Decision Notice - Change to an Existing Approval - 010.2008.00000256.002 [As Published] · 142008.256.02

of 11

Text shows just the words. Original shows the document exactly as it was published.

                                               Officer:            Conor Neville
                                               Direct Telephone:   (07) 5449 5108
                                               Response Address:   PO Box 141, Tewantin QLD 4565
                                               Email:              [email protected]
                                               Our Reference:      2008/256
                                               Your Reference:
11 December 2008

Viridian Noosa Pty Ltd
PO Box 2360
NOOSA HEADS QLD 4567



Dear Sir

                          Change to an Existing Approval
                                   Integrated Planning Act 1997

I refer to your request to make a change to an existing approval. On 10 December 2008 Council
decided your requested changes.
Details of the decision with the consolidated conditions are as follows:
1        APPLICATION DETAILS

    Application No:               2008/256
    Street address:               5 Morwong Drive, Noosa Heads
    Real property description:    Lot 888 SP 186498, Lot 1 SP 209133 & Lot 889 SP 203086
    Planning Scheme:              The Noosa Plan

2        DECISION DETAILS

Council on 24 June 2008 decided to issue the following type of approval:-
     Development Permit for Operational Works - Landscaping
In relation to representations, Council on 22 July 2008 decided to:
A.       Agree to change Condition 4
B.       Issue a Negotiated Decision Notice
In relation to the request to make a change to the existing approval, Council on 10 December 2008
decided to:
A.       Approve a change to Condition 1
B.       Include seven additional conditions
C.       Issue a Change to an Existing Approval

3        RELEVANT PERIOD OF APPROVAL
The relevant period for this Development Approval is identified in the Assessment Manager
conditions.



                                                                                            Page 1 of 11
Full text of the other 10 pages

Page 2

                                                                                  2008/256


4    ASSESSMENT MANAGER CONDITIONS

1.   Development undertaken in accordance with this approval must generally comply with the
     approved plans of development. The approved plans are listed in the following table and may
     be amended by these conditions: -

     Plan     /     Rev.       Plan / Document Name                             Date
     Document
     No.

     L-LE-002       OP1        Legend - EDAW                                    12 Feb 2008

     L-LE-003       OP1        Planting Schedule – EDAW                         12 Feb 2008

     L-TR-101       OP1        Tree Retention Plan – EDAW                       12 Feb 2008

     L-TR-102       OP1        Tree Retention Plan – EDAW                       12 Feb 2008

     L-TR-103       OP1        Tree Retention Plan – EDAW                       12 Feb 2008

     L-SF-201       OP1        Surface Finishes - EDAW                          12 Feb 2008

     L-SF-202       OP1        Surface Finishes – EDAW                          12 Feb 2008

     L-SF-203       OP1        Surface Finishes – EDAW                          12 Feb 2008

     L-SF-204       OP1        Surface Finishes – EDAW                          12 Feb 2008

     L-SF-205       OP1        Surface Finishes – EDAW                          12 Feb 2008

     L-SF-206       OP1        Surface Finishes – EDAW                          12 Feb 2008

     L-SF-207       OP1        Surface Finishes – EDAW                          12 Feb 2008

     L-SF-208       OP1        Surface Finishes – EDAW                          12 Feb 2008

     L-SF-209       OP1        Surface Finishes – EDAW                          12 Feb 2008

     L-SF-210       OP1        Surface Finishes – EDAW                          12 Feb 2008

     L-SF-211       OP1        Surface Finishes – EDAW                          12 Feb 2008

     L-SF-212       OP1        Surface Finishes – EDAW                          12 Feb 2008

     L-SF-213       OP1        Surface Finishes – EDAW                          12 Feb 2008

     L-SF-214       OP1        Surface Finishes – EDAW                          12 Feb 2008

     L-SF-215       OP1        Surface Finishes – EDAW                          12 Feb 2008

     L-SF-216       OP1        Surface Finishes – EDAW                          12 Feb 2008

     L-SF-217       OP1        Surface Finishes – EDAW                          12 Feb 2008

