Council archive · source document
Compiled Approved Plans OPW25/0042.02
Plans and drawings: the text below has words only, no drawings.
Very large file (38.9 MB): may take a few minutes to open.
Original PDF page 63, section 1. The text section number identifies this passage in the reader.
TABLE 1.0
RESULTS OF PROTOTYPE INFILTRATION PIT (IP)
TESTING 23 JULY 2001
HEAD (M)
0 10 20 30 40 50
INFILTRATION RATE (mm/SEC)
i"
fe
a
i"
0
"
0
0
i
p
i
1
"
y
1
ORAWNG STATUS Design: CDF, TAI PROTSONL LDR PY LD PROVECT: DRAWING TITLE:
7 a TAL = rere, [SETTLERS COVE ~ HIGH DENSITY RESIDENTIAL INFILTRATION PIT TESTING RESULTS
I Datum: AMD, ean police: slats 248) 4 at SERENITY CLOSE, NOOSA HEADS ORAVONG No: CIGSG/OB/MCU/IP2 Revision:
Ri ONAL ENGIN!
= fear tear = ior SETTLERS COVE DEVELOPMENT PTY LTD ———— —_
SATO ET
Opcument Set ID: 28648696
Version: 1, Version Date: 24/09/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Compiled Approved Plans OPW25/0042.02Related documentApplication case desk ↗
About this file
- File size
- 38.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.