E - Engineering Code Assessment
1.0 EXISTING SERVICES CODE
Performance Outcomes Acceptable Outcomes Response
PO1 No acceptable outcome provided Not applicable.
Development near a
stormwater drain,
overland flow path or
associated structure does
not—
(a) adversely affect the
function of the
service;
(b) place an additional
load on the service;
and
(c) unduly increase
future maintenance
costs.
PO2 AO2.1 Complies.
Maintenance access is For trunk infrastructure, a registered easement
provided to all stormwater in favour of Council is created over all Sufficient access is
drains, overland flow underground infrastructure located in private provided along the
paths and associated property. side of each dwelling
structures. unit. Overland flow
AO2.2 conveyed through the
The width of the easement required is in site originates from
accordance with Council’s Planning Scheme the site, because
Policy PSP6 Engineering Design Standards – there are no upstream
Roads, drainage and earthworks. catchments conveyed
through the site.
AO2.3
The easement is centred over the centreline of
the infrastructure.
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (E - Engineering Code Assessment.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.