Council archive · source document
132010.812.02 Compiled Decision Notice
Officer: Jack Lewis Direct Telephone: 07 5329 6236 Fax: 07 5329 6501 Our Reference: JLEWIS:13201.812.02 Your Reference: N/A 3 July 2014 Touram Pty Ltd C/- Rigby Lawyers Suite 8 Noosa Professional Centre 1 Lanyana Way NOOSA HEADS QLD 4567 Dear Sir/Madam Compiled Decision Notice Sustainable Planning Act 2009 I refer to your request to extend the relevant period of an existing approval. On 30 June 2014, Council decided your requested changes. Details of the decision are as follows: application details Application No: 132010.812.02 Street Address: 20 Tristania Dr MARCUS BEACH QLD 4573 Real Property Description: Lot 85 M 11112 Planning Scheme: The Noosa Plan (16 September 2013) Decision details Council on 12 July 2010 decided to issue the following type of approval: Development Permit for Material Change of Use of Premises- Multiple housing Type 2 - Duplex In relation to representations, Council on 25 October 2010 decided to: A. Agree to amend Conditions 6 and 15. In relation to the request to extend the relevant period of an existing approval, Council on 30 June 2014 decided to: A. Approve a change to Item 3 and Condition 6 extending the relevant period for 2 years to 25 October 2016. relevant period of approval The relevant period for this development approval finishes on 25 October 2016. CONSOLIDATED ASSESSMENT MANAGER CONDITIONS Planning Assessment General Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table and as amended by these conditions. Plan / Document No. Issue. Plan / Document Name Date 0912 - CD 1.01 P6 Site Plan Ground Floor – Middap Ditchfield Pty Ltd 2 June 2010 0912 - CD 0.04 P2 Easements – Middap Ditchfield Pty Ltd 2 June 2010 0912 - CD 2.01 P5 Site 20 Ground Floor Plan – Middap Ditchfield Pty Ltd 2 June 2010 0912 - CD 2.02 P5 Site 20 First Floor Plan – Middap Ditchfield Pty Ltd 2 June 2010 0912 - CD 2.03 P3 Site 20 Roof Plan – Middap Ditchfield Pty Ltd 2 June 2010 0912 - CD 4.01 P3 East Elevation – Middap Ditchfield Pty Ltd 2 June 2010 0912 - CD 4.02 P3 West Elevation – Middap Ditchfield Pty Ltd 2 June 2010 0912 - CD 4.03 P3 South & North Elevation – Middap Ditchfield Pty Ltd 2 June 2010 The development must be undertaken and operated in a manner that causes no detrimental effect upon the amenity of the neighbourhood by reason of the creation of excessive noise, lighting nuisance or other emissions. Security in the form of a cash bond or trading bank guarantee to the sum of $10,000 must be submitted, to secure performance of all conditions of this approval, prior to the issue of a Development Permit for Operational Works. The cash bond or trading bank guarantee will be returned on performance of the conditions of approval less any costs incurred by Council in respect of enforcing performance of this permit. The requirements of this development approval are to be effected, prior to the use of the premises. Council reserves the right to call upon the bond or guaranteed sum referred to in this approval to effect compliance with conditions. The developer must obtain all of the other Development Permits referred to in the Decision Notice, prior to obtaining a Development Permit for Building Works. The Development Permit for a material change of use lapses if the use has not happened by 25 October 2016, unless an application to extend the currency is approved by Council. Building Design A verification survey of the building is to be carried out by a Licensed Surveyor and a certificate lodged with Council at completion of work confirming compliance with the maximum allowable building height of 8.0 metres, measures from existing and finished ground level. Any deck or balcony areas are not to be enclosed with shutters, glass panelling or the like, thus remaining as open structures. External colours and finishes of the building shall comprise muted/environmental tones that blend with the natural environment. Mechanical plant and equipment including pool and spa pumps, pool heaters, air conditioning units and refrigeration units shall be screened by fencing or with dense vegetation 1.5 metres in height. These shall be visually integrated into the line of the building and roof design and do not project beyond the height or width of the building when viewed from the street or other properties. Landscaping The open space and setback areas are to be landscaped in accordance with Council’s Planning Policy 3 - Landscaping Plants & Guidelines using suitable coastal species and a properly prepared landscape plan prepared by a suitably qualified Landscape Architect or Horticulturalist. Such