1. THE CONTRACTOR SHALL IMPLEMENT THE SEDIMENT CONTROL MEASURES DETAILED.
.0
IDE
E LE TO ExRL1
TO F B
| |
G P TEN ING
W
| |
7
S EW16.9 .25 EXISTING STORMWATER ALL PERIMETER CONTROL MEASURES SHALL BE INSTALLED PRIOR TO DISTURBANCE
| |
D .0
20
0
O
LO
| |
PA 18 5 L
LA D 1 E N
| |
SHEET PILING TO
S
| |
TO BE TAKEN UP 17E
V S 18 OF THE SITE.
| |
C
TF . 0m V E
RL LE 5
| |
MANUFACTURERS SPEC
D
Y 19
OR
| |
2. THE CONTRACTOR IS TO ALLOW FOR STRIPPING AND STOCKPILING TOPSOIL FOR
| |
EW1188.0 17 D .5
IT
| | | |
EW18.2
PA 11
SE
M (NO OPE
ExRL2 0 | |
FUTURE USE. REFER SEDIMENT AND EROSION CONTROL NOTES FOR TREATMENT
6m K
| |
EN W 0.3 0 | |
HA M)
TB
RL
|
| | | | |
H 5
CH
| | | | | | | | | | | | | | |
ER
DETAILS.
| | | |
EW
AC
RD
| | S | |
S S
ST
3. FILL IS TO BE PLACED IN ACCORDANCE WITH THE REQUIREMENTS OF AS 3798-1996
| | | |
0
ExRL1
10
| | | | D
L
EW16.77.00
AN
| | TEMPORARY | |
"GUIDELINES ON EARTHWORKS FOR COMMERCIAL AND RESIDENTIAL DEVELOPMENTS"
7
D
| | | |
TEMP BATTER
0.
ExRL1
| | BATTER | |
- LEVEL ONE (1) SUPERVISION AND TESTING.
(TY
EW18.8
FALL
| |
9.9 TO SHEET
| |
00
0 | | S 1 in 2 MAX 16 | | 4. ALL WORK IS TO BE COMPLETED IN ACCORDANCE WITH ALTA PROJECTS STANDARD
P)
| |
W PILING L | |
S
VE 17
| |
| | | | D SPECIFICATION.
LE 5
| |
TEMP BATTER 20 17
| |
EW18.0
16
| |
0 NT D .5
| |
PA 11
| |
1 IN 2 MAX
| | E
EM
CH |
| | | | |
L
AS RL
| |
19 VE SHEET PILING NOTES:
| S
18
| | |
FB 15 | |
LE 5 16
|
| | | | |
12 | |
ExRL1
7
EW16.6 .00 INE
O | |
D .0 · ALL TEMPORARY AND PERMANENT SHEET PILING TO BE DESIGNED, DOCUMENTED
EL L PA 11
| |
ExRL1
ALL BATTERS TO BE LINED WITH
|
19 9.6 V 0. 4 | |
AND CERTIFIED BY THE SHEET PILING CONTRACTOR
EW18.9 LE EW18.8 | |
RL
| |
D .80
00 15 · ALL SHEET PILING, WHALERS, GROUND ANCHORS ETC. TO BE DESIGNED IN
BIDIM A14 GEOFABRIC. BATTER
S | |
PA 18
| |
| |
| |
14 ACORDANCE WITH THE RELEVANT AUSTRALIAN STANDARDS, LOCAL AUTHORITY
RL GRADIENTS TO BE CONFIRMED BY
| | | | | | | |
| |
ExRL1 | |
| | REQUIREMENTS & PROVISIONS OF THE WORKPLACE HEALTH AND SAFETY ACT.
7.1
TEMP BATTER EW16.5 5 GEOTECHNICAL
15 ENGINEER'S
14 ONSITE · DESIGN LOADS DUE TO RETAINED SOIL, GROUND- WATER, ADJACENT STRUCTURES &
16
| |
CH
ExRL1 8 | |
8.9 1 IN 2 MAX
S | | SERVICES, SURCHARGES, CONSTRUCTION TRAFFIC ETC. ARE TO BE DETERMINED BY
13
| |
17 THE SHEET PILING CONTRACTOR IN LIASON WITH THE GEOTECHNICAL CONSULTANT
1
|
| |
W
| |
40
| |
| |
| |
| |
| | 14 & STRUCTURAL ENGINEER.
| |
.0
· ALL EXISTING SERVICES TO BE LOCATED ON SITE BY THE SHEET PILING
18 13
| | | |
18 ExRL1
S| | | |
0
ExRL1 7 L | | SHEET PILING TO CONTRACTOR. ANY DAMAGE CAUSED TO EXISTING SERVICES BY SHEET PILING
EW16.5 .3 VE 12
| |
8.2 | See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Compiled Approved Plans OPW25/0042.02Related documentApplication case desk ↗
About this file
- File size
- 38.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.