1 Shrub / groundcover species as per planting plan

2 100 mm composted forest mulch as specified avoiding contact
with tree stem

3 Min 300mm depth imported topsoil as specified.

4 Planting hole two times wider than plant pot size. Use friable
imported topsoil light compaction only.

5 Slow release fertilizer as per Manufacturer's recommendations
Choose appropriate fertilser for species selection

6 — Sub-grade,

 

TYPICAL 140mm - 200mm PLANTING

NTS

 

ADVANCED TREE PLANTING - GARDEN BEDS

   
 

 

   

 

 

SPECIFICATION NOTES
SOIL AND MULCH

EXCAVATION AND DRAINAGE

Break up and remove any debris from construction works to achieve
required planting depths. Excavate to bring the subsoil to a minimum
of 300 mm below finished design levels. Shape the subsoil to fall
to subsoil drains where applicable, Break up the subsoil to a
further depth of 150 mm. Sub-surface drainage as per the attached
3 details is to be incorporated to all planting areas that are enclosed
. by hard edging, are located on controlled compacted fill and or not
otherwise drained. Install imported or ameliorated topsoil over
subsoil as per spec. Imported and site soil is to be mixed insitu

300

 

1 100mm mulch as specified Ensure all earthworks are contoured to drain effectively
2 Imported / ameliorated topsoil laid to minimum

300mm depth to specification. Fertiliser to be SOIL TEST

applied to Manufacturer's recommendations to

top layer of topsoil prior to turf being Laid Obtain bulked sample soil test from NATA registered laboratory on
3 _De-compacted subsoil to 150mm depth site topsoil to be used on job. Obtain seperate tests for various
4 Ensure all garden bed areas and tree pits are soils used in works.

free draining Test for pH, organic matter, Ca / Mg Ratio, Nitrate-N, Ammonium-N,

P, Ca, Mg, K, So, S, Al, Si, B, Fe, Ma, Cu, Z, Mo, Co, Se and

TYPICAL GARDEN BED PROFILE ameliorate to appropriate levels for proposed planting in accordance
——eeeerrroerooanmmnedlil'eernw” with recommendations of suitably qualified agronomist or soil
NTS scientist.

Provide soil amelioration certificate from qualified agronomist
Provide AS4419 compliance certificate for all imported soil
Geotechnical information including bore logs showing depth of fill,
OCP’s & allowable bearing capabilities for footing designs as
required.

TOPSOIL - SUPPLY AND PLACEMENT

Turf areas are to be filled with fit for purpose imported topsoil to
a minimum of 100 mm depth over cultivated sub-grade.

Planting areas are to be filled with fit for purpose imported topsoil

to a minimum of 300mm depth over cultivated sub-grade

. 25 ltr tree pits are to be are to be filled with fit for purpose
imported topsoil to a minimum of 0.5m? volume.

* 100Itr trees are to have no less than 4m? soil volume to
support healthy establishment and growth,

© Supplier of imported soils, as well as intended mix is to be
nominated prior to start of works and approved by
Superintendent.

* Where structural cell systems are to be used refer to
Manufacturer's specifications and details for recommended soil
volumes.

© Add and mix composted material to topsoil when spreading to
help inoculate soil

. A slow release fertiliser such as ‘Osmocote’ or equivalent is to
be incorporated with individual planting in accordance with the
Manufacturer's recommendations.

© — Soil is to be mounded to facilitate good drainage (max 1:3

    

7 Ved WN grade)
at oN * To improve the water holding capacity of the dry and well
SAN v\ drained soils on site, addition of a moisture holding product

 

such as ‘Hydrocell’ or 'Rainsaver’ is recommended following
manufacturers guidelines.

Finish topsoil flush with abutting kerbs, mowing strips, and paved
surfaces unless otherwise shown. Feather edges into adjoining
undisturbed ground,

1 AS2303:2018- Tree Stock for Landscape Use compliant tree
stock with Arborist certification - refer to specification
notes. Species and pot size as per schedule. Stem taper
finished flush with finished soil level, allow for settlement.

2 100mm depth organic mulch as specified, avoiding contact with
tree stem.

3 Excavated planting hole 2x width of rootball with sloping
sides, backfilled with topsoil as specified
Soil gently mounded to top of root plate.