landscaping is to be completed prior to the premises being occupied and maintained at all times thereafter. The landscape plans required to be submitted are to denote areas of existing vegetation or existing trees proposed or required to be retained and shall include: Native screening vegetation provided within garden beds with a minimum of 500mm width along the side and rear boundaries; Exclusive clothes drying areas with minimum dimensions of 25m2; Native landscaping to be provided (including the use of large trees equivalent to 60% of the height of the building on maturity) to screen the southern boundaries of the site with the adjoining building; A minimum of 2 x 45 Litre native street trees shall be established on the frontage within the road reserve and include the following species: SMALL STREET TREES IN COASTAL AREAS UNDER POWER LINES Acronychia imperforata Fraser Island apple Alectryon coriaceus Beach birds eye Acmena hemilampra Broad leafed lilly pilly Banksia aemula Wallum banksia Banksia integrifolia Casuarina glauca Swamp sheaok Elaeocarpus reticulatus Blue berry ash Eucalyptus bancrofftii Tumbledown gum Grevillea banksii Red flowering silky oak Petalostigma pubescens Quinine berry Existing trees on the site and within road reserves are to be retained, except where required to be removed due to building operations or the conduct of the approved use. Cleared vegetation is to be suitably processed by one of the following methods and removed from the site:- Processing through a woodchipper or shredder. The resulting mulch is to be stockpiled loose in heaps of less than 1000 cubic metres, less than 2.5 metres high with a minimum of 10 metres between edges of heaps. Disposal for firewood. Disposal for landscaping purposes. Transport to alternative site for breaking down materials provided that all necessary permits have been obtained to allow the alternate site to be used for this purpose. The disposal method for clearing works is to be submitted in conjunction with an application for a Development Permit for Operational Work. The Applicant is advised that other methods may be considered provided full details of the method are submitted. The Applicant is advised that burning off is an unacceptable method of disposal. Fencing Front fences and walls are to be setback an average of 1 metre, which is articulated to provide visual interest by stepping the design at maximum 5m intervals. The area of land between the fence and the front property boundary shall be densely landscaped to screen any fencing from the street. Noise Nuisance Noise emission from mechanical equipment shall comply with the following requirements: Air-conditioning and Refrigeration: 7am to 10pm: Maximum background + 5dB(A) 10pm to 7am: Maximum background + 3dB(A) Pumps: 7am to 7pm: Maximum background + 5dB(A) 7pm to 10pm: Maximum background + 3dB(A) 10pm to 7am: No audible noise. Submission of written certification shall be provided from a suitably qualified person confirming that the noise levels from all mechanical equipment comply when measured at either the residential boundary or outside the most exposed part of an affected building, whichever is the closest to the equipment. The assessment and certification is required immediately after installation of the equipment and prior to any occupation of the building, and in a format approved by Council. All equipment should be operating at the same time to test the overall noise level created. Advice: It is highly recommended that the person you engage to certify the installation is involved at the plan development stage so they can recommend where this equipment is best located. They can also advise about noise enclosures and can make other suggestions to avoid noise problems. It is a lot more costly to try and deal with noise problems after everything is built. Noise from residential building works shall comply with the following – Limited to between 7:00am to 6:30pm Monday to Saturday. All reasonable measures are taken to minimise noise emissions. Not permitted on Sunday or public holidays. Infrastructure Contributions The applicant must pay contributions towards trunk infrastructure in accordance with the following Planning Scheme Policies and Council Policies: (a) Planning Scheme Policy 12 – Public Open Space Contributions; (b) Planning Scheme Policy 13 – Contributions in Lieu of Off Street Parking; (c) Planning Scheme Policy 16 – Sewerage Headworks Contributions; (d) Planning Scheme Policy 17 – Water Supply Headworks Contributions; (e) Planning Scheme Policy 20 – Pathway Trunk Network Contributions; (f) Council Policy – Rural