Original source · versioned page text
23-0262- ESC DRAWINGS REVB red
Original PDF page 2, section 1. The text section number identifies this passage in the reader.
LEGEND: CATCHMENT AREAS:
EXISTING CONTOURS (0.20m) EX2
CATCHMENT 1 - 0.63 ha
SITE CATCHMENT BOUNDARY
CATCHMENT 2 - 0.24 ha
EXTERNAL CATCHMENT
CATCHMENT 3 - 0.06 ha
FLOW DIRECTION
CATCHMENT EX1 - 0.03 ha
1 CATCHMENT NAME
CATCHMENT EX 2 - 0.50 ha
2
1
EX1
3
CLIENT PROJECT
0 10 COPYRIGHT C INTEGRAL CONSTRUCTION NOOSA HEALTH PRECINCT
TOPO GROUP PTY LTD
DRAWN DESIGNED DATE DRAWING TITLE
B UPDATES TO BASIN SIZE AND LOCATION TB 29/02/2024 SCALE 1:500
500 THIS DOCUMENT MAY NOT BE COPIED OR PG TB 29/02/2024 EROSION AND SEDIMENT CONTROL PLAN
ISSUED FOR USE TRANSMITTED IN ANY FORM OR BY ANY
A ORIGINAL ISSUE KR 10/10/2023 MEANS IN PART OR IN WHOLE WITHOUT
RPEQ / SIGNATURE (IF REQUIRED) EXISTING LEVELS CATCHMENT PLAN
NORTH
A3 THE WRITTEN CONSENT OF TOPO GROUP PROJECT No DRAWING No REVISION
REVISION DESCRIPTION APPROVED BY DATE PTY LTD. CPESC 6,374 23-0262 D01 A
B
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.