4 Rootball

5 Lightly compacted soil under root package to prevent tree
from slumping

6 50x50x2400mm Hardwood stakes driven into ground avoiding
rootball. Tree ties to be hessian tie.

7 Min. 300mm imported topsoil as specified to garden areas.
8 Cultivated / ripped subgrade.
9 Ensure all garden bed areas and tree pits are free draining

Width of garden as per plans

All timber products to have Forest
Stewardship Council® (FSC®)

ORGANIC MULCH

Ensure mulch is produced by chipper, aged, comprised of leaf and limb
material of varying sizes, free of foreign matter including rock,
soil/sediment contamination and is applied to all planting areas as per
requirements. Reke to an even surface flush with the surrounding
finished levels. Avoid placement against green plant stems and keep
below tree trunk flares. Mulch to finish level with adjoining edging

Mulch to comply with requirements set out in AS4454:2012- Composts,
Soil Conditioners and Mulches.

Mulch to be free of damaging material and preferably aged for a
minimum of two (2) months after chipping, before being spread on site
Forest blend mulch is the preferred mulch for all areas

Tip mulch is not appropriate for the following reasons

© may not be of uniform size and quality.

o it may contain material from diseased vegetation, which may
spread potentially fatal diseases (e.g, Phellinus), fungus or
pathogens, (e.g. Phytophtora).

© mulch that is not properly composted may introduce weed seeds.

© can often be hydrophobic, causing drought stress in plants.

© possible growth inhibiting properties due to phytotoxic chemicals
e.g, polyphenols

© poorly composted mulch may cause nitrogen draw down, locking
up nutrients needed for plant growth

© may contain metals and other rubbish which may cause a health
risk to workers.

Mulch to be spread before planting to prevent erosion, loss of soil
moisture and weed seed germination.

Mulch is to be installed as per landscape drawing, to a depth of 100mm
unless otherwise specified

Mulch depth is not to exceed 150mm. Deep mulching - particularly with
mulch containing fines - can restrict air flow causing anaerobic
decomposition to take place. A possible side effect of this is alcohol
production which has the potential to damage plant cell walls and roots.
Anaerobic compost may not have a high enough temperatures to
effectively destroy pathogens.

Rake mulch to an even surface level with surrounding finish

Spread mulch so it is smooth and evenly graded between design surface
levels, sloped towards the base of the plant stems

Mulches are not to be in contact with plant stems. Ensure mulch is no
closer to the stem than:

© 50mm for shrubs
0 100mm for trees.

Form a small bermed dish around plant stems to facilitate flow of water
and nutrients to rootball

Preferably, the area beneath tree canopy (dripline) is to be blanket
mulched

Surrounds of plants planted in riplines (plough lines “ripped” into soil to
decompact and loosen soil) and grass areas, provide mulch to 750mm
diameter with trunk at centre.

SEDIMENT AND EROSION

The Contractor shall ensure that measures are undertaken to minimize
erosion of exposed surfaces during the life of the project. Any localized
overland flow causing scour through the site is to be rectified by the
Contractor with appropriate methods determined in consultation with the
Superintendent. The Contractor shall inspect the site after each
significant rain event for erosion.

INORGANIC MULCH

Gravel Mulch Type 1 to be Nom.45mm¢ washed Mary River rounds
installed to a depth of 100mm laid on pinned weed suppressant
geotextile matting

TURF - SUPPLY AND LAY

Turf installed to road verge must be “A” grade Couch with minimum
sod depth of 25 mm, All turf must be installed within 24 hours of
being cut. Runs must butt hard against each other and seams top
dressed with topsoil. Turf to be rolled to provide an even surface
free from depressions and bumps. Any depressions / damage within
turf areas are to be replaced or top dressed with clean river sand
as directed by Superintendent.

