BIORETENTION BASIN NOTES: 150 150
· VEGETATION TO COMPLY WITH THE REQUIREMENTS OF APPENDIX "A" OF BIORETENTION BASIN '2, 4A, 4B, 5 & 6'
100
"HEALTHY WATERWAYS WATER SENSITIVE URBAN DESIGN" TO LOAMY BIO BASIN OVERFLOW LEVEL 'TYPE 1' GRATE. TOTAL AREA = 11m2
SOILS. REFER TO LANDSCAPE ARCHITECTS PLANS FOR DETAILS. REFER LONG SECTIONS REFER IPWEAQ D-0050
FILTER AREA = 6m2
· FAWB (FACILITY FOR ADVANCING WATER BIOFILTRATION) ACCREDITED VEGETATION TO COMPLY WITH THE
200
FILTER MEDIA LEVEL REQUIREMENTS OF APPENDIX A OF 'HEALTHY
CERTIFICATION FOR FILTRATION MEDIA TO BE FORWARDED TO THE
BATTER STABILIZED/PINNED
ENGINEER PRIOR TO PLACEMENT. WATERWAYS WATER SENSITIVE URBAN DESIGN'
WITH JUTE MATE OR
TO LOAMY SOILS. REFER LANDSCAPE
SIMILAR APPROVED
· SUBSOIL DRAINAGE PIPES TO BE UNSOCKED SLOTTED uPVC LAID AT 1:200 ARCHITECTS DETAILS
MINIMUM GRADE EXTENDED DETENTION LEVEL
300 MIN
0.2
· ALL RIGHT ANGLE SUBSOIL PIPE BENDS ARE TO BE CREATED USING 2x 45°
BENDS . SURFACE LEVEL
1
150
3 MAX SANDY LOAM. HYDRAULIC CONDUCTIVITY
· INSPECTION HOLD POINTS FOR BIORETENTION BASIN CONSTRUCTION ARE
0.5
AS FOLLOWS. NOTE : GRATE TO BE HOT DIP 200mm/hr IN ACCORDANCE WITH 'GUIDELINE
1. COMPLETION OF BULK EARTHWORKS. PIPE DIAMETER AS NOMINATED GALVANISED. WITH 10 SIDE PLATES SPECIFICATION FOR SOIL MEDIA IN
AND 50*6 BARS AT 50 CRS. TOP SOIL LAYER BIORETENTION SYSTEMS, FACILITY FOR
2. COMPLETION OF SUBSOIL DRAINAGE SYSTEM.
0.1
3. COMPLETION OF COARSE SAND TRANSITION LAYER.
SECTION ADVANCING WATER BIOFILTRATION.'
0.2
REFER DRAINAGE
4. COMPLETION OF SANDY LOAM FILTRATION MEDIA LAYER.
LONGSECTIONS
150 150 FOR PIT SIZES & COARSE SAND
· FLUSH OUT POINTS ARE TO BE FITTED WITH A FIXED INSPECTION OPENING 100 DIA SLOTTED uPVC PIPE LAID 2m CTRS AT
CLASS TRANSITION LAYER
50
CAP. SCREW ON CAPS ARE NOT ACCEPTABLE. 0.5% FALL. DISCHARGE TO STORMWATER
150
GEOFABRIC TO BE PROVIDED SYSTEM TANK. PROVIDE 100mm DIA CAPPED
· SANDY LOAM FILTRATION MEDIA LAYER IS TO BE PROTECTED BY A AROUND BIORETENTION MEDIA uPVC FLUSH OUT POINTS AT HEAD OF LINE
GEOFABRIC LAYER OR APPROVED EQUIVALENT FOR THE DURATION OF SCREW CAP AND CONCRETE SURROUND 5mm SCREENINGS
CONSTRUCTION. FLUSH OUT POINT. 45deg BEND. REFER IMPERMEABLE LAYER 'VISQUEEN OR APPROVED
· THE FOLLOWING QA IS TO BE PROVIDED BY THE CONTRACTOR
50
TO WSUD-003 FOR DETAILS SIMILAR' TO BE PROVIDED AROUND
- PHOTOGRAPHS OF GEOFABRIC LINING INSTALLED
BIORETENTION MEDIA
- PHOTOGRAPHS OF FIRST DRAINAGE LAYER INSTALLED
150
0.2
MIN
- PHOTOGRAPHS OF SUBSOIL DRAINS AND RISERS INSTALLED
- AS CON SURVEY OF SUBSOIL DRAINS AND RISERS INSTALLED (NOTE 3 BIORETENTION BASIN 2, 3A, 3B, 5 & 6
1
MINIMUM FALLS) GRATE TO BE HEAVY DUTY
- PHOTOGRAPHS OF FIRST DRAINAGE LAYER INSTALLED HOT DIP GALVANISED. SCALE 1 : 20 (A1)
- PHOTOGRAPHS OF FILTER LAYER INSTALLED IPWEAQ TYPE 1 100DIA SLOTTED
- FILTER MATERIAL TEST RESULTS (INCLUDING PERMEABILITY) uPVC PIPE.
