Council archive · source document
Compiled Approved Plans OPW25/0042.02
Plans and drawings: the text below has words only, no drawings.
Very large file (38.9 MB): may take a few minutes to open.
Original PDF page 15, section 1. The text section number identifies this passage in the reader.
APPROVED PLAN OPW25/0042.02 NOOSA COUNCIL 16 FEBRUARY 2026 x 4 / 7 RIP2 7 41x 1800dia ROOF TO CA TO i CA TO 2400 DEEP 5 - RIP 4A WITH 6m2 RIP 2 z RIP 4B | = i {BIO BASIN L_| 622m : \\ “ty L ! g Ss 650rg. I 2 I 4 3 - 3 —Z s 1S 4 os 3 3 = $ I z ' B 3 = — 8 COs oe Se 2 2 + 7 ul | : SRIP 4B iS Ee edo do eno els { / AS H* 1x 1800di RIP 4A RIP 4 , S x ia - . UX 2400 DEEP x 1x 1800dia 1x 1800dia a \ Ap 2400 DEEP | ||| 31 2400 DEEP \ a | S ars oma 2 )) \ 5 Pho & Wwe ET y Y F : a pf] se 4 a . S a1 > 9] i\ j CY ; GC | Te pe) al sa fa. y - i NS = > \ APPROXIMATE LOCATION OF 2 PROTOTYPE RAPIC \INFILTRATION CULVERT TESTS ~ f (4TH DECEMBER 2024) \ ao — — _— RIC 1 —_— 14x 1500w x 1200h x 2400 _ LONG RCBC CULVERTS RIP 3A K 2x 1800dia 2400 DEEP RIP 3B 2x 1800dia RIP 6 1x 1800dia 2400 DEEP WITH 6m2 BIO BASIN I'7 RIP 5 1x 1800dia 2400 DEEP WITH 6m2 BIO BASIN 0 10 20 30 40 50 Meters SCALE 1:500 (A1), 1:1000 (A3) 8 | 2012026 | REVISED STORMWATER ALIGNMENT | 2710270925 | ISSUE FOR APPROVAL PBL sk ENGINEERING : DESIGN : MANAGEMENT = =ail: [email protected] Web: http:/Awww.alta.net.au NOTE: ONLY DRAWINGS MARKED "FOR CONSTRUCTION" AND BEARING AN ORIGINAL SIGNATURE SHALL BE USED FOR CONSTRUCTION PURPOSES. | Design: PBL Brah 101 pty Itd t/a Alta Projects PROJECT: RAPID INFILTRATION DEVICE SITE LAYOUT Dr : PBL oon Meese te antag PROPOSED HOTEL & CATOHMENT PLAN PO Box 559, Tree, QLD, 4 8 . eeu axl Fo Sarena wee o aero tor] at 3-7 SERENITY CLOSE, NOOSA HEADS DRAWNGN® _9g769-04-D08 ‘Baw for CALILE MALOUF INVESTMENTS © This plan is Copyright, Other than for the purposes of and subject to the conditions presoribed under the Copyright Act, no port of it may in any form ox by any means (electronic, mechanical, miexo copying, photo PL SH. DIRECTOR APPROVAL Datum _AHD copying, recording or otherwise) be reproduced, stored In a retrieval system or transmitted without the prior RPE: aitten permission of ALTA Projects, all intellectual property remains within ALTA Projects. all enquiries should REV | DATE DESCRIPTION By | CHKD Q- 4784 ‘1 SHEET SIZE FILENAME :26769-24-D08 RAPID INFILTRATION SITE LAYOUT.dug - DATE : 28/1/26 5:030m - XREF's: X-BASE, X-SURVEY, X-ARCH 3 ground; X-SURVEY retained trees; XBRCH 2 lower ground; X-ARCH 1 basement, X-ARCH 4 ovelDt; X-STRUCT; H-Approved-SH; H-Checkod.SH_ Council Ref: bo directed to ALTA Projects. Document Set ID: 24527884 Version: 1, Version Date: 10/02/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Compiled Approved Plans OPW25/0042.02Related documentApplication case desk ↗
About this file
- File size
- 38.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.