Part 1 of 2 - Part 1 of 2 - 177 Shorehaven Drive, Noosaville · OPW10/2149
‘Ne Writecodéhere ° Z OO SS\3 6 _ THIS IS THE NEXT PART OFA MULTIPLE PART RECORD a Part _| Of 2 Application num . De — ‘ . . EVelaAnn, _- HALAM:BCS IAMINFORMATION MANAGEMENT:RECORDS MANAGEMENT:Contro! of Records EORMEIMUli PgGREchRA Bove Sheet NEXT PARTS [ | Fb ee tec f Owe: Fi
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 15 pages
Page 2
(ASS SuINS CIN
Meena eae
eh
Application Details - IDAS form 1
(Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)
You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all
necessary information and documentation will result in your application not being a properly made application.
For all development applications, you must:
. complete this form (Application details - IDAS form 1)
* complete any other forms relevant to your application
* provide any mandatory supporting information identified on the forms as being required to accompany your
application.
All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable
Planning Regulation 2009.
Applicant details (note: the applicant is the person responsible for making the application and need not be the
owner of the land. The applicant is responsible for ensuring the information provided on all IDAS application forms is
correct. Any development permit or preliminary approval that may be issued as a consequence of this application will
be issued to the applicant.)
Please note: If there is more than one applicant, provide additional applicant details by clicking the "Add another
applicant" button below.
Namels (individual or company name in full) Pile-It Pty Ltd t(a Noosa Jetty Builders
For companies, contact name Emma Reed
Postal address PO Box 299 Noosaville QLD 4566
Contact phone number 07 5474 3480
Mobile number (non-mandatory) 0408 137 526
Fax number (non-mandatory) 07 5474 3480
e-mail address (non-mandatory) [email protected]
1. What is the nature of development proposed? (tick all applicable boxes)
L] material change of use of premises
[] building work
[¥] operational work
C1 reconfiguring a lot Development Counter
19 OCT 2010
Tewantin
Department of Infrastructure and Planning
& * ake,
re
Page 3
——|2; What type of approvatis being sought? « . LILO development permit [preliminary approval [] both - provide details below 3. ts the application for a mobile and temporary environmentally relevant activity (ERA)? [e] No [| Yes - complete table A and then go to question 5 4. Location of the premises (complete table B and/or table C as applicable. Identify each lot in a separate row) Table 6 - street address/lot for the premises or street address/lot on pian for the land adjoining or adjacent to the premises Street Address Lot on plan description Local government area Unit | Street Street name and official Post Lot No Plan type (e.g. Logan,Cairns) No. | No. suburb/locality name code ‘) and plan no. 1 177 | Shorehaven Drive Noosaville | 4566 | 710 | SP100034 eunsnine Coast Regional ‘ounci (Street address / lot on plan Street address / lot on plan for the land adjoining or adjacent to the premises (appropriate for development in- cy) water e.g. jetty, pontoon) Table C - premises coordinates (appropriate for development in remote areas, over part of a lot or in water e.g. channel dredging in Moreton Bay) Coordinates (note: place each set of coordinates in a separate row) Zone Datum Local government - 7 ~ - reference area (If applicable) Easting Northing | Latitude | Longitude [J GDA94 (] wess4 1 (] other 5. Total area of the premises on which the development is proposed (indicate hectares or m?) 803m2 6. Current use/s of the premises (e.g. vacant land, house, apartment building, cane farm, etc.) 1 | House 7. Provide a brief description of the proposal (e.g. six unit apartment building, 30 lot residential subdivision etc.) Boat Lift Application Details - IDAS form 1 Version 1.0 18 December 2009
Page 4
ooo
8-1s-owner's consent required for this application? (refer to notes at the end of this form for more information)
Lj No
[#] Yes - complete either table D, table E or table F as applicable
Table D (note: do not complete this table if lodging the application on-line using Smart eDA)
Name of owner/s of the land SBM Enterprises Pty Ltd ATF MBS Unit Trust
{We, the above-mentioned owner/s of the land, consent to the making of this application.
ae
Signature of owner/s of the land Jm—
7, ~~
{3
Date n\is|2010
Table E
Name of owner/s of the land
[_] The owner's written consent is attached or will be provided separately to the assessment manager
Table F
Name of owner/s of the land
By making this application, |, the applicant, declare that the owner has given written consent to the making of
O the application.
9. Does the application involve a state resource? (e.g. the application involves state land, or taking quarry
materials. Refer to the notes at the end of this form for more information)
[e] No [Yes - complete table G
10. Identify if any of the following apply to the premises (tick applicable box/es)
YY] adjacent to a water body, watercourse or aquifer (e.g creek, river, lake, canal) - complete table H
[] | on strategic port land under the Transport Infrastructure Act 1994 - complete table !
