E - Engineering Code Assessment.pdf
CONSTRUCTION AND ESTABLISHMENT OF STORMWATER MANAGEMENT SYSTEMS
Performance Outcomes Acceptable Outcomes Response
PO14 AO14.1 Complies.
Construction methods provide An erosion and sediment
for appropriate controls to avoid control plan prepared in The stormwater report
entry and transport of litter, accordance with the outlines during and post
sediment, and associated International Erosion Control construction stormwater
prescribed water contaminants Association Best Practice quality control outcomes, to
into receiving waters. Books demonstrates that the avoid transport of litter, and
capture and release of sediments to receiving waters.
stormwater achieves the design
objectives listed in Table A:
Construction phase –
stormwater management
design objectives of the State
Planning Policy (Appendix 2).
AO14.2
Construction works are
designed and managed to
restrict the extent of clearing
and soil exposure to the
minimum necessary for access,
and safe construction at any
one time.
AO14.3
For buildings:
(a) upstream runoff is diverted
around the construction
site;
(b) sediment barriers are
provided downslope of
disturbed areas to prevent
sediment washing into
gutters, drains and
waterways , wetlands or
drainage lines either on or
off the site; and
(c) temporary or permanent
downpipes are connected
to the stormwater system
before laying the roof; or
(d) localised erosion is avoided
by directing flow from
downpipes over non-
erosive areas.
AO14.4
Chemical flocculants used as
part of an erosion and sediment
control plan do not harm the
environmental values within
receiving waters.
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (E - Engineering Code Assessment.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.