
persons over the boat ramp          (i)      for a boat ramp or slipway with
or slip way.                                 vehicle access – no less than
                                             3.6m; or
                                    (ii)     for a boat ramp or slipway
                                             without vehicle access – no
                                             less than 3.0m;
                                b) subject to paragraph (d), the whole
                                    upper surface of a boat ramp or slip
                                    way is treated to prevent it from
                                    becoming slippery by using any of the
                                    following methods:-

Development Assessment Report                                                                   Page 25 of 42
Operational Works
37 Mossman Court, Noosa Heads 4567

Page 26

PROJECT URBAN – 20153                                                                              13 Jul 2020


Performance Criteria            Acceptable Solution                            Comments
Design, construction and safety – boat ramps and slip ways for private purpose
                                    i)        forming grooves over the
                                              surface, as close as possible to
                                              40mm wide, 20mm deep and
                                              150mm apart, and at an angle
                                              as close as possible to 70
                                              degrees to the centre-line of
                                              the boat ramp or slip way;
                                    ii)       covering the surface with a
                                              substance ordinarily used on
                                              to prevent skidding;
                                    iii)      making, through a physical
                                              act, the surface coarse before
                                              it sets, including, for example,
                                              by raking the surface;
                                c) subject to paragraph (d), the upper
                                    surface of a boat ramp / slip way for
                                    which a winch is not used to hoist or
                                    haul vessels onto the boat ramp / slip
                                    way has a gradient not steeper than:-
                                    i) if the surface is treated by using a
                                         method mentioned in paragraph
                                         (b)(i) or (ii) – 1:7; or
                                    ii) otherside – 1:10;
                                d) if a relevant planning scheme standard
                                    is more stringent than the standard in
                                    paragraph (a), (b) or (c) – the relevant
                                    planning scheme standard, to the
                                    extent it is more stringent than the
                                    standard in paragraph (a), (b) or (c).

Performance Criteria            Acceptable Solution                             Comments
Design, construction and safety – bridges
14.1 Prescribed tidal works The design and construction of the bridge           Not applicable.
that are a bridge do not is consistent with:
adversely affect existing a) subject to paragraph (b), the clearance            The proposal is not a bridge.
public use of any tidal water,      levels under a bridge are high enough
including, for example, use of      to allow continued public use of any
the tidal water for canoeing,       tidal water over which it is constructed;
swimming         or      other b) if a relevant planning scheme standard
recreational activities.            is more stringent than the standard in
                                    paragraph (a) – the relevant planning
                                    scheme standard, to the extent it is
                                    more stringent than the standard in
                                    paragraph (a).




Development Assessment Report                                                                       Page 26 of 42
Operational Works
37 Mossman Court, Noosa Heads 4567

Page 27

PROJECT URBAN – 20153                                                                            13 Jul 2020


Performance Criteria            Acceptable Solution                           Comments
Design, construction and safety – bridges
14.2 Prescribed tidal works The design and construction of the bridge         Not applicable.
that are a bridge do not is consistent with:-
adversely affect the flow of a) subject to paragraph (b) –                    The proposal is not a bridge.
water under the bridge.              (i) if a bridge can be adequately
                                          supported without erecting or
                                          placing a foundation support in
                                          tidal water – no foundation
                                          support to support the bridge is
                                          erected or placed in the tidal
                                          water; or
                                     (ii) otherwise – only the minimum
                                          number of foundation supports
                                          required to support the bridge is
                                          used;
                                b) if a relevant planning scheme standard
                                    is more stringent than the standard in
                                    paragraph (a) – the relevant planning
                                    scheme standard, to the extent it is
                                    more stringent than the standard in
                                    paragraph (a).



Performance Criteria            Acceptable Solution                           Comments
Design, construction and safety – prescribed decks
15.1 Prescribed tidal works (s 5(2) outcome)                                  Not applicable.
that are a prescribed deck and The design and construction of the
for a private purpose are prescribed deck is consistent with:-                The proposal       is   not      a
designed and constructed in a a) subject to paragraph (b), each of the        prescribed deck.
way to ensure it is able to following Australian Standards to the
support its intended loads, extent requirements stated in the Standard
having regard to its relevant apply to relevant loading matters for the
loading matters.                design or construction of the prescribed
                                deck:-
                                         (i)     AS/NZS 1170.0;
                                         (ii)    AS/NZS 1170.1;
                                         (iii)   AS/NZS 1170.2;
                                         (iv)    AS 4997;
                                b) if a relevant planning scheme standard
                                is more stringent than the standard in
                                paragraph (a), (b) or (c) – the relevant
                                planning scheme standard, to the extent it
                                is more stringent than the standard in
                                paragraph (a), (b) or (c).
15.2 Prescribed tidal works (s 5(2) outcome)                                  Not applicable.
that are a prescribed deck and The design and construction of the
for a non-private purpose are prescribed deck is consistent with the          The proposed works is not a
designed and constructed in a following standards:-                           prescribed deck.
Development Assessment Report                                                                     Page 27 of 42
Operational Works
37 Mossman Court, Noosa Heads 4567

