Original source · versioned page text
E - Engineering Code Assessment.pdf
6.0 WASTE MANAGEMENT CODE
WASTE SEPARATION
Performance Outcomes Acceptable Outcomes Response
PO1 AO1.1 Complies.
Development that generates Construction, operational and
several classes of waste is demolition works are planned and The scale of development
designed so waste is managed in accordance with only requires waste
collected, stored and Planning Scheme Policy PSP9 collection from Margit
disposed of in a safe and Waste management. Road, as per the existing
ecologically sustainable Editor’s Note— PSP9 Waste waste collection at the
manner. Management requires Waste subject site.
Management Plans to be prepared
as part of certain types of
development applications to ensure
proper consideration is given to
waste minimisation, segregation
and reuse.
AO1.2
Adequate area is provided on-site
for the collection and separate
storage of recyclable,
non-recyclable, vegetative and
hazardous materials in their specific
waste streams during construction
or demolition works and the
operational phase of development.
PO2 AO2 Complies.
Waste storage areas provide Waste storage areas allow for the
separate storage of different waste Residential general
for adequate separation of all materials for reuse or recycling by: purpose and recycling bins
recyclable and will be utilised.
non-recyclable materials. a) providing sufficient area to store
all recyclable material and
recycling containers; and
b) sign posting the types of waste
stored.
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (E - Engineering Code Assessment.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.