Compiled Approved Plans OPW25/0042.02
Plans and drawings: the text below has words only, no drawings.
Very large file (38.9 MB): may take a few minutes to open.
Original PDF page 8, section 7. The text section number identifies this passage in the reader.
00w
D
REFER D09 & WQO1 FOR DETAILS 5. CONSTRUCTION TRAFFIC TO BE EXCLUDED FROM PIPEWORK - CCTV SURVEY L0
D08
3.21
6 m SETBACK W
x 45
TRENCHES UNTIL SUCH TIME AS PAVEMENT OVERLAY IS COMPLETE & L0 01
D7 (BUILDING WORKS) - MATERIAL TEST RESULTS 3.2
3
WRITTEN APPROVAL IS RECEIVED FROM THE SUPERINTENDANT
0h
16. ALL WORK IS TO BE COMPLETED IN ACCORDANCE WITH ALTA PROJECTS
LEGEND: D06 6. WHERE IT IS IMPRACTICAL TO EXCLUDE CONSTRUCTION TRAFFIC ALL STANDARD SPECIFICATION.
S
S
ATH EXISTING CONCRETE WHEEL LOADS MUST BE CONFINED TO 20mm STEEL BRIDGING PLATES 17.
D01
OWP
L03.
ROADWORKS AND DRAINAGE SET-OUT INFORMATION IS AVAILABLE FOR THE 23
FL FOOTPATH TO BE D02
L0
AND AS DETAILED
3.23
PROPOSED DESIGN CONTRACTOR VIA COMPUTER MODEL PROVIDED BY ALTA PROJECTS.
.50 ERL
D
RECONSTRUCTED
RL 5 m OV
D
D
SURFACE LEVEL 4 9 S
S S 7. BEDDING/HANCHING MATERIALS & BACKFILL TO BE COMPACTED IN HOWEVER, ALTA PROJECTS ACCEPTS NO RESPONSIBILITY FOR INCORRECT
S
1 S
S RM S S
LAYERS NOT EXCEEDING 150mm THICK USING VIBRATING PLATE OR SETOUT FROM THE DATA PROVIDED. CONTRACTOR SHOULD CONFIRM THE
FINISHED SURFACE CONTOUR S
S S
S S
S 14
SIMILAR COMPACTILE EFFORT. HYDRAULIC COMPACTION ALONE IS CORRECT COORDINATES WITH THE MANHOLE SETOUT DATA PROVIDED ON D03
LO x 15 S UNACCEPTABLE.
L03.
S
RM
22
THESE DRAWINGS.
S
NG 00w D04
L03.
RC x 1 22
EXISTING SURFACE CONTOUR BC 20 R
CU 0h x IC 1
8. BEDDING/HAUNCHING MATERIAL TO BE COMPACTED AT MOISTURE L0
D05
3.22
LV 24 SIEVE SIZE (mm) WEIGHT PASSING (%)
ER 00
TS
CONTENT 60% > OPTIMUM > 90% AS DETERMINED AS1289.5.7.1 (STD) D06
L03.
75.0 - 22
RCBC
9. S TRENCH COMPACTION TESTING TO BE CARRIED OUT AT THE
D
D
PROPOSED DRAINAGE NETWORK 19.0 100
S
FOLLOWING INTERVALS WITH ALL RESULTS SUBMITTED TO THE
2 9.50 -
1200w
A SUPERINTENDENT FOR APPROVAL:- 2.36 50 - 100
EXISTING Ø300 TO BE 10. SELECT PIPE BACKFILL: 0.60 20 - 90
DIRECTION OF MAJOR OVERLAND FLOW OUT TAKEN UP 0 5 10 15 20 25 11. - 1 TEST EACHSDRAINAGE LINE
x 450h
0.30 10 - 60
1 S
EX
SS
0.15 0 - 25
5
1
EX
EXISTING OUTLET TO BE 0.075 0 - 10
TAKEN UP SCALE 1:250 (A1), 1:500 (A3)
5
BEDDING MATERIAL GRADING LIMITS
D
1
D
S
NOTE: ONLY DRAWINGS MARKED "FOR CONSTRUCTION" AND BEARING AN ORIGINAL SIGNATURE SHALL BE USED FOR CONSTRUCTIONDesign:
PURPOSES.
PBL PROJECT: DRAWING TITLE:
Brah 101 pty ltd t/a Alta Projects
Drawn: PBL
A.B.N. 91 611 354 511 DRAINAGE LAYOUT - EARLY WORKS
APPROVAL Date: AUG 2022 26 Memorial Avenue, Cotton Tree PROPOSED HOTEL
NOT FOR CONSTRUCTION PO Box 559, Cotton Tree, QLD, 4558 Revision Sheet
D 28/01/2026 REVISED STORMWATER ALIGNMENT PBL SKH Checked:. . . . . . . . . . .
Tel (07) 5475 4125 Fax (07) 5479 1607 at 3-7 SERENITY CLOSE, NOOSA HEADS DRAWING No:
A6769-24-D01 D 1 of
C 13/11/2025 EARLY WORKS CONSTRUCTION ISSUE P.L. S.H. STEVEN HARRISON
Email: [email protected]
B
A
12/03/2025
27/02/2025
REVISED TO SUIT COUNCIL RFI - PATHWAY AND LEVELS ADDED
ISSUE FOR APPROVAL
PBL
PL
SKH
S.H.
.......................
DIRECTOR APPROVAL Datum AHD
Web: http://www.alta.net.au for CALILE MALOUF INVESTMENTS
REV DATE DESCRIPTION BY CHKD RPEQ - 4784 A1 SHEET SIZE FILENAME : a6769-24-D01 DRAINAGE CHANNEL LAYOUT.dwg - DATE : 28/1/26 - 5:03pm - XREF's: X-BASE; X-SURVEY; X-ARCH 3 ground; X-SURVEY retained trees; X-ARCH 1 basement; X-ARCH 2 lower ground; X-ARCH 4 level01; X-STRUCT; H-Approved-SH; H-Checked-SH Council Ref:
Document Set ID: 24527886
Version: 1, Version Date: 10/02/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Compiled Approved Plans OPW25/0042.02Related documentApplication case desk ↗
About this file
- File size
- 38.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.