Skip to the record
Accept no substitutions.

Original source · versioned page text

APPENDIX C - State Assessment

Attached to the e-mail MCU18/0204 - Development Application - 6 Heron Street, Peregian Beach.

of 22

Page text shows just the words. Original shows the document exactly as it was published.

STATE CODE 13: UNEXPLODED ORDNANCE
Table 13.2.1: Material change of use and reconfiguring a lot

 Performance outcomes                Acceptable outcomes        Response

 PO1 A contractor approved by        No acceptable outcome is   This requirement can be conditioned
 the Commonwealth Department         prescribed.                and required to be carried out prior to
 of Defence has certified that the                              commencement of building work.
 area identified as having
 substantial UXO potential has
 been remediated or can be
 managed to be suitable for the
 proposed use.



 Note: A UXO search can be
 conducted through the Australian
 Department of Defence located
 at www.defence.gov.au/uxo.

 The Australian Department of
 Defence maintains a list of
 approved UXO consultants (D2)
 and contractors (F2) on the
 Defence Environment and
 Heritage Panel. Further details
 are located at:
 www.defence.gov.au/estatemana
 gement/support/DEHP/WhoToEn
 gage.asp.
Log in to download the original file

APPENDIX C - State Assessment.pdf · 285 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.