                                                                               Page 2 of 11

Page 3

                                                                   2008/256


L-SF-218    OP1   Surface Finishes – EDAW                       12 Feb 2008

L-PP-401    OP1   Planting Plan – EDAW                          12 Feb 2008

L-PP-402    OP1   Planting Plan - EDAW                          12 Feb 2008

L-PP-403    OP1   Planting Plan – EDAW                          12 Feb 2008

L-PP-404    OP1   Planting Plan – EDAW                          12 Feb 2008

L-PP-405    OP1   Planting Plan – EDAW                          12 Feb 2008

L-PP-406    OP1   Planting Plan – EDAW                          12 Feb 2008

L-PP-407    OP1   Planting Plan – EDAW                          12 Feb 2008

L-PP-408    OP1   Planting Plan – EDAW                          12 Feb 2008

L-PP-409    OP1   Planting Plan – EDAW                          12 Feb 2008

L-PP-410    OP1   Planting Plan – EDAW                          12 Feb 2008

L-PP-411    OP1   Planting Plan – EDAW                          12 Feb 2008

L-PP-412    OP1   Planting Plan – EDAW                          12 Feb 2008

L-PP-413    OP1   Planting Plan – EDAW                          12 Feb 2008

L-PP-414    OP1   Planting Plan – EDAW                          12 Feb 2008

L-PP-415    OP1   Planting Plan – EDAW                          12 Feb 2008

L-PP-416    OP1   Planting Plan – EDAW                          12 Feb 2008

L-PP-417    OP1   Planting Plan – EDAW                          12 Feb 2008

L-PP-418    OP1   Planting Plan - EDAW                          12 Feb 2008

L-SFP-701   OP1   Roof Water Runoff Stabilisation Plan – EDAW   12 Feb 2008

L-SFP-702   OP1   Roof Water Runoff Stabilisation Plan – EDAW   12 Feb 2008

L-SFP-703   OP1   Roof Water Runoff Stabilisation Plan – EDAW   12 Feb 2008

L-DT-901    OP1   Details – EDAW                                12 Feb 2008

L-DT-902    OP1   Details – EDAW                                12 Feb 2008

L-DT-903    OP1   Details – EDAW                                12 Feb 2008

L-DT-904    OP1   Details – EDAW                                12 Feb 2008


                                                                Page 3 of 11

Page 4

                                                                                          2008/256


      L-DT-905        OP1         Details – EDAW                                       12 Feb 2008

      L-DT-906        OP1         Details – EDAW                                       12 Feb 2008

      L-DT-907        OP1         Details – EDAW                                       12 Feb 2008

      WD 01           A           (Viewland Drive -Truck and Vehicle turning           01 Oct 2008
                                   detail)

      WD 02           A           (Veiwland Drive – Hard landscaping detail)           21 Oct 2008

      WS 01           A           Viewland Drive – Landscape Concept Plan              22 Oct 2008

2.    All manholes, inspection pits and grates are to be raised to finished surface levels and kept
      free of cover and be visible at all times to ensure prompt access in case of emergency.
3.    All trees must be planted a minimum distance of 1 metre from all services. All koala food and
      habitat trees must have any trenches located a minimum of 1.5m from the tree trunk, with
      trenches within 4m of the tree trunk to be on one side of the tree only; tree roots greater than
      100mm diameter will generally not be cut but will be protected by tunnelling or bridging, and
      tree roots less than 100mm diameter will be cut cleanly and appropriately treated.
4.    Retaining walls are to be finished in accordance with the approved Landscape Management
      report.
5.    Any retaining wall not forming part of the pool or building and greater than 800mm in height
      (excluding crib walls) must have timber posts installed at 10 m intervals with a diameter
      greater than 200mm for koala access, or retaining walls must have modest slope and suitable
      textures to facilitate climbing by koalas.
6.    Any unfenced pools must have a rope installed for koalas to exit the pool.
7.    Work required on and around existing trees is to be supervised and instructed under the
      guidance of a suitably qualified arborist. Prior to the felling or lopping of trees in construction
      work areas a qualified fauna spotter is to assess the trees for the presence of fauna, and
      recommend appropriate action.
8.    Protection of trees is to be carried out during building work. Trees to be retained on sites are
      to be isolated with orange safety mesh around the tree’s canopy ‘drip line’, or generally to a
      minimum distance of 1.5m from the trunk where this is not practically possible. No earth is to
      be deposited around the base of any tree.
9.    The relevant requirements of the Flora and Fauna Implementation Management Plan and the
      Koala Implementation Management Plan must be complied with at all times.
10.   The landscaping construction must be implemented in accordance with horticultural industry
      best practices.
11.   The development of the site shall be carried out in such a manner as to prevent dust and/or
      sand nuisance to residents in the vicinity of the development.
12.   Construction work and other associated activities are permitted only during the hours of 7.00
      am and 6.00 pm Monday to Saturday. No work is permitted on Sundays or public holidays,
      except where extended hours are approved by the Manager - Land Development or his
      nominee.
13.   Sediment and erosion control measures must be in place prior to works commencing. If such
      measures are not in place or are not satisfactory, ‘on the spot’ fines may be issued. Such fines
      can be issued if sediments from the site are found to enter or have the potential to enter
      Council’s stormwater system or natural waterways.
                                                                                      Page 4 of 11