L] _ ina tidal water area - complete table J
Table H Name of water body, watercourse or aquifer
1 | Noosa Waters Canal
11. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overland flow,
water, etc.)
{e]No [_] Yes - ensure the type, location and dimension of each easement is included in the plans submitted
Application Details - IDAS form 1
Version 1.0 18 December 2009
Page 5
J
ooo
412.-Does-the- proposal include. new w building: work. or. operational work-o! on nthe premises? (including: any-
“ services) # ee i e a 4
LJNo_ [e] Yes - ensure the nature, location and dimensions of proposed works are included in plans submitted
13. Is the payment of a portable long service leave 2 levy applicable to this application? (refer to the notes at the
end of this form for more information) 9-0 us Sa .
[*] No - Go to question 15 L Yes
15. Has the local government agreed to apply a superseded planning ¢ scheme to this application under.
section 96 of the Sustainable Planning Act 2009? * | " Poo
see id
{e] No
[]_ Yes - provide details below
16. List below all of the forms and-supporting information that accompany this application (include all IDAS :
forms, checklists, “mandatory supporting information etc. that will be submitted’as- Part of this application. Note: this vA
question does not apply for applications made online using Smart eDA);
Method of lodgement to to
Description of attachment or title of attachment
assessment manager
4 | Form6 over the counter
2 | Checklist : over the counter
3 John Norden Plans , over the counter
17. Applicant's declaration
By making this application, | declare that all information in this application is true and correct (note: it is
[v] unlawful to provide false or misleading information).
Application Detaiis - IDAS form 4
Version 1.0 18 December 2009
Page 6
$ --—Notes-for-completing-this-form » a i LO Question 8: ¢ Section 263 of the Sustainable Planning Act 2009 sets out when the consent of the owner of the land is required for an application. Section 260(1)(e) of the Sustainable Planning Act 2009 provides that if the owner's consent is required under section 263, then an application must contain, or be accompanied by, the written consent of the owner, or include a declaration by the applicant that the owner has given written consent to the making of the application. *® Owner's consent is not required for a mobile and temporary ERA. Question 9: e Section 264 of the Sustainable Planning Act 2009 provides that if a development invoives a state resource, a regulation may require the application to be supported by certain evidence prescribed under the regulation. Schedule 14 of the Sustainable Planning Regulation 2009 prescribes the state resources for which evidence is required to be given, and the evidence required, to support the application. Question 13: « The Building and Construction Industry (Portable Long Service Leave) Act 1991 prescribes when the portable long service leave levy is payable. e The portable long service leave levy amount and other prescribed percentages and rates for calculating the levy are prescribed in the Building and Construction industry (Portable Long Service Leave) Regulation 2002. Question 14: . « The portable long service leave levy need not be paid when the application is made, but the Building and Construction Industry (Portable Long Service Leave) Act 1991 requires the levy to be paid before a development permit is issued. ¢ Building and Construction Industry Notification and Payment Forms are available from any Queensland post office or agency, on request from QLeave, or can be completed on the QLeave website at www.gleave.qid.gov. au. For further information contact QLeave on 1800 803 481 or www.qleave.qid.gov.au. Privacy -the information collected in this form will be used by the Department of Infrastructure and Planning (DIP) in accordance with the processing and assessment of your application. Your persona! details will not be disclosed for a purpose outside of the IDAS process, except where required by legislation (including the Right to Information Act 2009) or as required by Parliament. This information may be stored in a departmental database. The information collected will be retained as required by the Public Records Act 2002. OFFICE USE ONLY Date received Reference numbers NOTIFICATION OF ENGAGEMENT OF A PRIVATE CERTIFIER To: Council. | have been engaged as the private certifier for the ‘ building work referred to in this application. Date of N BSA Certification Building Jame : oan engagement . license number classification/s Application Details - iDAS form 1 Version 1.0 18 December 2009
Page 7
ey on of why i OOO QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager or private certifier if applicable) Date receipted a QLeave Project |Amount ., |form sighted by |Name of officer who Description of the work Number paid ($) Date paid assessment __|sighted the form manager The Sustainable Planning Act 2009 (SPA) is administered by the Department of Infrastructure and Planning. This form and all other required application materials should be sent to your assessment manager and any referral agencies. Application Details - IDAS form 1 Version 1.0 18 December 2009
Page 8
PP
*
—
integrated: Development Assessment. System form
Building or operational work assessable
against a planning scheme - IDAS form 6
(Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)
This form must be completed for development applications for building works or operational work assessable against
a planning scheme.