Page 28

PROJECT URBAN – 20153                                                                              13 Jul 2020


Performance Criteria            Acceptable Solution                             Comments
Design, construction and safety – prescribed decks
way to ensure it is able to a) subject to paragraph (b), each of the
support its intended loads, following Australian Standards to the
having regard to its relevant extent requirements stated in the Standard
loading matters.                apply to relevant loading matters for the
                                design or construction of the prescribed
                                deck:-
                                              (i) AS/NZS 1170.0;
                                              (ii) AS/NZS 1170.1;
                                              (iii) AS/NZS 1170.2;
                                              (iv) AS 4997;
                                b) if a relevant planning scheme standard
                                is more stringent than the standard in
                                paragraph (a) – the relevant planning
                                scheme standard, to the extent it is more
                                stringent than the standard in paragraph
                                (a).
15.3    Prescribed tidal work The design and construction of the                Not applicable.
that is a prescribed deck do boardwalk or deck is consistent with the
not prevent or hinder following standards:-                                     The proposal       is   not      a
remedial       work      being a) subject to paragraph (b), a boardwalk or      prescribed deck.
undertaken on any bank of independent deck either:-
tidal water or for any existing      (i) can be easily dismantled and
retaining wall, revetment or              reassembled; or
seawall or another existing          (ii) does not restrict the movement of
structure.                                machinery ordinarily used for
                                          remedial work to any bank of tidal
                                          water or any existing retaining
                                          wall, revetment or seawall or other
                                          existing structure;
                                b) if a relevant planning scheme standard
                                is more stringent than the standard
                                mentioned in paragraph (a) – the relevant
                                planning scheme standard, to the extent it
                                is more stringent than the standard
                                mentioned in paragraph (a).

Performance Criteria            Acceptable Solution                             Comments
Design, construction and safety – jetties and piers
16.1 Prescribed tidal works (s 5(2) outcome)                                    Compliant.
that are a jetty or pier are The design and construction of the jetty or
designed and constructed in a pier is consistent with the following             The proposed jetty has been
way to ensure it is able to standards:-                                         engineered for this purpose
support its intended loads, a) subject to paragraph (b), each of the            and the relevant loads are
having regard to its relevant        following Australian Standards to the      reflected on the plans.
loading matters.                     extent requirements stated in the
                                     Standard apply to relevant loading

Development Assessment Report                                                                       Page 28 of 42
Operational Works
37 Mossman Court, Noosa Heads 4567

Page 29

PROJECT URBAN – 20153                                                                                  13 Jul 2020


Performance Criteria             Acceptable Solution                                Comments
Design, construction and safety – jetties and piers
                                     matters for the design or construction
                                     of the jetty or pier:-
                                               (i) AS/NZS 1170.0;
                                               (ii) AS/NZS 1170.1;
                                               (iii) AS/NZS 1170.2;
                                               (iv) AS 4997;
                                 b) if a relevant planning scheme standard
                                     is more stringent than the standard
                                     mentioned in paragraph (a) – the
                                     relevant planning scheme standard, to
                                     the extent it is more stringent than the
                                     standard mentioned in paragraph (a).
16.2 Prescribed tidal works The design and construction of the jetty or             Compliant.
that are a jetty or a pier are pier is consistent with the following
designed and constructed in a standards:-                                           The proposed jetty has a
way to ensure it remains a) Subject to paragraph (b), either:-                      handrail that will extend above
above the water at highest           (i)       The level of the deck of a jetty     the HAT water mark to indicate
astronomical tide.                             or pier is at least 300mm            the presence of the inundated
                                               above the water at highest           jetty.
                                               astronomical tide; or
                                     (ii)      Piles or other markers indicate
                                               the presence of the jetty or
                                               pier when it is inundated;
                                 b) if a relevant planning scheme standard
                                     is more stringent than the standard
                                     mentioned in paragraph (a) – the
                                     relevant planning scheme standard, to
                                     the extent it is more stringent than the
                                     standard mentioned in paragraph (a).
16.3 Prescribed tidal works (s 5(2) outcome)                                        Compliant.
that are a jetty or pier and for The design and construction of the jetty or
a private purpose and are on pier is consistent with the following                  The proposed jetty meets with
State tidal land are designed standards:-                                           the Council planning scheme
and constructed in a way to (a) subject to paragraph (b):-                          requirement in that no part of
ensure the jetty or pier is of a     (i)        all parts of the deck of the        the deck of the jetty is wider
size suitable for the use of a                 jetty or pier have a width of at     than 1500mm.
vessel while still minimizing                  least 900mm and not more
the amount of tidal water                      than 3m and                          The proposed jetty is within the
occupied by the jetty or pier.       (ii)      All parts of the jetty or pier are   water allocation area for the
                                               within a water allocation area       connecting lot.
                                               for the lot connected to the
                                               jetty or pier;
                                 (b) if a relevant planning scheme standard
                                     is more stringent than the standard
                                     mentioned in paragraph (a) – the
                                     relevant planning scheme standard, to

