DNA 157 - Change a Development Approval [As Published] · 51989.112.03
5. Existing trees- on the site and within road reserves are to be retained, except where required to be removed due to building operations or the conduct of the approved use. Land Development Roof Water & Stormwater Drainage 6. Roof runoff from the new roofed areas and any new surface runoff shall be directed to the existing stormwater disposal system for the site. Sewer Mains 7. To ensure Council's sewer main is accessible for maintenance purposes and is protected from risk of damage no structures requiring a building permit (eg. buildings, roof overhangs,#raised terraces, etc) shall be constructed within this ‘zone of influence’ or within 4.5m of the centreline of the sewer main, whichever is the greater. In this regard the existing sewer main that traverses the site at the rear and the ‘zone of influence’ (taken as the area within a 45-degree angle measured from the invert of the sewer main to the finished surface level) shall be accurately located, determined and marked on site by a licensed Surveyor. Erosion and Sediment Control 8. Any person acting on this permit shail prevent erosion and sediment export from leaving the site. Site control measures such as silt fencing, controlled gravel access to the site and controlled disposal of waste, will be necessary. Contributions Towards Council Infrastructure 9. Monetary contributions shall be paid to Noosa Council towards the cost of providing and/or upgrading various infrastructure at the rates applicable at the time of payment. An estimate only of the contribution amounts under the current Council policies and requirements is outlined in the table below: Contribution Required For: Amount: PSP12 — Public Open Space Contributions (Park) $340 PSP16 — Sewerage Headworks Contributions — , $664 PSP17 — Water Supply Headworks Contributions | $769 PSP20 — Pathway Trunk Network Contributions $343 TOTAL Contribution Amount = | $ 2,116 Please note, that these amounts are all subject to variations in the Consumer Price Index, All Groups Brisbane from June 2007 until the date of payment. All contributions must be paid prior to the commencement of the use. Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the contributions not be paid at the due time, Council shall call upon the trading bank guarantee in full. Processing of bonds for security where specific Council approval has been given for the bonding of contributions will incur an administration fee in accordance with Council’s Land Development Commercial & Regulatory Fees at the time of lodgement. In the event that the Development Permit for Material Change of Use of Premises 1apses-or'is“cancelled+the-trading-bank guarantee-will-be retuned Award Winner - Australian Clean Beach Challenge 2004 Litter Prevention
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
DNA 157 - Change a Development Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.9 MB (small file)
- File type
No other editions are linked here.