Council archive · source document
06/2378 - EPA Referral for Concurrence Agency Reponse [As Published] · 152006.2378
ar - @coaccess™ environmental licences and permits Notice. Concurrence Agency Response Landscaping 6. At west 70% of any future landscaping within the proposed lots are to consist of Australian natives, 50% of which are to be native to the local area and include koala habitat trees species derived from local seed stock. This i isi 545, . Ses § condition 8. requirement is in addition to that Specified for rehabilitation of the site in Any landscaping to be placed either side of the drivew: veways are to be setback at least 1 metre fi edge of the pavement to ensure greater visibility of koalas attempting to cross the road. re from the Rehabilitation of Koala Sustainability Area 8. Rehabilitation of koala habitat must be undertaken in accordance with the following requirements: a. rehabilitation will be i F 2. . * enhanGe thé ori oi ensege over f inthe oroposed_Lot 2 to_ b. re-planting is to be conducted within an area located on the eastern side of the proposed Lot 2 and within the Riparian Buffer Area as shown within the Proposed Reconfiguration Plan Drawing No. 7396-02; . Cc. 150 canopy stems and 300 understorey and groundcover species are to be planted across the 600m’ area in a way that is consistent with the density, composition, and distribution of the surrounding regional ecosystems 12.3.5 and 12.3.13; 2 d. ail koala habitat tree species planted are to be derived from local seed stock; _@. in addition to the re-planting within the Riparian Buffer Area, the existing riparian vegetation within proposed Lot 2 is to be actively managed to limit weeds and soil erosion. f. the land holder shall ensure that natural regeneration of the riparian vegetation is allowed to occur by restricting access to domestic grazing animals; and g. suitable protective measures (e.g. fencing) are required to be installed around the ‘ rehabilitation area (s) at the time of planting and remain in place until the maintenance period has finished. Please refer to condition 9 for maintenance requirements. 9. Rehabilitation is to be completed within one (1) year of the date the reconfiguration approval is issued . by Noosa Shire Council. . : 40. Maintenance of the completed rehabilitation is to be undertaken over a period of two (2) years, commencing from the date revegetation is completed. Maintenance actions are to address the following: oo : i. soil erosion; stabilisation of soil structure; ii. replacement of dead tree plantings; iii. regular watering, taking into consideration current water restrictions; and iv. weed incursion; removal and management of noxious plant and environmental weed species. Page 3 of 5 * AFO80109 : : Environmental Protection Agency
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/2378 - EPA Referral for Concurrence Agency Reponse [As Published]Related documentApplication case desk ↗
About this file
- File size
- 261 KB (small file)
- File type
No other editions are linked here.