Development Assessment Report                                                                           Page 29 of 42
Operational Works
37 Mossman Court, Noosa Heads 4567

Page 30

PROJECT URBAN – 20153                                                                               13 Jul 2020


Performance Criteria            Acceptable Solution                              Comments
Design, construction and safety – jetties and piers
                                     the extent it is more stringent than the
                                     standard mentioned in paragraph (a).

Performance Criteria             Acceptable Solution                             Comments
Design, construction and safety – pipelines and other underground services
17.1       The design and (s 5(2) outcome)                                       Not applicable.
construction of prescribed The design and construction of the
tidal works that are a pipeline, pipeline or underground service is              The proposal is not a pipeline
or another underground consistent with the following standards:-                 or    another    underground
service    ensures      vessels a) subject to paragraph (b):-                    service.
anchoring near the works             (i)      for a pipeline that is gas or
cannot interfere with, or                     liquid petroleum pipeline –
damage, the works.                            AS/NZS 2885 to the extent
                                              requirements stated in the
                                              Standard apply to the design
                                              or construction of the pipeline;
                                              or
                                     (ii)     for another pipeline or other
                                              underground service – the
                                              pipeline or service is installed
                                              at least 1.2m below the surface
                                              of land, after it is installed;
                                 b) if a relevant planning scheme standard
                                     is more stringent than the standard
                                     mentioned in paragraph (a) – the
                                     relevant planning scheme standard, to
                                     the extent it is more stringent than the
                                     standard mentioned in paragraph (a).


Performance Criteria            Acceptable Solution                              Comments
Design, construction and safety – pontoons
18.1 Prescribed tidal works (s 5(2) outcome)                                     Not applicable.
that are a pontoon and not
used only for rowing, are The design and construction of the                     The structure is not a pontoon.
designed and constructed in a pontoon is consistent with the following
way to ensure it is able to standards:-
support its intended loads, a) subject to paragraph (b), each of the
having regard to its relevant       following Australian Standards to the
loading matters.                    extent requirements stated in the
                                    Standard apply to relevant loading
                                    matters for the design or construction
                                    of the jetty or pier:-
                                             (i) AS/NZS 1170.0;
                                             (ii) AS/NZS 1170.1;
                                             (iii) AS/NZS 1170.2;
                                             (iv) AS1170.4
Development Assessment Report                                                                       Page 30 of 42
Operational Works
37 Mossman Court, Noosa Heads 4567

Page 31

PROJECT URBAN – 20153                                                                               13 Jul 2020


Performance Criteria            Acceptable Solution                               Comments
Design, construction and safety – pontoons
                                             (v) AS 3962
                                             (vi) AS 4997;
                                b) if a relevant planning scheme standard
                                    is more stringent than the standard
                                    mentioned in paragraph (a)– the
                                    relevant planning scheme standard, to
                                    the extent it is more stringent than the
                                    standard mentioned in paragraph (a).
18.2 Prescribed tidal works (s 5(2) outcome)                                      Not applicable.
that are a pontoon and used The design and construction of the
only for rowing, are designed pontoon is consistent with the following            The proposed structure is not a
and constructed in a way to standards:-                                           pontoon.
ensure:-                        (a) subject to paragraph (b):-
(a) the pontoon is able to          (i)      for a pontoon constructed
support its intended loads,                  within a marina – AS 3962 to
having regard to its relevant                the     extend     requirements
loading matters; and                         stated in the Standard apply to
 (b) the pontoon is safe for                 relevant loading matters for
persons using the pontoon to                 the design or construction of
launch and retrieve rowing                   the pontoon; or
vessels.                            (ii)     for a pontoon not constructed
                                             within a marina:-
                                         (A) the access walkway of a
                                             pontoon used only for rowing
                                             is able to support at least a live
                                             load of 3.0kPa; and
                                         (B) the flotation unit of a pontoon
                                             used only for rowing is able to
                                             support at least a live load of
                                             1.5kPa; and
                                         (C) at least 75mm of the height of
                                             the pontoon’s flotation unit
                                             will remain above the surface
                                             of the water over which it is
                                             constructed if a distributed live
                                             load is applied to half of the
                                             surface of the pontoon’s
                                             flotation unit and all of the
                                             surface of the pontoon’s
                                             access walkway;
                                b) if a relevant planning scheme standard
                                    is more stringent than the standard
                                    mentioned in paragraph (a) – the
                                    relevant planning scheme standard, to
                                    the extent it is more stringent than the
                                    standard mentioned in paragraph (a).