Roadworks Contributions; (g) Council Policy – Master Drainage Contributions. For material change of use of premises approvals the contributions must be paid prior to the commencement of use, for reconfiguring a lot approval contributions must be paid prior to Council approval of the plan of subdivision. The actual amount of the contribution must be calculated and paid in accordance with the Planning Scheme Policies and variations due to indexation current at the time of payment. Operational Works Assessment Vehicle Access A vehicular access driveway to serve the development on Lots 84 and 85 M11112 (Numbers 22 & 20 Tristania Drive respectively) shall be constructed from the Tristania Drive frontage of the site generally as shown on drawing number Drawing No CD 1.01 P6 Project No 0912 dated 2 June 2010 by Middap Ditchfield Pty. The first 6m of the driveway measured from the kerb line in Tristania Drive shall be 5.5m wide to allow for car passing opportunities. The driveway shall be designed and constructed to Council’s design standards and to grades that prevent vehicles from scraping and/or bottoming whilst also allowing pedestrians movements along the footpath without any step or level difference. Should any driveways be constructed to grades that do not comply with AS/NZS 2890.1-2004, Council will require that the driveway be removed and reconstructed to levels that do comply. Please note, a step between the driveway and the footpath shall be avoided, as it is preferred to have the footpath continue at a constant grade to minimise the potential for pedestrians to trip or fall. Vehicle Access Easement A reciprocal vehicle access easement shall be created on Lots 84 and 85 M 11112 to encompass all the proposed driveway and vehicle turning areas generally as shown on Drawing No CD 0.04 P2 project No 0912 dated 2 June 2010 by Middap Ditchfield Pty Ltd. In this regard, plans submitted for Operational Works approval shall accurately show the location of the easement. In addition, the Applicant’s Solicitor shall give Council’s Solicitor an appropriate undertaking in writing that the Title Deed and the easement documents will be lodged at the Land Titles Office and any additional Titles Office forms or requisitions requiring the consent of Council will be attended to promptly. A duly executed copy of the easement shall be submitted to Council for perusal prior to the use commencing. Any changes required by Council’s Solicitor must be corrected immediately. All legal and administration costs shall be paid by the developer. Car Parking Carparking shall be provided within the site generally as shown on drawing number Drawing No CD 1.01 P6 Project No 0912 dated 2 June 2010 by Middap Ditchfield Pty Ltd, except as modified by these conditions. The driveway, garages and carparking areas shall be designed to comply with the provisions of AS/NZS 2890.1-2004 for user class 1A with allowance for vehicles to enter and leave the site in a forward gear in three movements, with a minimum head clearance (headroom) at any point of 2.3m. Frontage Works Footpath improvements such as topsoiling, grassing, and tree planting are required to the Tristania Drive frontage of the site in accordance with Planning Scheme Policy PSP03 Landscaping Plants & Guidelines. Grass shall be couch, free of weeds. A new 1.5m wide concrete path shall be constructed along the Tristania frontage of the site in accordance with Council’s design standards and to an alignment that protects any significant vegetation or any underground services and to smoothly join any existing pathway. All paths, driveways and parking areas associated with this development shall be designed and constructed to ensure pedestrian safety using non-slip materials, to produce an evenly graded surface finish, and to be in accordance with the Disability Discrimination Act 1992 and Australian Standard 1428.1 - Design for Access & Mobility. All redundant vehicular crossings to the site shall be removed and replaced by kerb & channel, footpath paving and landscaping such as trees and grasses in accordance with Council’s Standard specifications prior to commencement of the use permitted by this permit. Roof Water & Stormwater Drainage Roof runoff from any new building shall be directed to a rainwater storage system or tank that is installed within the property to ensure water from the rainwater storage system or tank is used for external uses (such as watering gardens, irrigation, ornamental ponds, water features, topping-up swimming pools, outdoor cleaning, etc) and for internal (ground floor) use in washing machine cold taps and toilet