Decision Notice - 010.2009.00001490.001 [As Published] · 132009.1490

of 7

Text shows just the words. Original shows the document exactly as it was published.

                                                                                      2009/1490



Security Bond and Contributions
0.      Monetary contributions shall be paid to Council towards the cost of providing and/or
        upgrading various infrastructure at the rates applicable at the time of payment. An estimate
        only of the contribution amounts under the current Council policies and requirements is
        outlined in the table below:
          Contribution Required For:                                               Amount:
          PSP20 – Pathway Trunk Network Contributions                              $727
          TOTAL Contribution Amount =                                              $727
          Please note that these amounts are all subject to variations in the Consumer Price Index,
          All Groups Brisbane from September 2009 until the date of payment.

        All contributions must be paid prior to commencement of the use.
0.      Security in the form of a cash bond or trading bank guarantee to the sum of $1,500 must be
        submitted, to secure performance of all conditions of this approval, prior to the issue of a
        Development Permit for building works. The cash bond or trading bank guarantee will be
        returned on performance of the conditions of approval less any costs incurred by Council in
        respect of enforcing performance of this permit.
General
0.      The portion of pergola within the front setback shall be removed.
0.      The development must be undertaken and operated in a manner that causes no detrimental
        effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
        lighting nuisance or other emissions.
Earthworks and Sediment Control
0.      Earthworks required on site shall be carried out in accordance with Council’s Planning
        Scheme Policy PSP5 Engineering Design Standards, so as not to cause the additional
        ponding of water on any adjoining lands or concentrate or direct overland flow on to an
        adjoining property.
0.      Sediment and erosion control measures must be in place prior to building works. If such
        measures are not in place or are not satisfactory, ‘on the spot’ fines may be issued. Such
        fines can be issued if sediments from the site are found to enter or have the potential to
        enter Council’s stormwater system or natural waterways.
0     REFERRAL AGENCY CONDITIONS

The referral agencies applicable to this application are:

 Referral Trigger            Referral Status     Referral Agency       Referral Address

 Not applicable

0     APPROVED PLANS/DOCUMENTS
The approved plans and / or documents for this development approval are listed in the following
table:




                                                                                     Page 3 of 7

Used in these records

About this file

File size
57 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - 010.2009.00001490.001 [As Published].pdf · 57 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.