Development Assessment Report                                                                        Page 31 of 42
Operational Works
37 Mossman Court, Noosa Heads 4567

Page 32

PROJECT URBAN – 20153                                                                             13 Jul 2020


Performance Criteria             Acceptable Solution                            Comments
Design, construction and safety – pontoons
18.3 Prescribed tidal works (s 5(2) outcome)                                    Not applicable.
that are a pontoon are The design and construction of the
designed and constructed in a pontoon is consistent with the following          The proposed structure is not a
way to ensure any load standards:-                                              pontoon.
applied to the pontoon by a a) subject to paragraph (b):-
person or thing on the              (i)     for a pontoon constructed
pontoon does not cause the                  within a marina – AS 3962 to
pontoon to tip over or tilt to a            the     extent    requirements
degree causing the person or                stated in the Standard apply to
thing to fall off the pontoon.              relevant loading matters for
                                            the design or construction of
                                            the pontoon; or
                                    (ii)    for a pontoon not constructed
                                            within a marina:-
                                          the pontoon’s access walkway
                                            extends at least 500mm onto
                                            the pontoon’s flotation unit;
                                            and
                                          for a pontoon use only for
                                            rowing – at least 75mm of the
                                            height of the pontoon’s
                                            flotation unit remains above
                                            the water over which it is
                                            constructed if a distributed live
                                            load is applied to half of the
                                            surface of the pontoon’s
                                            flotation unit and all of the
                                            surface of the pontoon’s
                                            access walkways; and
                                          for a pontoon other than a
                                            pontoon mentioned in sub-
                                            subparagraph (B) – the top
                                            surface of the pontoon’s
                                            flotation unit remains above
                                            the water over which it is
                                            constructed if a distributed live
                                            load of 1.5kPa is applied to
                                            half of the surface of the
                                            pontoon’s flotation unit and
                                            all of the surface of the
                                            pontoon’s access walkways;
                                            and
                                          the whole base of the
                                            pontoon’s      flotation    unit
                                            remains in contact with the
                                            water over which it is
                                            constructed at all times and
Development Assessment Report                                                                      Page 32 of 42
Operational Works
37 Mossman Court, Noosa Heads 4567

Page 33

PROJECT URBAN – 20153                                                                            13 Jul 2020


Performance Criteria             Acceptable Solution                           Comments
Design, construction and safety – pontoons
                                              tilts no more than 15o at any
                                              time;
                                 b) if a relevant planning scheme standard
                                    is more stringent than the standard
                                    mentioned in paragraph (a)– the
                                    relevant planning scheme standard, to
                                    the extent it is more stringent than the
                                    standard mentioned in paragraph (a).
18.4 Prescribed tidal works The design and construction of the                 Not applicable.
that are a pontoon are pontoon is consistent with the following:-
designed and constructed in a a) subject to paragraph (c), the pontoon’s       The proposed structure is not a
way to ensure the pontoon’s         flotation unit is:-                        pontoon.
flotation unit will:-               (i)       attached,     through      the
(a) rise and fall to allow for a              pontoon’s system for mooring
change in tidal water levels,                 the unit, to concrete anchors
including a change caused by                  in the bank landward of the
a flood or storm tide; and                    pontoon; or
(b) not be separated from the       (ii)      moored by piles;
lot to which the pontoon is b) subject to paragraph (c), if a tidal water
connected because of:-              level change resulting from a flood or
   (i) a change in tidal water      storm tide with an AEP of 1% would
levels        mentioned       in    cause a pontoon’s flotation unit to
paragraph (a); or                   detach from the system for mooring
   (ii) the flow of tidal water     the unit:-
around         the     pontoon,     (i)       the standard applying under
including tidal water affected                paragraph (a); and
by a flood or storm tide.           (ii)    the pontoon’s flotation unit is
                                    restrained with a tethering system to
                                    withstand the effects of the event;
                                 c) if a planning scheme standard is more
                                    stringent than the standard mentioned
                                    in paragraph (a) or (b)– the planning
                                    scheme standard, to the extent it is
                                    more stringent than the standard
                                    mentioned in paragraph (a) or (b).
18.5 Prescribed tidal works The design and construction of the                 Not applicable.
that are a pontoon identifies pontoon is consistent with the following
the lot to which the pontoon standards:-                                       The proposed structure is not a
is connected.                    a) a label that identifies the lot to which   pontoon.
                                    the pontoon is connected is written or
                                    stamped on, or fixed to, the outside of
                                    the pontoon’s floatation unit;
                                 b) if a relevant planning scheme standard
                                    is more stringent than the standard
                                    mentioned in paragraph a) – the
                                    relevant planning scheme standard to

Development Assessment Report                                                                     Page 33 of 42
Operational Works
37 Mossman Court, Noosa Heads 4567