cisterns. All rainwater tanks are to be designed and installed in accordance with the Queensland Development Code (QDC) current at the time of building approval, and shall be part of the plumbing application for approval. The location and capacity of the tanks shall be clearly shown on the plans submitted for Building Works and Operational Works approvals and any overflow shall be discharged into the existing stormwater system (stormwater structure or kerb & channel) at Tristania Drive. All stormwater drainage (including roof water overflow from the rainwater storage system) shall be collected and discharged so there is no net increase in stormwater runoff from the site. Stormwater drainage permitted to drain from the site shall be discharged to Council’s: existing drainage system (kerb & channel or/and stormwater structures) in Tristania Drive generally as shown on drawing No 10031 -2 A dated 20 May 2010 by Ian Bradford. Detailed plans of the drainage design for operational works shall be prepared by a suitably qualified and experienced person and submitted to Council prior to obtaining a Development Permit for Operational Works. The maximum discharge of stormwater drainage allowable to Council’s kerb & channel street drainage system at any one location is 25 litres/second. The applicant shall modify the existing kerb inlet pit on the frontage of the site to a grated inlet pit. The applicant shall construct a new grated kerb inlet pit upstream of the proposed access driveway and link to the existing pit by a 375mm RCP pipe. The driveway construction shall cater for a stormwater secondary flowpath over the driveway and a gap 4m wide and at least 120mm high shall be provided under the rear fence in accordance with the recommendations of the stormwater drainage investigation report dated 24 May 2010 Ref 0812 by Covington Engineers. The development shall not cause diversion of stormwater or adversely impact on the existing drainage conditions on adjoining properties or the road reserve. To ensure that polluted run-off does not enter Council’s stormwater drainage system, stormwater run-off from the carparking areas and the driveways shall have the first flush (the first 12 mm of rainfall or hose-down) collected in a grease/oil arrestor/gross pollutant trap provided on site prior to being permitted to discharge into Council’s drainage system. All other clean stormwater, such as roof water, can be collected on site and discharged through a single underground drain line directly into the existing drainage system, bypassing the grease/oil arrestor/gross pollutant trap. To this end, a detailed maintenance plan shall be prepared for the proposed grease/oil arrestors/gross pollutant trap, which shall be submitted to the Council for approval prior to obtaining a Development Permit for Operational Works. The approved maintenance plan shall be incorporated in the Community Management Scheme for the development and a copy of this shall be provided for Council’s records prior to commencement of the approved use. A Development Permit for Building Works shall not be granted until a Development Permit for Operational Works has been issued in regard to the drainage scheme. All site stormwater drainage shall be by means of a gravity system. The existing 300mm stormwater drainage pipeline on the site shall be inspected by closed circuit television (CCTV) prior to the commencement of the civil works on the site, any existing damage or blockage shall be rectified by the developer prior to the construction of the driveway. Also, following satisfactory completion of the construction works all new stormwater pipelines that will be a Council’s asset and stormwater inter-allotment drainage shall be inspected by CCTV. CCTV inspections will be carried out by Council's CCTV contractor and arranged by Council. The developer will be responsible for the full cost of CCTV inspections, including any additional inspection necessary following defect identification and rectification. This charge is payable prior to the issue of Operational Works approval and will be determined on the unit rate basis current at the time of approval. Service Easements on Lot 85 M11112 (Stormwater) A registered easement shall be required over any stormwater drainage pipes or overland flow paths within the site that convey stormwater from a Council road. The easement shall be in favour of Council, be a minimum of 3 metres wide within the site and be located adjacent to the northern boundary of the subject site. The Applicant’s Solicitor shall give Council’s Solicitor an appropriate undertaking in writing that the Title Deed