E - Engineering Code Assessment
Performance outcomes Acceptable outcomes Response
Extent of earthworks AO8 Complies.
All earthworks, including cut and fill
PO8 batters, retaining walls and the like
Earthwork’s extents will be
are contained within the subject
The layout of the development contained within the site.
provides adequate, clearly site.
Parking will be along
defined and easily accessible—
Margit Crescent.
(a) on-site vehicle parking and
manoeuvring areas; and
(b) loading and manoeuvring
areas for delivery and
service vehicles.
Sloping sites AO9 Complies.
Cut or fill is less than 1.5 metres in
PO9 depth relative to the natural ground
On sloping sites development Filling of the site will be
level.
follows the natural landform less than 1.5m of natural
wherever practical and ground level.
excavation or filling is minimal.
Infrastructure protection No acceptable outcome provided Complies.
PO10
Earthworks and vehicular The scale of the
access do not adversely development will limit the
impact on the capacity, size of machinery required
operations and maintenance of during construction.
existing infrastructure. Existing infrastructure will
be protected as far as
practicable.
Environmental protection No acceptable outcome provided Not applicable.
PO11
Earthworks minimise any
adverse impact upon
groundwater, watercourses,
drainage lines, wetlands, and
native vegetation.
Dams AO12.1 Not applicable.
Where the site is in the Rural
PO12 zone—
Dam location and construction (a) the land has a slope of less
does not impact upon than 25% (1:4);
neighbouring properties or road
(b) the earthworks including cut
reserves, in terms of—
(a) hydrology; and fill batters and retaining
(b) alteration of existing walls are setback a minimum of
overland flow paths and 50 metres from the property
patterns; boundary; and
(c) landslide or failure of dam (c) the size of the lot is greater
wall; and than 5 hectares.
(d) effluent disposal areas.
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (E - Engineering Code Assessment.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.