Page 34

PROJECT URBAN – 20153                                                                            13 Jul 2020


Performance Criteria            Acceptable Solution                            Comments
Design, construction and safety – pontoons
                                    the extent it is more stringent than the
                                    standard mentioned in paragraph a).
18.6 Prescribed tidal works (s 5(2) outcome)                                   Not applicable.
that     are     a    pontoon The design and construction of the
permanently used for the pontoon is consistent with the following              The proposed structure is not a
fueling of, or the storage of standards:-                                      pontoon.
fuel for, vessels are designed (a) subject to paragraph (c), each of the
and constructed in a way to         following Australian Standards to the
ensure:-                            extent requirements stated in the
(a) the pontoon is able to          Standard apply to relevant loading
support its intended loads,         matters for the design or construction
having regard to its relevant       of the pontoon:-
loading matters; and                (i) AS/NZS 1170.0;
(b) the pontoon is safe for         (ii) AS/NZS 1170.1;
persons using the pontoon.          (iii) AS/NZS 1170.2;
                                    (iv) AS1170.4
                                    (v) AS 4997;
                                (b) Subject to paragraph (c), AS 3962 to
                                    the extent requirements stated in the
                                    Standard apply to a pontoon
                                    permanently used for the fueling of, or
                                    the storage of fuel;
                                (c) if a relevant planning scheme standard
                                    is more stringent than the standard
                                    mentioned in paragraph (a) or (b) – the
                                    relevant planning scheme standard, to
                                    the extent it is more stringent than the
                                    standard mentioned in paragraph (a)
                                    or (b).

Performance Criteria             Acceptable Solution                           Comments
Design, construction and safety – revetments and seawalls
19.1 Prescribed tidal works (s 5(2) outcome)                                   Compliant.
that are a revetment or The design and construction of the
seawall are designed and revetment or seawall is consistent with the           The    engineer’s  certificate
constructed in a way to following standards:-                                  attached to the application
ensure it is able to support its a) subject to paragraph (c), each of the      confirms the design is in
intended      loads,    having      following Australian Standards to the      accordance with the relevant
regard to its relevant loading      extent requirements stated in the          standards.
matters and its intended            Standard apply to relevant loading
design life.                        matters for the design or construction
                                    of the revetment or seawall:-
                                    (i) AS/NZS 1170.0;
                                    (ii) AS/NZS 1170.1;
                                    (iii) AS/NZS 1170.2;
                                    (iv) AS1170.4

Development Assessment Report                                                                     Page 34 of 42
Operational Works
37 Mossman Court, Noosa Heads 4567

Page 35

PROJECT URBAN – 20153                                                                            13 Jul 2020


Performance Criteria            Acceptable Solution                            Comments
Design, construction and safety – revetments and seawalls
                                    (v) AS 4997;
                                b) subject to paragraph (c), AS 4678 to
                                    the extent requirements stated in the
                                    Standard apply to earth-retaining
                                    structures;
                                c) if a relevant planning scheme standard
                                    is more stringent than the standard
                                    mentioned in paragraph (a) – the
                                    relevant planning scheme standard, to
                                    the extent it is more stringent than the
                                    standard mentioned in paragraph (a).
19.2 Prescribed tidal work (s 5(2) outcome)                                    Compliant.
that is a revetment or seawall, The design and construction of the
is designed and constructed revetment or seawall is consistent with the        The    engineer’s  certificate
in a way to ensure it can following standards:-                                attached to the application
withstand:-                     (a) subject to paragraph (d), a revetment      confirms the design is in
a)     any     tendency     of      or seawall is able to withstand the        accordance with the relevant
overturning or sliding; and         effect of waves, or a combination of       standards.
b) any other effects of waves       waves and water levels, resulting from
or changes in water levels on       a storm event with an AEP of 2%,
the revetment or seawall.           factoring in projected sea level rise;
                                (b) subject to paragraph (d), each of the
                                    following Australian Standards to the
                                    extent requirements stated in the
                                    Standard apply to relevant loading
                                    matters for the design or construction
                                    of the revetment or seawall:-
                                    (i) AS/NZS 1170.0;
                                    (ii) AS/NZS 1170.1;
                                    (iii) AS/NZS 1170.2;
                                    (iv) AS1170.4
                                    (iii) AS 4997;
                                d) subject to paragraph (d), AS 4678 to
                                    the extent requirements stated in the
                                    Standard apply to earth-retaining
                                    structures;
                                e) if a relevant planning scheme standard
                                    is more stringent than the standard in
                                    paragraph (a), (b) or (c) – the relevant
                                    planning scheme standard, to the
                                    extent it is more stringent than the
                                    standard in paragraph (a), (b) or (c).
19.3 Prescribed tidal works (s 5(2) outcome)                                   Compliant
that are a revetment or The design and construction of the
seawall is designed and revetment or seawall is consistent with the            The engineered plans and
constructed to protect the following standards:-                               certificate ensure the proposal
revetment or seawall from
Development Assessment Report                                                                     Page 35 of 42
Operational Works
37 Mossman Court, Noosa Heads 4567