You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all
‘necessary information and documentation will result in your application not being a properly made application.
For ali development applications, you must:
¢ complete Applicant details - IDAS form 4
. complete any other forms relevant to your application
« provide any mandatory supporting information identified on the forms as being required to accompany your
application. .
All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning
Regulation 2009.
This form can also be used for development on strategic portland under the Transport Infrastructure Act 1994.
1. What is the nature of the work that requires assessment against a planning scheme? (tick applicable box/es)
[7] building work --compiete table A [X] operational work - complete table B
Table B
What is the nature of the operational work made assessable in the planning scheme? (tick applicable box/es)
(J read works (1 stormwater water infrastructure
CJ drainage Works (F earthworks (0) sewerage infrastructure
(J landscaping (J signage : {[] clearing vegetation under the planning scheme
( other - please specify below
What type of approval is being sought? (if you have indicated multiple works in the above question, please
use an attachment to this form to detail each approval request)
[X] development pennit (J preliminary approvat (_] both - specify below
Is the operational work necessary to facilitate the creation of new lots? (e.g. subdivision)
No (J Yes - specify the number of lots being created
Are there any current approvals associated with this application? (e.g. materia! change of use)
No (7 Yes - provide details below
PITA eO ee
/ LE, oY oeknr
oS Oey
Page 9
” DOU e 2. What is the dollar value of the proposed building work? (inc GST, materials and labour)| $ 14,640 Building and operational work assessable against a planning scheme - [DAS form 6 ’ Version 1.0 18 December 2009
Page 10
OO
3. Confirm the following mandatory supporting information accompanies this application
Confirmation
of lodgement Method of lodgement
All applications for operational works
site plans drawn to scale which show the following:
e the location and site area of the land to which the application relates
(relevant land)
the north point
the boundaries of the relevant land
the allotment layout showing existing lots, any proposed lots (including
the dimensions of those lots), existing or proposed road reserves, (confirmed {over the counter
building envelopes and existing of proposed open space (note:
numbering is required for all lots) ‘
¢ any existing or proposed easements on the relevant land and their
function
® any access limitation strips
e all existing and proposed roads and access points on the relevant land
a statement about how the proposed development addresses the local
government's planning schemes and any other planning documents [_}confirmed
relevant to the application
Applications for operational works invoiving earthworks (filling and excavating)
drawings showing:
* existing and proposed contours
@ .areas to be cut and filled
* the location and level of any permanent-survey marks or reference -
‘stations used as datum for the works [confirmed
« the location of any proposed retaining wails on the relevant land and
their height
the defined flood level (if applicable)
the defined fill level (if applicable) _
Applications for operational works involving roadworks
drawings showing:
existing and proposed contours
¢ the centreline or construction line showing chainages, bearings, offsets
if the construction fine is not the centreline of the road and all
intersection points
e information for each curve including tangent point chainages and
offsets, curve radii, arc length, tangent length, superelevation (if
_ applicable) and curve widening (if applicable)
e kerb lines including kerb radii (where not parallel to centreline) and
tangent point changes (where not parallel to centreline)
edge of pavement where kerb is not constructed (confirmed
position and extent of channelisation
location and details of all traffic signs, guideposts, guardrail and other
street furniture :
pavement markings including details on raised pavement markers
catchpit, manhole and pipeline locations
drainage details (if applicable)
cross road drainage culverts (if applicable)
concrete footpaths and cycle paths
location and details for access points, ramps and invert crossings
changes in surfacing material .
