Council archive · source document
Part 23 of 37 Appendix 21 - Needs Assessment MCU12/0208
Very large file (41.7 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Noosa on Weyba
Needs Assessment
Table 17 Economic Impacts
Effect
Criteria
Positive Neutral or Negative Net Comment
Uncertain Total
Increases or decreases + + 600 Sq M of retail space to service the Noosa on Weyba resident population as well as visitors to the extended Noosa National
Economic
1 retail and other servi s Park.
Impacts within the local area
Increases or decreases + + In addition to the 600 Sq M of retail space, the additional 139.5 Ha of Send Land to be included as part of Noosa National Park will
facilities within the local unlock the major component of Lake Weyba and provide access to a greater range of Park.
area
Belter uses or makes + + Development of the subject site will provide a more efficient use of existing infrastructure and provide additional population to
redundant existing support the employment and retail uses.
infrastructure
Impact on existing + + Provides additional population to support the employment and retail uses. Additional 139.5 Ha of Send Land to be included as part
economic land uses of Noosa National Park expected to increase the number of visitor nights to Noosa National Park by 5% (88,116 visitor nights) and
(commercial,tourism, etc) expenditure by approximately $11.8 million.
2
Improves or reduces + + Development of the subject site will provide local jobs through the construction pro ss as well as through operation and
Employment maintenance of the Body Corporate, retirement living / aged care apartments and retail space.
access toemployment
Increases or decreases + + Provision of additional employment in construction and maintenan and operation of development.
long term jobs (temporary
or permanent)
Impact on skills / 0 0 No change to current situation
education
Safeguards or threatens 0 0 No change to current situation
existing jobs
Jobs created directly from
3 Investment
the development
-
construction phase + +
Equivalent of 909 full time jobs onsite and 1,167 full time jobs offsite during construction of the development.
-
ongoing operation + + At completion, the development is anticipated to host 141 operational jobs onsite (e.g. aged care, retail, home based business, Body
Corporate) and 177 operational jobs offsite (e.g. retail, education and servi sectors).
Investment in the
development
-
construction + + $177.4 million
111861-1; November 2012 Page 56
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 23 of 37 Appendix 21 - Needs Assessment MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 41.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.