Page 36

PROJECT URBAN – 20153                                                                              13 Jul 2020


Performance Criteria            Acceptable Solution                             Comments
Design, construction and safety – revetments and seawalls
erosion at the base of the (a) subject to paragraph (d), a revetment            is suitably designed for its
revetment or seawall.                or seawall provides for a sub-layer or     purpose.
                                     enough filter material to prevent
                                     erosion of the land under the
                                     revetment or seawall;
                                (b) subject to paragraph (d), the bottom
                                     edge of the base of a revetment or
                                     seawall will withstand undermining by
                                     scour;
                                c) subject to paragraph (d), AS 2758 to
                                     the extent requirements stated in the
                                     Standard apply to the sizing and
                                     grading of filter layers and armour
                                     materials;
                                d) if a relevant planning scheme standard
                                     is more stringent than the standard in
                                     paragraph (a), (b) or (c) – the relevant
                                     planning scheme standard, to the
                                     extent it is more stringent than the
                                     standard in paragraph (a), (b) or (c).
19.4 Prescribed tidal works The design and construction of the                  Compliant
that are a revetment or revetment or seawall is consistent with the
seawall are not adversely following standards:-                                 The    engineer’s  certificate
affected   by     hydrostatic a) subject to paragraph (b), AS 4678 to           attached to the application
pressure.                            the extend requirements stated in the      confirms the design is in
                                     Standard apply to hydrostatic pressure     accordance with the relevant
                                     for earth-retaining structures;            standards.
                                b) if a relevant planning scheme standard
                                is more stringent than the standard in
                                paragraph (a) – the relevant planning
                                scheme standard, to the extent it is more
                                stringent than the standard in paragraph
                                (a).

Performance Criteria             Acceptable Solution                            Comments
Design, construction and safety – wharves
20.1 Prescribed tidal works The design and construction of the wharf is         Not applicable.
that are a wharf are designed consistent with the following standards:-
and constructed in a way to a) subject to paragraph (b):-                       The proposal is not a wharf.
ensure it is able to support its    i) for a wharf constructed within a
intended loads, having regard           marina – AS 3962 to the extent
to its relevant loading                 requirements stated in the
matters.                                Standard apply to relevant loading
                                        matters for the design or
                                        construction of the wharf; or


Development Assessment Report                                                                       Page 36 of 42
Operational Works
37 Mossman Court, Noosa Heads 4567

Page 37

 PROJECT URBAN – 20153                                                                            13 Jul 2020


Performance Criteria            Acceptable Solution                            Comments
Design, construction and safety – wharves
                                    ii) for a wharf not constructed within
                                         a marina – each of the following
                                         Australian Standards to the extent
                                         requirements stated in the
                                         Standard apply to relevant loading
                                         matters for the design or
                                         construction of the revetment or
                                         seawall:-
                                         (i) AS/NZS 1170.0;
                                         (ii) AS/NZS 1170.1;
                                         (iii) AS/NZS 1170.2;
                                         (iv) AS1170.4
                                         (v) AS 4997;
                                b) if a relevant planning scheme standard
                                    is more stringent than the standard
                                    mentioned in paragraph (a)– the
                                    relevant planning scheme standard, to
                                    the extent it is more stringent than the
                                    standard mentioned in paragraph (a).



8.0 PLANNING SCHEME

Under The Noosa Plan, the proposed works are located outside of the Noosa Waters canal. The
proposal must therefore also address the relevant provisions of Table 14-64 of Division 21 –
Watercourses Works Code (8 June, 2018). An assessment of the applicable provisions of this Code
have been undertaken below.

8.1 PLANNING SCHEME – WATERCOURSES WORKS CODE


Column 1 - Specific Outcome           Column 2 - Probable Solution             Comments
14.163 Siting
O1. The construction of new           No solution provided                     Compliant.
jetties, wharves and boardwalks                                                The proposal is not located in a
on freehold land in largely                                                    largely undeveloped section of
undeveloped sections of a                                                      watercourse.             Marine
watercourse is avoided.                                                        infrastructure is common in the
                                                                               Mossman Court and Witta
                                                                               Circle area.

O2. The construction of new                                                    Not applicable.
jetties and wharves on public                                                  The proposed jetty is not
lands is avoided unless there is a                                             located on public lands.
clear     demonstrated      public
benefit and public support.
 Development Assessment Report                                                                     Page 37 of 42
 Operational Works
 37 Mossman Court, Noosa Heads 4567

Page 38

PROJECT URBAN – 20153                                                                                   13 Jul 2020


O3. Prescribed tidal works are not     No solution provided.                        Compliant.
located on the southern bank of                                                     The proposed works are
the Noosa River and tributaries                                                     located outside of these areas.
between the Noosa Heads Lions
Park and Weyba Bridge.