oee
Building and operational work assessable against a planning scheme - IDAS form 6
Version 1.0 18 December 2009
Page 11
OO Confirmation of lodgement Method of lodgement Applications for operational works involving stormwater drainage drawings showing: existing and proposed contours drainage locations, diameters and class of pipe, open drains and easements (confirmed * manhole location, chainage and offset-or co-ordinates and inlet and outlet invert levels e inlet pit locations, chainage and offset or co-ordinates and invert and kerb levels Applications for operational works involving water reticulation drawings showing: _ . kerb lines or edge of pavement where kerb is not constructed location and jevels of other utility services where affected by water reticulation works pipe diameter, type of pipe and pipe alignment water main alignments ( confirmed water supply pump station details (if applicable) minor reservoir details (if applicable) - conduits location of valves and fire hydrants location of house connections (if applicable) location of bench marks and reference pegs. eoeeseeoeweste8 Applications. for operational works involving sewerage reticulation drawings showing: . location of all existing and proposed services location of al! house connection branches kerb lines or edge of pavement where kerb is not constructed chainages - design sewer invert levels design top of manhole levels type of manhole and manhole cover pipe diameter, type of pipe and pipe alignment location of house connections (if applicable) sewer pump station details (if applicable) location of all existing and proposed sewer lines and manhole locations Lconfirmed Applications for operational works involving street lighting drawings showing: tocation of alt light poles and service conduits location of all other cross road conduits type of wattage and lighting any traffic calming devices additional plans for roundabouts and major roads (if applicable) details of any variations to normal alignment details of fighting levels. . LJ confirmed Building and operational work assessable against a planning scheme - IDAS form 6 Version 1.0 18 December 2009
Page 12
e
Ooo
Confirmation
of lodgement
Method of lodgement
Applications for operational works involving public utility services
drawings showing:
any existing light poles and power poles
any existing underground services
details of proposed services
alternation to existing services
L|confirmed
Applications for operational works involving landscaping works
drawings showing:
the location of proposed plant species
a plant schedule indicating common and botanical names, pot sizes
and numbers of plants
planting bed preparation details including topsoil depth, subgrade
preparation, mulch type and depth, type of turf, pebble, paving and
garden edge
the location and type of any existing trees to be retained
construction details of pianter boxes, retaining walls and fences
the proposed maintenance period
irrigation system details
?
{_]confirmed
Notes for completing this form:
e This form can also be used for development applications for building works or operational works assessable
against the land use plan for Caims airport land or Mackay airport land. Whenever a planning scheme is
mentioned, take it to mean the land use plan for the airport land.
Privacy -please refer to your assessment manager for further details on the use of information recorded in
this form.
OFFICE USE ONLY
Date Received Reference Numbers
The Sustainable Planning Act 2009 is administered by the Department of Infrastructure and Planning. This form and
all other required application materials should be sent to your assessment manager and any referral agencies.
Building and operational work assessable against a planning scheme - IDAS form 6
Version 1.0 18 December 2009
Page 13
Operational Works - IDAS Checklist 4
(Sustainable Planning Act 2009, version 1.0, 18 December 2009)
This checklist only applies when the development application seeks approval for operational works.
You should complete alt questions unless the checklist indicates otherwise.
All planning and development applications require applicants to complete the following:
¢ Applicant details --IDAS form 1
. any forms or mandatory supporting information identified as forming part of your application.
If you are unsure of any answers to questions, phone or visit your local government, or go to the Depariment o of
Infrastructure and Planning's website, www.dip.qld.gov.au.
The checklist and relevant sections do not need to be completed for applications relating only to building work
requiring assessment against the Building Act 1975.
Part 1 - General questions
4.1 Is the proposed operational work assessable under the planning scheme?
[XJ No ;
° You must complete Building and operational work assessable against a planning scheme - [DAS
C] Yes form 6
} je Continue on to question 1.3
4.2 Is the proposed operational work assessable under any state planning regulatory provisions?
No ° Go to question 1.9
ClYes = j* Go to question 1.4
4.9 {s any of the proposed operational work associated with reconfiguring a lot and the reconfiguration is
also assessable?
Rd No
(J Yes . It is recommended that you complete part 6 of this checklist.
1.10 Does the Vegetation Management Act 1999 apply to any of the proposed operational work for the
clearing of native vegetation?
ix} No
(Yes ° itis recommended that you complete part 7 of this checklist.
1.141. Is any of the proposed operational work for any thing constructed or instatled that allows, under the
Water Act 2000, for taking or intertering with water from a watercourse, lake or spring (other than
using a water truck to pump water; and other than under the Water Act 2000, section 20(2), (3) or (5),
or from a dam constructed on a watercourse or lake?
No . {tis recommended that you complete part 8 (starting from question 8.8) of this checklist.
LI Yes ° It is recommended that you complete part 8 (starting from question 8.1) of this checklist.
Page 14
OO ee
1.12 1s any of the proposed operational work tidal work, other than excluded work defined under the
Sustainable Planning Regulation 20097
—X] No
(Yes * It is recommended that you complete part 9 of this checklist.
1.13 Is any of the operational work proposed to be carried out within a coastal management district?
[XJ No
(Yes ° It is recommended that you complete part 10 of this checklist.
1.14 {Is any of the proposed operational work for constructing or raising waterway barrier works under the
Fisheries Act 1994?
&X] No
(7 Yes . It is recommended that you complete part 11 of this checklist.
41.15 1s any of the proposed operational! work to be carried out completely or partly within a declared fish
habitat area under the Fisheries Act 1994?
