210316_RFI response

of 2

Page text shows just the words. Original shows the document exactly as it was published.

                                                                                                           103 Wrigley St (Cnr Sugar Road)
                                                                                                           P O Box 5774
                                                                                                           Maroochydore BC Q 4558
                                                                                                           Phone: 617 5479 5311
                                                                                                           Fax: 617 5479 1289
                                                                                                           Email: [email protected]
                                                                                                           Part of CadCon International Pty Ltd
                                                                                                           ACN 098 201 828




                                                                                                       16th March 2021
              Our Ref:            208516
              NSC Ref:            RAL21/0003

              Noosa Council
              By email to [email protected]
              Attn: Blake Coulston

                    Information request response for 108 Black Mountain Range Rd, Black
                                                  Mountain.

              Dear Blake,

              The information below and attachments hereto comprise a partially complete
              response to Council’s information request of 12th February, 2021 i.e. all items
              have been satisfied but we are still waiting on an updated geotechnical and
              effluent disposal report to match the amended Proposal Plans (see 6c below).

              1. Provide a plan that indicates the extent of the Landslide Hazard overlay
                 mapping from the Noosa Plan 2020 and the proposed building envelope.
                    a. See attached CadCon sketch “208516-04-210312-Lanslide Hazard
                       Mapping”.
              2. Provide a plan that indicates surveyed natural surface levels of the building
                 envelope on proposed Lot 2.
                    a. See attached CadCon sketch “208516-04-210312-Spot Levels.pdf”.
              3. Provide a plan that indicates the slopes of the building envelope on
                 proposed Lot 2 based on the surveyed natural surface levels.
                    a. See attached CadCon sketch “208516-04-210312-Spot Levels.pdf”.
              4. Provide additional detail on the preferred location for effluent disposal,
                 stormwater tanks and the proposed outlet scour protection.
                    a. See attached CadCon plan “208516-04-02.pdf”
              5. Amend the proposed building envelope to facilitate the prescribed
                 boundary setbacks.
                    a. See attached CadCon plans “208516-04-01-Rev A.pdf” and
                       “208516-04-02.pdf”.
              6. Amend the proposed plan illustrating a more regular and rectangular
                 shape for the new lots.
                    a. See attached CadCon plans “208516-04-01-Rev A.pdf” and
                       “208516-04-02.pdf”. The lot boundaries have been amended such
                       that they are now as “regular” as practically possible taking into
                       account the shape of the existing lot; site topography; vegetation;
                       existing infrastructure; and access requirements. A practical, viable
                       building area for Lot 2 is provided.


CadCon provides boundary, contour & detail and construction surveys, town planning applications, liaison & negotiation with Councils &
Government, coordination and liaison with architects, engineers etc, coordination and management of development projects from start to finish.
Log in to download the original file

210316_RFI response.pdf · 186 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.