Skip to the record
Search everything, all in one place.

Council archive · source document

Compiled Approved Plans OPW25/0042.02

of 92

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (38.9 MB): may take a few minutes to open.

Log in to see the plans as drawn

Original PDF page 68, section 1. The text section number identifies this passage in the reader.

                  ELEMENT:             MAINTENANCE OF RAPID INFILTRATION PITS (RIPs)/RAPID INFILTRATION
                                       CULVERT (RIC) & SUROUNDING BIORETENTION

                  4.         Performance Indicators No accumulated silt and debris in bioretention
                                                    basins or base of RIPs/RIC.
                                                    Bioretention basin vegetation healthy and
                                                    vigorous.
                                                    No ponding of water within bioretention basin or
                                                    RIPs/RIC.
                  5.         Frequency/Deadline     3-Monthly inspections.
                  6.         Responsible    Person Hotel Management to ensure maintenance
                             /Organisation          schedule adhered to.

                  7.         Reporting and Review         Maintenance Contractor to make entries in
                                                          environmental diary noting date of service for
                                                          each Bioretention and RIP, condition of
                                                          Bioretention and RIP/RIC, material removed and
                                                          means of disposal.

                                                          Random inspection by Council/EPA officers.

                  8.         Corrective Action            Review maintenance schedule as appropriate.




Document Set ID: 24143616
                  23646596
Version: 1, Version Date: 24/09/2025
                          21/03/2025

Used in these records

About this file

File size
38.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Compiled Approved Plans OPW25_0042.02.pdf · 38.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.