O4. Prescribed tidal work does                                                      Compliant.
not include extensions of on-site                                                   The proposed works do not
recreational areas unless there is                                                  include works of this nature.
a clear demonstrated public
benefit and public support.
14.164 Character and Amenity
O5. Prescribed tidal works are         S5.1 For lots with frontages greater         Compliant with S5.1.
designed and sited to ensure:-         than 15m or greater in width, jetties        The proposed jetty is setback
a) they are contained within the       and pontoons are setback a minimum           3m from the prolongation of
prolongation of boundaries of          of 3m from the prolongation of the           the side boundary.
the lot;                               boundaries, except as allowed for in
b) that when a vessel is berthed it    S5.2 and S5.3.                               The one proposed vessel is
does not encroach over the             OR                                           suitably sized for the jetty
prolongation of boundaries of          S5.2 For lots less than 15m in width         structure and will not encroach
the lot;                               (including lots located in canal bends or    over the prolongation of the
c) a high level of visual amenity is   on lots located in the head of the           boundaries of the lot.
maintained when viewed from            canal):-
the watercourse and adjoining          a)a joint application is made with the       The jetty deck is designed to
lands;                                 adjoining owner; or                          keep a low profile to ensure
d) they avoid conflicts with uses      b)where a joint application is not           visual amenity is maintained.
in the water and on the foreshore      possible, jetties and pontoons:-
and adjoining lands;                          i) Are setback a minimum of           The jetty will replace an existing
e) cluttering of watercourses is                   1m from the prolongation of      approved jetty to cluttering of
avoided;                                           the boundaries;                  the watercourse is avoided.
f) excessive traffic volumes within           ii) Are not more than 1.2m in
foreshore areas and adjoining                      width; and                       The proposed jetty materials
lands are avoided;                            iii) Have no head and are             are typical for this type of
g) materials blend with the                        located such that when a         structure and similar to other
natural surrounds; and                             vessel is berthed, it does not   structures in the immediate
h) they reflect the character and                  encroach        over       the   area.
setting     of    the    immediate                 prolongation of a boundary;
surrounds or the locality.             AND
                                       S5.3      For lots that adjoin those         S5.2 & S5.3 – Not applicable.
                                       described in S5.2, a jetty or pontoon is
                                       locat5ed well away from the common
                                       boundary.                                    Compliant.
                                                                                    The proposed jetty will not be
O6. Jetties and wharves are not        S6.1 No solution provided.                   roofed.
roofed.
                                                                                    Compliant.
                                                                                    There is no boat lifting device
                                       S7.1 No solution provided.                   proposed as part of the works.

Development Assessment Report                                                                            Page 38 of 42
Operational Works
37 Mossman Court, Noosa Heads 4567

Page 39

PROJECT URBAN – 20153                                                                               13 Jul 2020


O7. Boat lifting devices (including
boat storage devices) are only                                                  Not applicable.
located on Noosa North Shore.                                                   The proposed jetty is for the
                                      No solution provided.                     safe mooring of and access to a
O8. Large jetties, pontoons and                                                 berthed vessel. It is not for
wharves that are capable of                                                     private recreational purposes.
serving other uses, such as for
private recreational purposes, are
not permitted.
14.165 Design, Construction and Safety – Jetties, Wharves and Pontoons
O9. Prescribed tidal works are S9.1 The maximum width of a jetty,               Compliant.
designed and constructed for the jetty head or associated walkway is            The maximum width of the jetty
sole purpose of providing access 1.5m, except for at Noosa North Shore;         is 1.5m.
to vessels and are sited and AND
designed to avoid:-
a) Cluttering of watercourses;      S9.2 For jetties on the Noosa North         Not applicable.
b) Excessive traffic volumes within Shore, the maximum width of the jetty       The proposed works are not
foreshore areas and adjoining head is 2m;                                       located on the Noosa North
lands;                              AND                                         Shore.
c) Conflicts with uses on the
foreshore and adjoining lands; S9.3 The maximum length of a jetty               Compliant.
and                                 head is not more than 7m;                   The proposed jetty head is 7m
d) Unacceptable risks to person AND                                             in length.
and public safety.
                                    S9.4 A pontoon head has a maximum           Not applicable.
                                    width of 3m and a maximum length of         The proposed works is not a
                                    5m.                                         pontoon.

                                      S9.5 For “Y” and “T” shaped jetty         Not applicable.
                                      heads:-                                   The proposed jetty is not of this
                                      a) A maximum area 10.5m2 excluding        shape.
                                      any walkway is provided; and
                                      b) A walkway with a minimum length of
                                      3m is provided.

