Original source · versioned page text
APPENDIX C - State Assessment
Attached to the e-mail MCU18/0204 - Development Application - 6 Heron Street, Peregian Beach.
STATE CODE 13: UNEXPLODED ORDNANCE Table 13.2.1: Material change of use and reconfiguring a lot Performance outcomes Acceptable outcomes Response PO1 A contractor approved by No acceptable outcome is This requirement can be conditioned the Commonwealth Department prescribed. and required to be carried out prior to of Defence has certified that the commencement of building work. area identified as having substantial UXO potential has been remediated or can be managed to be suitable for the proposed use. Note: A UXO search can be conducted through the Australian Department of Defence located at www.defence.gov.au/uxo. The Australian Department of Defence maintains a list of approved UXO consultants (D2) and contractors (F2) on the Defence Environment and Heritage Panel. Further details are located at: www.defence.gov.au/estatemana gement/support/DEHP/WhoToEn gage.asp.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original