Noosa on Weyba
Needs Assessment
average of 13.1 % of retirees in 2011. This increase in retirees reflects an increased need for retirement
living options within the surrounding area.
Based on Table 13 and Figure 8, there are currently a number of retirement living options in the surrounding
area. These include retirement villages, aged care communities and independent living units. This use
therefore does not represent a new product in the region. The proposed approx 220 retirement living / aged
care apartments to be provided on the subject site will cater to the growing ageing population in the Noosa
District.
8.6 Planned and Proposed
8.6.1 Residential Developments
RPS conducted a search of PD Online on Sunshine Coast Regional Council’s website for planned and
proposed residential developments and found an approval for the Peregian Springs ’Ridges’ development
which forms the southern part of the Peregian Springs residential community. FKP Residential
Developments has continued to lodge development applications with Sunshine Coast Regional Council for
subsequent stages of this community-titled development, with expected completion in 2018. FKP
Residential Developments has also lodged development applications for subsequent stages of the adjacent
Coolum Ridges development.
8.6.2 Retirement Developments
In 2011 construction commenced on a 90 bed nursing home at Ridgeview Drive, Peregian Springs. The
developer is Arcare, a leading provider in aged care services. Construction is expected to be completed in
2012 and the facility is anticipated to employ around 130 people once operating.
Also planned for Peregian Springs is a retirement village on Old Emu Mountain Road. The village is set to
comprise of 146 units. The developer, FKP Residential Developments Pty Ltd, submitted the development
application in July 2010 and it is still pending.
8.7 Length of Supply
In determining the length of timeframe of supply, remaining land estimates derived from the 2009 South East
Queensland Broadhectare Study have been used.8 Table 14 outlines the residential supply timeline for the
Noosa District and Maroochy North area utilising the 2009 South East Queensland Broadhectare Study and
underlying demand for land in each of these areas (outlined in Section 7.4 Underlying Residential Demand).
In estimating the remaining lots in each area, a 75% conversion has been applied as it is considered that
approximately 75% of lots may realistically be brought to the market given potential development constraints
such as environmental constraints, landholder intent, lower than expected densities, funding constraints and
required amalgamation for larger developments.
Table 14 Residential Supply Timeline
Remaining Lots . .
Demand Tlmelme
10 Converslon
(7501 .)
Noosa District 712 235 3.0
Maroochy North 3,225 485 6.6
Total 3,937 720 9.7
Source: RPS
8
The 2009 Broadhectare Study designates a larger area of supply for the Noosa District and Maroochy North area than
the Sunshine Coast Regional Council Planning Scheme, and as such has been used as a more conservative estimate.
111861-1; November 2012 Page 45
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 23 of 37 Appendix 21 - Needs Assessment MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 41.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.