and the easement documents will be lodged at the Land Titles Office and any additional Titles Office forms or requisitions requiring the consent of Council will be attended to promptly. A duly executed copy of the easement shall be submitted to Council for perusal prior to the use commencing. Any changes required by Council’s Solicitor must be corrected immediately. No building or other structure shall be constructed or encroach over an easement. Earthworks All earthworks (filling or excavation) required on site shall be carried out in accordance with Council’s Planning Scheme Policy PSP5 – Engineering Design Standards. Filling on the site shall not cause any additional ponding of water on any adjoining lands or the blockage of, or interference with, any natural watercourses. Any imported fill to the site may only be from a site licensed with The Environmental Protection Agency or from a site for which a Development Permit for Operational Works has been issued approving the export of fill. Earthworks carried out on site shall not affect the structural integrity of any of the existing fences or structures that border the development site. Fences that are affected shall be replaced prior to the Building Certifier issuing the Certificate of Classification. In this regard any fences to be replaced shall be clearly shown on the plans submitted for Operational Works approval. Erosion and Sediment Control Any person acting on this permit shall prevent erosion and sediment export from leaving the site. Site control measures such as silt fencing, controlled gravel access to the site and controlled disposal of waste, will be necessary. In this regard plans detailing the methods of controlling erosion and sediment are required to be submitted to the Council for approval prior to obtaining a Development Permit for Operational Works. General Engineering Requirements A suitably qualified Registered Professional Engineer shall prepare engineering drawings and specifications for all engineering works that will become Council infrastructure, which shall be submitted in conjunction with an application for a Development Permit for Operational Works. In this regard a DXF/DWG file on GDA94 zone 56 grid of the proposed cadastre layout is to be submitted in conjunction with any application for Operational Works. Digital detailed designs including drawings, calculations, specifications and a schedule of works shall be submitted with any application for a Development Permit for Operational Works in respect of roadworks and stormwater drainage works. The design shall be in accordance with Council’s Planning Scheme Policy PSP05 – Engineering Design Standards – Roads, Drainage and Earthworks. To avoid conflict with underground pipes or services, all existing and proposed services required by the development shall be shown on the plans. To facilitate production of As Constructed drawings it is suggested that all design drawings are submitted in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the use of ADAC are available at www.adac.com.au). Any damage caused to any public utility during the course of construction shall be repaired to Council’s standards and at no cost to Council. Any alteration of any public utility or other facilities necessitated by the development of the land or associated construction works external to the site shall be at no cost to Council. The transportation of all materials to and from the site shall be undertaken in a manner such that no particle matter escapes onto a public road. All vehicles carrying materials either to or from the site shall be covered to prevent materials including dust being windblown from the vehicle. As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer for design intent, and a Licensed Surveyor shall certify the cadastre and the location, level and type of all services and structures. All of which shall be submitted to Council for checking and for Council’s records. The data must fully detail levels for all engineering works including but not limited to drainage structures, finished ground levels and pavement surface levels. The data shall be submitted in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the use of ADAC are available at www.adac.com.au). Approval of works shall not be granted until all As Constructed information has been supplied and accepted by Council. Unity Water Reticulated water supply and sewerage must be provided to the development. Separate 25mm PE water services must be installed to a common lot boundary with independent meters installed outside the boundary of the lot in accordance with Sunshine Coast