Council archive · source document
Compiled Approved Plans OPW25/0042.02
Plans and drawings: the text below has words only, no drawings.
Very large file (38.9 MB): may take a few minutes to open.
Original PDF page 23, section 1. The text section number identifies this passage in the reader.
8.1 QUALITY MUSIC MODEL………………………………………...…………………………..15
8.2 QUALITY MUSIC MODEL RESULTS……………………………………………………….18
- Contents -
9.0 SYSTEM MAINTENANCE………………………………….…………………………………18
10.0 EXTERNAL CATCHMENTS DRAINAGE ROUTE……………………………………….19
10.1 PIPED FLOWS (< 10 YEAR ARI)……………………………………………………………..19
10.2 MAJOR EVENT OVERLAND FLOWS (>10 YEAR ARI)…………………………………20
APPENDICES
APPENDIX A – Engineering Drawings
APPENDIX B – Engeny Flood Analysis Report
APPENDIX C – Architectural Drawings
APPENDIX D – Prototype RIP/RIC Test Results
APPENDIX E – Detail Survey
APPENDIX F –Stormwater Management Device Maintenance Plan
APPENDIX G – Excel Spreadsheet Water Balance Model (Electronic Only)
APPENDIX H – Excel Spreadsheet RIP/RIC Models (Electronic Only)
APPENDIX J – Quantity MUSIC Model & Quality MUSIC Model (Electronic Only)
APPENDIX K – Prototype Test Videos (4 December 2024)
Document Set ID: 24143616
23646596
Version: 1, Version Date: 24/09/2025
21/03/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Compiled Approved Plans OPW25/0042.02Related documentApplication case desk ↗
About this file
- File size
- 38.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.