&] No
(Yes ° it is recommended that you complete part 12 of this checklist.
1.16 Is any of the proposed operational work removing, destroying or damaging marine plants under the
Fisheries Act 1994?
IX No
C1] Yes ° It is recommended that you complete part 13 of this checklist.
1.17 {s any of the operational work proposed to be carried out in a wild river area deciared under the Wild
Rivers Act 2005?
{XJ No
LD Yes . It is recommended that you complete part 14 of this checklist.
1.18 Is any part of the premises located in part of a future state-controlled road or within 100 metres of a
state-controlled road? .
No
(1 Yes ° It is recommended that you complete part 15 of this checklist.
Part 2 - State-controlled roads
2.1 Js the proposed operational work for filling or excavating listed in the Sustainable Planning
Regulation 2009 schedule 11 and does it exceed the threshold or combined threshold?
BJ No ° End of part 2 of this checklist.
g Yes ° This application requires assessment by the Department of Transport and Main Roads as a
concurrence agency.
. End of part 2 of this checklist.
Section reference:
° Sustainable Planning Regulation 2009, schedule 7, table 3, items 1(b) and 2
Operational works - IDAS checklist 4
Version 1.0 December 2009
Page 15
a
Ooo We
[Part 8 - Taking or interfering with water
CRs {fs any of the proposed operational work for any thing constructed or installed that allows, under the
Water Act 2000, for taking or interfering with artesian water (other than using a water truck to pump
water)?
X]No
ie You must complete Taking artesian or sub-artesian water - IDAS form 12.
C]¥es . This application requires assessment by the Department of Environment and Resource
Management as a concurrence agency.
8.9 Is any of the proposed operational work for any thing constructed or installed that allows, under the
Water Act 2000, for taking overland flow water (other than using a water truck to pump water)?
ix} No ° Go to question 8.12.
(Yes
8.12 Is any of the proposed operational work for any thing constructed or installed that allows, under the
Water Act 2000, for taking or interfering with subartesian water (other than using a water truck to
pump water)?
No ° Go to question 8.14
(Yes
8.14 Does any of the proposed operational work for any thing constructed or installed that allows, under
the Water Act 2000, for interfering with overland flow water (other than using a water truck to pump
water)?
DJ No ° Go to question 8.19
(] Yes
8.19 ts the proposed operational work for the following?
for the construction of a réferable dam as defined under the Water Supply (Safety oy ® No
land Reliability) Act 2008 8s
to increase the storage capacity of a referable dam by more than 10 per cent O Yes No
° \f yes to any of the above you must.complete Referable dam - IDAS form 16.
° This application requires assessment by the Department of Environment and Resource Management
(DERM). If DERM is not the assessment manager for the application, the role of the agency will be as a
concurrence agency and you must give DERM a copy of the application
Section reference:
* Sustainable Planning Regulation 2009, schedule 3, part 1, table 4, items 3 and 4
e Sustainable Planning Regulation 2009, schedule 5, part 1, table 4, items 3 and 4
e Sustainable Planning Regulation 2009, schedule 7, table 2, items 9, 10 and 11
° Water Act 2000, section 966A and 9668 (note: no current wild river declaration identifies taking or interfering
with subartesian water as assessable)
° Wild Rivers Act 2005, section 43A
°.
Wild Rivers Code (note: this code does not currently contain applicable provision for taking or interfering with
artesian water) .
Relevant wild river declarations
Operational works - IDAS checklist 4
Version 1.0 December 2009
Page 16
Ae OO Notes for completing this form:. ° Applicant details - IDAS form 1 and Development application assessment - DAS checklist 1 must be completed for ail development applications to be considered. ° The Sustainable Planning Act 2009 is administered by the Department of Infrastructure and Planning. Privacy - please refer to the assessment manager for further details on the use of information recorded in this form. Disclaimer: While the Department of Infrastructure and Planning (DIP) believes that the information contained on this form and provided as part of this process will be of assistance to you, itis provided on the basis that you will not rely on the information without first making your own enquiries regarding the interpretation and application of the applicable legistation to your circumstances. To the full extent permitted by law DIP expressly disclaims all liability (including but not limited to fiability for negligence) for errors or omissions of any kind or for any loss (including direct and indirect losses), damage or other consequence which may arise from your reliance on this process and the information contained on this form. Operational works - IDAS checklist 4 Version 1.0 December 2009
Used in these records
Part 1 of 2 - Part 1 of 2 - 177 Shorehaven Drive, NoosavilleRelated documentApplication case desk ↗
About this file
- File size
- 649 KB (small file)
- File type
No other editions are linked here.