CONTAINERISED PLANT MATERIAL

AS2303:18 / NATSPEC.
Tree stock sized 300mm and over is to be compliant with
AS2303:2018- Tree Stock for Landscape Use, and is to be certified
as compliant by an independent level 5 Arborist, Arborist inspection
tags are to be attached fo fhe tree before delivery to site and
remain attached until the stock has been accepted by Council as
Off Maintenance

Superintendent to approve plant material prior to planting
Planting is to be carried out in a manner consistent with good
horticultural practice. Plants are to be planted at correct depth
allowing for ‘settling’. Soil greater than 10mm in depth is not to be
placed over the rootball or against the stem. All 300mm pot and
larger plant material is to be guyed and staked as per advanced
Tree Planting Detail unless otherwise approved by the
Superintendent. Smaller plant stock is to be staked as necessary.
Stakes shall not pass through the rootball of plant at time of
planting or any time thereafter. Nursery stakes are to be removed
within 3 months of planting

Stock may be rejected if plants are

a) undersized proportional to specified container size or if
the root system is underdeveloped

b) oversized proportional to specified container size or
severely root bound

c) unbalanced or uncharacteristic of normal or specified
growth pattern for the species

d) not suitably acclimatised for the specific environment

e) diseased, infested with pests or suffering from other
form of significant stress

f) tree stock is not compliant with AS2303:2018-Tree Stock

for Landscape Use, and is not certified as compliant by
level 5 Arborist

MATERIALS - SUPPLY AND INSTALL

GRAVEL MULCH
Install gravel mulch to Nom.depth of 100mm. Suggested minimum
diameter to be no less than 20mm. Preference is to be given to
the use of recycled concrete product installed as inorganic mulch
where practicable, specifically in areas of lesser visibility. If
recycled concrete product is selected for areas of higher visibility,
such as path edges or in planting areas, ensure the recycled
concrete is of the highest grade possible and free from materials
such as steel and plastic. In general, any recycled concrete product
is to be free of all deleterious materials and rubbish, both
inorganic and organic. Ensure even fall across surface is achieved
to prevent ponding

PAVER TYPE 1

Type: 400x400x50mm concrete paver
Suggested Manufacturer/Type: ‘Quadro 50° by Adbri Masonry
Tel. 1300 365 565

Suggested finish/colour: Charcoal

Refer to detail for installation details

Check all dimensions before commencement of work.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SCALE 1:10 Chain of Custody certification TT IS THE RESPONSIBILITY OF THE CONTRACTOR Check Site boundary dimensions from the Title plans
TO CONTACT THE RELEVANT AUTHORITIES TO Check Building Boundary clearances by set out
CONFIRM THE LOCATION OF ALL EXISTING SERVICES |] Notwithstancing the information supplied on this drovng,
PRIOR TO THE COMMENCEMENT OF EXCAVATION the location, depth and extent of underground or overhead
services are to be confirmed and protected on site by the
contractor prior to commencement of works.
‘Approved 5 i
Checked = 10 2 Consulting Civil & Drawing title - Project - PROPOSED INDUSTRIAL Site - Project 192297 Sheet No. L200
Design - JC Drawn - JC a Structural Engineers | KEVIN COVEY aéng,ceEng.Mevust.usPePNc.rPeo-1823 | Landscape Details & COMPLEX 11 LEO ALLEY ROAD Digital Ref : 1200 Landscape Detcis Issue: C
_ AS NOTED - © [5-11-20 | DESIGN AVENOWENTS — FOR APPROVAL [WC CcCOoOVveS CHRIS. CAMP BEng(Hons),MIEAust,RPEQ—4944 vee = - __ -
Scales Date - DEC 2019 fs 75-05-20) DESIGN ANENDWENTS FOR APPROVAL [UC Project Management} 124 puPORTH AVENUE Ph (07) 5443 7777 Specification Client - DEVCON CAPITAL 9 PTY NOOSAVILLE This Document is copyright and shall not be copied
7A I9=12=16| FOR APPROVAL uc] ASSOCIATESPTYLTD 4 pignnin PO BOX 16 Fax (07) 5443 7577 without written approval, nor shall it be used except
Document Stage — OPW — ABN 59.157 305 992 9g MAROOCHYDORE QLD 4558 LTD for the Development and the Site Specified.
Issue Date Description By E-MAIL: [email protected]

 

 

 

 

 

 

 

e:\12dS\data\1

 

ERVER\192297_280\DWG

Covey \Landscape\OPW\L200 Landscape Details.dwg
Log in to download the original file

Attachment 4 - Landscape OPW Plans.pdf · 1.7 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.