SPECIAL MEETING AGENDA 30 NOVEMBER 2022
1. ATTENDANCE & APOLOGIES
2. REPORTS
1 CONTRACT NO. CN00207 - FEDERAL MIDDLE CREEK ROAD RECONSTRUCTION –
CONTRACT AWARD
Author Project Officer – James Santifort
Infrastructure Services Department
Index ECM/ Project & Contract / CN00207 Federal Middle Creek Road
Reconstruction – Quote Award / Council Reports
ECM/ Subject / Contracting / Road Construction
Attachments 1. Evaluation Spreadsheet
– in accordance with Section 254J (3) of the Local Government
Regulation 2012 – g) negotiations relating to a commercial matter involving
the local government for which a public discussion would be likely to prejudice
the interests of the local government.
EXECUTIVE SUMMARY
• This report provides a recommendation for the contract award to the preferred supplier for
Contract No. CN00207 for Reconstruction of Federal, Middle Creek Road.
• This is a schedule of rates contract that includes all materials and services required for the
construction of the works.
• In accordance with Council’s procurement policy and procedure, an Invitation to Quote (ITQ)
was initiated and attracted eight (8) responses from six (6) suppliers.
• The evaluation panel completed the evaluation process and considered Durack Civil Pty Ltd
to be most advantageous to Council, representing the best value for money.
• The anticipated construction completion date is April 2023.
• The project is funded by the Local Roads and Community Infrastructure – Phase 3 program.
RECOMMENDATION
That Council note the report by the Project Officer to the Special Meeting dated 30 November 2022,
and award Contract No. CN00207 for Reconstruction of Federal Middle Creek Road to Durack Civil
Pty Ltd.
REPORT
1. Background
Contractor to undertake civil works for the reconstruction of a 2.1 km section of Middle Creek Road,
Federal.
The civil works and corridor improvements include but are not limited to:
• Widening to a 6m nominal formation, generally to be achieved by sealing of road shoulders.
• Lime stabilisation of subgrade to improve base characteristics.
• Installation of a centreline for the length of the carriageway upgrade works.
• Installation of additional warning signage where necessary to mitigate any identified geometry
deficiencies.
• Drainage reinstatement and/or improvement.
Page 3 of 14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.