PLAN
BIO BASIN TOTAL AREA (m2) FILTER AREA (m2) SURFACE LEVEL (RL)
BIO BASIN RAISED GRATED PIT DETAIL
SCALE 1:20
ALL LIDS/GRATES TO 1 135 100 10.45
BE BOLT DOWN TYPE 2 11 6 17.70
TYPICAL CLEANOUT POINT DETAIL 4A 11 6 19.30
SCALE 1 : 20 (A1) 4B 11 6 21.20
5 11 6 20.90
6 11 6 20.45
PROPOSED DRAINAGE LOW FLOW
PIPE. REFER DWG D10 FOR DETAILS
SANDY LOAM. HYDRAULIC CONDUCTIVITY
BATTER STABILIZED/PINNED 200mm/hr IN ACCORDANCE WITH 'GUIDELINE
WITH JUTE MATE OR SPECIFICATION FOR SOIL MEDIA IN
SIMILAR APPROVED BIORETENTION SYSTEMS, FACILITY FOR
BIORETENTION BASIN '1' ADVANCING WATER BIOFILTRATION.'
TOTAL AREA = 135m2 TOP OF WALL RL11.20
PROPOSED RAPID INFILTRATION
FILTER AREA = 100m2 CULVERT. REFER DWG D10 FOR
DETAILS
WEIR RL10.85
EXTENDED DETENTION LEVEL
PROPOSED ROCK GABION WALL
0.3
PROPOSED 300kL TANK SURFACE LEVEL RL10.45 1 HEIGHT VARIES
3 MAX 1.4m TO 2.70m
0.5
0.1
0.2
BIO BASE RL 9.65
COARSE SAND HEIGHT VARIES
TRANSITION LAYER TOP ROCK RL9.15 RL8.5 TO RL11.20
GEOFABRIC TO BE PROVIDED
AROUND BIORETENTION MEDIA BASE ROCK RL8.95
5mm SCREENINGS
-
PROPOSED DRAINAGE HIGH BIORETENTION BASIN 1
APPROVED PLAN
100 DIA SLOTTED uPVC PIPE LAID 2m CTRS AT IMPERMEABLE LAYER 'VISQUEEN OR
0.5% FALL. DISCHARGE TO STORMWATER APPROVED SIMILAR' TO BE PROVIDED
FLOW PIPE. REFER DWG D10 OPW25/0042
FOR DETAILS SCALE 1 : 20 (A1)
SYSTEM TANK. PROVIDE 100mm DIA CAPPED AROUND BIORETENTION MEDIA NOOSA COUNCIL
uPVC FLUSH OUT POINTS AT HEAD OF LINE
23 SEP 2025
NOTE: ONLY DRAWINGS MARKED "FOR CONSTRUCTION" AND BEARING AN ORIGINAL SIGNATURE SHALL BE USED FOR CONSTRUCTION Design:
PURPOSES.
PBL PROJECT: DRAWING TITLE:
Brah 101 pty ltd t/a Alta Projects
Drawn: PBL
A.B.N. 91 611 354 511 WATER QUALITY DETAILS
FOR APPROVAL Date: AUG 2022 26 Memorial Avenue, Cotton Tree PROPOSED HOTEL
NOT FOR CONSTRUCTION PO Box 559, Cotton Tree, QLD, 4558 Revision Sheet
Checked:. . . . . . . . . . .
Tel (07) 5475 4125 Fax (07) 5479 1607 at 3-7 SERENITY CLOSE, NOOSA HEADS DRAWING No:
A6769-24-WQ02 A 2 of
STEVEN HARRISON
Email: [email protected]
A 27/02/2025 ISSUE FOR APPROVAL PL S.H.
.......................
DIRECTOR APPROVAL Datum AHD
Web: http://www.alta.net.au for CALILE MALOUF INVESTMENTS
REV DATE DESCRIPTION BY CHKD RPEQ - 4784 A1 SHEET SIZE FILENAME : a6769-24-WQ02 WATER QUALITY DETAILS.dwg - DATE : 28/2/25 - 11:52am - XREF's: H-Approved-SH; H-Checked-SH Council Ref:
Document Set ID: 24143616
23646597
Version: 1, Version Date: 24/09/2025
21/03/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Compiled Approved Plans OPW25/0042.02Related documentApplication case desk ↗
About this file
- File size
- 38.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.