05. Hales - Planning Report
Attached to the e-mail Operational Works Application OPW20/0117 - 37 Mossman Crt Noosa Heads.
PROJECT URBAN – 20153 13 Jul 2020
Performance Criteria Acceptable Solution Comments
Design, construction and safety – pontoons
tilts no more than 15o at any
time;
b) if a relevant planning scheme standard
is more stringent than the standard
mentioned in paragraph (a)– the
relevant planning scheme standard, to
the extent it is more stringent than the
standard mentioned in paragraph (a).
18.4 Prescribed tidal works The design and construction of the Not applicable.
that are a pontoon are pontoon is consistent with the following:-
designed and constructed in a a) subject to paragraph (c), the pontoon’s The proposed structure is not a
way to ensure the pontoon’s flotation unit is:- pontoon.
flotation unit will:- (i) attached, through the
(a) rise and fall to allow for a pontoon’s system for mooring
change in tidal water levels, the unit, to concrete anchors
including a change caused by in the bank landward of the
a flood or storm tide; and pontoon; or
(b) not be separated from the (ii) moored by piles;
lot to which the pontoon is b) subject to paragraph (c), if a tidal water
connected because of:- level change resulting from a flood or
(i) a change in tidal water storm tide with an AEP of 1% would
levels mentioned in cause a pontoon’s flotation unit to
paragraph (a); or detach from the system for mooring
(ii) the flow of tidal water the unit:-
around the pontoon, (i) the standard applying under
including tidal water affected paragraph (a); and
by a flood or storm tide. (ii) the pontoon’s flotation unit is
restrained with a tethering system to
withstand the effects of the event;
c) if a planning scheme standard is more
stringent than the standard mentioned
in paragraph (a) or (b)– the planning
scheme standard, to the extent it is
more stringent than the standard
mentioned in paragraph (a) or (b).
18.5 Prescribed tidal works The design and construction of the Not applicable.
that are a pontoon identifies pontoon is consistent with the following
the lot to which the pontoon standards:- The proposed structure is not a
is connected. a) a label that identifies the lot to which pontoon.
the pontoon is connected is written or
stamped on, or fixed to, the outside of
the pontoon’s floatation unit;
b) if a relevant planning scheme standard
is more stringent than the standard
mentioned in paragraph a) – the
relevant planning scheme standard to
Development Assessment Report Page 33 of 42
Operational Works
37 Mossman Court, Noosa Heads 4567
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.