Council archive · source document
DNA 157 - Change a Development Approval [As Published] · 51989.112.03
e The removal of the access doors at the rear of the site as vehicle access to this storage area for parking is now not required; ¢ The provision of 6 carparking spaces to the frontage of the site in accordance with additional condition 1 of the approval granted 2 August 2007; and e A roof overhang at the rear of the building facing the northern boundary of the site to allow for increased weather protection from the sun and rain. It is considered that the changes are generally in accordance with the approved plans. No assessable development arises from the changes made to the development approval. Additional Condition 7 Condition 7 of the approval states: To ensure Council's sewer main is accessible for maintenance purposes and is protected from risk of damage no structures requiring a building permit (eg. buildings, roof overhangs, raised terraces, etc) shall be constructed within the zone of influence or within 1.5m of the centre line of the sewer main, whichever is the greater. In this regard the existing sewer main that traverses the site at the rear and the ‘zone of influence’ (taken as the area within a 45-degree angle measured from the invert of the sewer main to the finished surface level) shall be accurately located, determined and marked on site by a licensed Surveyor. It is requested that the condition be amended to allow for the 1.5m roof overhang at the rear of the building for the following reasons: « The roof overhang is currently 6m above the existing ground level and in no way inhibits access to the sewer should access be required (refer to the photographs provided as Attachment 4); « The main facade of the building near the northern boundary is generally clear of the zone of influence and is not less than 1.5m from the centre line of the sewer in accordance with the approved plans; «The sewer at the eastern end of the property is approximately 1.5m deep. At the western end of the property near Lot 1 the sewer is approximately 3m deep. Therefore, given that the roof overhang only relates to the building on Lot 1, the length of sewer affected by the overhang would have a maximum depth of approximately 2.0m at the western end of Lot 3. Consequently, even if the sewer is to be excavated for maintenance purposes, a large machine is not required for this work and the roof overhang would not inhibit access in any way; * It is desirable from a weather perspective to retain the roof overhang as existing. The industrial shed is primarily constructed of colorbond and this wall faces north. Consequently the roof overhang reduces the impact of sunlight on the wall which significantly reduces the heat inside the building. It is not intended to provide air-conditioning in the workshop, but this may be required to reduce the heat should the roof overhang have to be removed. Further, during periods of heavy rain the overhang provides additional protection against water inundation. The additional water caught by the roof overhang is directed to the on-site stormwater drainage system; * No easement exits over the sewer main and therefore nothing prevents the council from allowing the overhang given that it has no impact with respect to gaining access to the sewer; and e If required, the owner is prepared to sign an indemnity against any costs incurred by the council as a result of the roof overhang being retained.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
DNA 157 - Change a Development Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.9 MB (small file)
- File type
No other editions are linked here.