                                      S9.6 Gangways and walkways serving        Compliant     for    detached
                                      jetties and pontoons have at least one    houses.
                                      rigid handrail fitted and meet the        The jetty has a rigid handrail
                                      following:-                               down one side of the walkway.
                                      a) For detached houses – a minimum        The walkway has a width of
                                      width of 750mm and a maximum width        1.5m.
                                      of 1.5m;
                                      b) For other residential uses:-
                                              i) the gangway for single berth
                                                  pontoons has a minimum
                                                  width of 900mm;
                                              ii) the gangway for multiple
                                                  berth pontoons has a
                                                  minimum width of 1.2m if
Development Assessment Report                                                                       Page 39 of 42
Operational Works
37 Mossman Court, Noosa Heads 4567

Page 40

PROJECT URBAN – 20153                                                                              13 Jul 2020


                                                fitted with one handrail and
                                                900mm if fitted with a
                                                handrail on each side;
                                           iii) the primary walkway to
                                                multiple berth pontoons has
                                                a maximum width of 1.5m;
                                                and
                                           iv) the maximum width of the
                                                gangway is 1.5m.

                                     S9.7 In Noosa Sound, where quay lines       Compliant.
                                     are set, a jetty or pontoon does not        The proposed jetty does not
                                     extend into the watercourses beyond         extend beyond the 15m quay
                                     the quay line;                              line.
                                     OR
                                     S9.8 Where no quay lines are set, the
                                     maximum distance a jetty or pontoon
                                     extends into the watercourse is 10m,
                                     unless it can be demonstrated that a
                                     distance in excess of 10m is essential to
                                     safely access the jetty;
                                     AND
                                     S9.9 All attachments to jetties,            Compliant.
                                     including but not limited to boat lifts,    The safety ladder does not
                                     jetski dradles, floating berths and         extend beyond the quay line.
                                     floating pontoons must be located
                                     within the quay line;
                                     AND
                                     S9.10 Pontoons must be structurally         Not applicable.
                                     capable of sitting on the sand bed.         The proposal is not a pontoon.
                                     Rollers and bracing must account for
                                     this situation;
                                     AND
                                     S9.11 Jetties and pontoons must be          Compliant.
                                     free standing and not rely on               The proposed jetty does not
                                     connecting to any Council revetment         connect to any other structure
                                     wall or other structure.                    and is supported by timber
                                                                                 piles.
14.166 Design, Construction and Safety – Boat Ramps
O10 Boat ramps are designed S10.1 Where there is an existing                     Not applicable.
and constructed to:-              revetment wall:-                               The proposed works do not
a) allow access by a wheeled boat a)the levels of a boat ramp surface at         include a new boat ramp.
trailer;                          the revetment wall is no more than
b) ensure that unacceptable risks 150mm above the top of the wall, not
to personal and public safety are more than 500mm below the top of the
unlikely to be caused;            wall and not more than 200mm above
c) avoid cluttering of the the existing beach; and
watercourse;

Development Assessment Report                                                                       Page 40 of 42
Operational Works
37 Mossman Court, Noosa Heads 4567

Page 41

PROJECT URBAN – 20153                                                         13 Jul 2020


d) avoid excessive traffic volumes   b)the ramp extends into the
within foreshore areas and           watercourse no more than 9m from a
adjoining lands; and                 revetment wall;
e) ensure that visual amenity of     AND
the foreshore is maintained.         S10.2 The ramp is constructed at a
                                     uniform grade and no steeper than 1 in
                                     5 (20%);
                                     AND
                                     S10.3 The outer end of the ramp is no
                                     more than 100mm above the level of
                                     the beach;
                                     AND
                                     10.4 No part of the ramp is to extend
                                     closer than 1m to the prolongation of
                                     the boundaries.




Development Assessment Report                                                 Page 41 of 42
Operational Works
37 Mossman Court, Noosa Heads 4567

Page 42

 PROJECT URBAN – 20153                                                                   13 Jul 2020


9.0 CONCLUSION

This Development Assessment Report has been prepared on behalf of David and Louise Hales to
support a Development Application for Operational Works (Prescribed Tidal Works) adjoining 37
Mossman Court, Noosa Heads (described as Lot 83 on N21847).

This report demonstrates the proposals compliance with the applicable state and local planning
provisions, including the following grounds:

       The proposal complies with requirements of the Prescribed Tidal Works Code and Council’s
        Code for development;
       The proposal is for private access to a moored vessel;
       The proposal is consistent with the amenity and size of existing maritime structures in the
        surrounding area; and
       The design of the structure is relevant to the proposed use.


Approval of the proposed works is warranted subject to reasonable and relevant conditions.

Yours faithfully
PROJECT URBAN




MRS TRISH BELT
LICENSING & PERMITS OFFICER




 Development Assessment Report                                                            Page 42 of 42
 Operational Works
 37 Mossman Court, Noosa Heads 4567

Page 43

PROJECTURBAN.COM.AU

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.