water standard drawing SCW 361. Meters must be “Elster” PSM 50100/39 (dual check). The sewer inspection opening must be located a minimum of 1.0 metre from any structure and be raised to the finished surface level of the site. If located within the paved driveway area the inspection opening must be finished with a brass cap. Storm water retention systems and gross pollutant traps must maintain a minimum clearance of 1.5 metres from Council water supply and sewerage infrastructure . Landscape planting within 1.5 metres of Council sewerage infrastructure must be Council approved varieties and low growing when mature. Construction works undertaken in the vicinity of Council water supply or sewerage infrastructure must not adversely affect the integrity of the infrastructure. All costs associated with repair, replacement or alteration of infrastructure must be met by the applicant. referral agency conditions The referral agencies applicable to this application are: Reason for Referral Relevant Regulation Referral Type Referral Agency Agency Address Material change of use - Contaminated land (unexploded ordnance) Sustainable Planning Regulation 2009 - Schedule 7, table 3, item 11 Concurrence DERM Department of Environment and Resource Management Ecoaccess Customer Service Unit PO Box 15155 CITY EAST QLD 4002 A copy of any referral agency conditions was attached to the original approval. approved plans/documents The approved plans and / or documents for this development approval are listed in the following table: Plan / Document No. Issue. Plan / Document Name Date 0912 - CD 1.01 P6 Site Plan Ground Floor – Middap Ditchfield Pty Ltd 2 June 2010 0912 - CD 0.04 P2 Easements – Middap Ditchfield Pty Ltd 2 June 2010 0912 - CD 2.01 P5 Site 20 Ground Floor Plan – Middap Ditchfield Pty Ltd 2 June 2010 0912 - CD 2.02 P5 Site 20 First Floor Plan – Middap Ditchfield Pty Ltd 2 June 2010 0912 - CD 2.03 P3 Site 20 Roof Plan – Middap Ditchfield Pty Ltd 2 June 2010 0912 - CD 4.01 P3 East Elevation – Middap Ditchfield Pty Ltd 2 June 2010 0912 - CD 4.02 P3 West Elevation – Middap Ditchfield Pty Ltd 2 June 2010 0912 - CD 4.03 P3 South & North Elevation – Middap Ditchfield Pty Ltd 2 June 2010 advisory notes The following Advisory Notes are for information purposes only and do not form conditions of approval: General Pursuant to the Building and Construction Industry (Portable Long Service Leave) 1991 Act if the cost of operational works exceeds $80,000, then a portable long service leave levy is required to be paid. In accordance with Section 77.(1) of the Act, Council is required to sight the approved form issued by the Building and Construction Industry (Portable Long Service Leave) Authority that confirms that the requirements of the Act have been satisfied. A statutory declaration outlining the cost of the operational works must be submitted to Council with the lodgement of any application for operational works over the site. The development should be undertaken in a manner that causes no detrimental effect upon the amenity of the neighbourhood by reason of the creation of excessive noise, lighting, air-borne hazards, atmospheric pollutants (including dust or odours) nuisance or any other emissions in accordance with the nuisance provisions of the Environmental Protection Regulation 1998 or Council’s Local Law No. 12 – Control of Nuisances. In accordance with the Environmental Protection (Water) Policy 1997, all sand, silt, mud, paint, cement, concrete, builder’s waste or rubbish should not be permitted to enter or be placed where it could reasonably be expected to move into a roadside gutter, storm water drain or a watercourse. On the spot fines apply for such offences. The applicant is advised that a Compliance Permit for all plumbing and drainage works within the boundaries of the development site shall be obtained from Council’s Plumbing Services Section prior to obtaining a Development Permit for Building Works. It is recommended that applications for Operational Works for permit 2010/0811 on Lot 84 M11112 and permit 2010/0812 on Lot 85 M 11112 should be combined. Water & Sewerage Connection to Council live water mains must be undertaken by Council at the applicants cost. Water meters must be located on alternative boundaries to power boxes. Water meters approved for use in the Sunshine Coast region may be purchased direct from “Elster” and installed by the developer, or Council can provide the meters and undertake the works. Meters must be “Elster” PSM 50100/39 (dual check). Council's quotation for the works will be prepared upon request. Infrastructure Contributions and Infrastructure Charge An advice notice outlining the estimated infrastructure contributions payable and the basis for their calculation under the current Planning Scheme Policies and Council Policies is attached with this Development Permit. The applicant is informed that this development permit will trigger an Infrastructure Charge in accordance with the Coastal Major Road Network Infrastructure Charges Plan for the estimated amount of $4,174.00 and is subject to variations in the Consumer Price Index, All Groups Brisbane from March 2010 until the date of payment. An Infrastructure Charge Notice will be issued in accordance with Chapter 8 of the Sustainable Planning Act 2009. Please contact Council's Infrastructure Charges Officer (email: [email protected]) a minimum of 5 business days prior to payment of the infrastructure contributions and/or charge notice so a payment advice detailing the amounts applicable at the time of payment may be issued to accompany the payment. Payment of infrastructure contributions and/or infrastructure charge notices will not be accepted by credit card transaction. Aboriginal Cultural Heritage Act 2003 There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003. The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries out an activity must take all reasonable and practicable measures to ensure the activity does not harm Aboriginal cultural heritage.” It is an offence to fail to comply with the duty of care. Substantial monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions may also be issued by the Land and Resources Tribunal, and the Minister administering the Act can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value of Aboriginal cultural heritage. You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any obligations under the ACH Act. property notes Not Applicable PRELIMINARY APPROVAL OVERRIDING PLANNING SCHEME Not Applicable further development permits required Development Permit Operational Works for Access and Carparking, Stormwater Drainage, Frontage Works, Landscaping, and Erosion & Sediment Control Development Permit All Building Works self assessable codes Not Applicable submissions Not Applicable reasons / grounds for appoval Not Applicable rights of appeal You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Sustainable Planning Act 2009 is attached. other details If you wish to obtain more information about Council’s decision, electronic copies of which are available on line at www.noosa.qld.gov.au, or at Council offices. DECISION NOTICE HISTORY Original Decision Notice 12 July 2010 Negotiated Decision Notice 25 October 2010 Compiled Decision Notice 30 June 2014 Yours faithfully kerri coyle planning & environment, manager Encl. Appeal Rights cc Unitywater Department of Environment and Resource Management Ecoaccess Customer Service Unit PO Box 15155 CITY EAST QLD 4002 Appeal Rights SUSTAINABLE PLANNING ACT 2009 & SUSTAINABLE PLANNING REGULATION 2009 The following is an extract from the Sustainable Planning Act 2009 (Chapter 7) 466 Appeals about decisions relating to permissible changes (1) For a development approval given for a development application, the following persons may appeal to the court against a decision on a request to make a permissible change to the approval— (a) if the responsible entity for making the change is the assessment manager for the application— (i) the person who made the request; or (ii) an entity that gave a notice under section 373 or a pre-request response notice about the request; (b) if the responsible entity for making the change is a concurrence agency for the application—the person who made the request. (2) The appeal must be started within 20 business days after the day the person is given notice of the decision on the request under section 376. (3) Also, a person who has made a request under section 369 may appeal to the court against a deemed refusal of the request. (4) An appeal under subsection (3) may be started at any time after the last day the decision on the matter should have been made. [word/footer1.xml] Page 13 of 13 [word/footer2.xml] Page 1 of 13 [word/header3.xml] 132010.812.02 [Attachment: image1.jpeg (image text)] NOOSACOUNCIL Pest 2iopss2esm ——atgroxagngoas aoe TowotNaoeses — Florssvessi — atoomagagara [Attachment: image2.png (image text)] K Coy fs [Attachment: image3.png (image text)] a mm NOOSA COUNCIL
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
132010.812.02 Compiled Decision Notice.docxRelated documentApplication case desk ↗
About this file
- File size
- 150 KB (small file)
- File type
- DOCX
No other editions are linked here.