Page 5

                                                                                            2008/256

14.    The requirements of this development approval are to be effected, prior to the use of the
       relevant premises. Council reserves the right to call upon the bond or guaranteed sum
       applicable to the overall site to effect compliance with conditions.
15.    This Development Permit lapses if the development has not happened by 24 June 2010,
       unless application to extend the currency is approved by Council.
Additional Conditions – Viewland Drive Entrance
16.    Sight line requirements of AS 2890.1 section 3.2.4 are to be adhered to with respect to
       pedestrian safety and for vehicles leaving the site into Viewland Drive.
17.    The “ existing path extended” along Viewland Drive, as shown on the submitted drawings
       WD01 Rev A dated 1/10/08 and WD02 Rev A dated 21/10/08 shall be a minimum of 1.2
       meters wide, not 0.9 meters.
18.    The Fire Wall to the residential property on 33 Viewland Drive shall not exceed 2 meters in
       height from natural ground level and shall meet the requirements of AS1596:2008 – Storage
       and Handling of LPG.
19.    Additional 8 x 45 litre Callitris columellaris (Bribie Island Pines) are to be planted on the site to
       offset the removal of the trees for the Viewland drive access. A plan is to be submitted to
       Council showing the locations of the additional trees.
20.    All other vegetation shall be protected from interference resulting from clearing or construction
       activities by:
        A.       Clearly marking vegetation to be retained with flagging tape;
        B.       Installing protective fencing around the drip line of the vegetation;
        C.       Stockpiling, storage and vehicle parking occurs in already cleared areas and does
                 not cause interference with vegetation; and
21.    Low impact construction techniques are used around vegetation to minimise interference with
       the vegetation.
22.    The landscaping construction must be implemented in accordance with horticultural industry
       best practices and in accordance with Planning Scheme Policy 3 Landscaping Plants and
       Guidelines.
5      REFERRAL AGENCY CONDITIONS

The referral agencies applicable to this application are:

 Referral Trigger              Referral Status     Referral Agency         Referral Address

 Nil

6      APPROVED PLANS/DOCUMENTS
The approved plans and / or documents for this development approval are listed in the following
table:

 Plan / Document        Rev.        Plan / Document Name                                  Date
 No.

 L-LE-002               OP1         Legend - EDAW                                         12 Feb 2008

 L-LE-003               OP1         Planting Schedule – EDAW                              12 Feb 2008

 L-TR-101               OP1         Tree Retention Plan – EDAW                            12 Feb 2008

                                                                                         Page 5 of 11

Page 6

                                                 2008/256


L-TR-102   OP1   Tree Retention Plan – EDAW   12 Feb 2008

L-TR-103   OP1   Tree Retention Plan – EDAW   12 Feb 2008

L-SF-201   OP1   Surface Finishes - EDAW      12 Feb 2008

L-SF-202   OP1   Surface Finishes – EDAW      12 Feb 2008

L-SF-203   OP1   Surface Finishes – EDAW      12 Feb 2008

L-SF-204   OP1   Surface Finishes – EDAW      12 Feb 2008

L-SF-205   OP1   Surface Finishes – EDAW      12 Feb 2008

L-SF-206   OP1   Surface Finishes – EDAW      12 Feb 2008

L-SF-207   OP1   Surface Finishes – EDAW      12 Feb 2008

L-SF-208   OP1   Surface Finishes – EDAW      12 Feb 2008

L-SF-209   OP1   Surface Finishes – EDAW      12 Feb 2008

L-SF-210   OP1   Surface Finishes – EDAW      12 Feb 2008

L-SF-211   OP1   Surface Finishes – EDAW      12 Feb 2008

L-SF-212   OP1   Surface Finishes – EDAW      12 Feb 2008

L-SF-213   OP1   Surface Finishes – EDAW      12 Feb 2008

L-SF-214   OP1   Surface Finishes – EDAW      12 Feb 2008

L-SF-215   OP1   Surface Finishes – EDAW      12 Feb 2008

L-SF-216   OP1   Surface Finishes – EDAW      12 Feb 2008

L-SF-217   OP1   Surface Finishes – EDAW      12 Feb 2008

L-SF-218   OP1   Surface Finishes – EDAW      12 Feb 2008

L-PP-401   OP1   Planting Plan – EDAW         12 Feb 2008

L-PP-402   OP1   Planting Plan - EDAW         12 Feb 2008

L-PP-403   OP1   Planting Plan – EDAW         12 Feb 2008

L-PP-404   OP1   Planting Plan – EDAW         12 Feb 2008

L-PP-405   OP1   Planting Plan – EDAW         12 Feb 2008

L-PP-406   OP1   Planting Plan – EDAW         12 Feb 2008


                                              Page 6 of 11

Page 7

                                                                   2008/256


L-PP-407    OP1   Planting Plan – EDAW                          12 Feb 2008

L-PP-408    OP1   Planting Plan – EDAW                          12 Feb 2008

L-PP-409    OP1   Planting Plan – EDAW                          12 Feb 2008

L-PP-410    OP1   Planting Plan – EDAW                          12 Feb 2008

L-PP-411    OP1   Planting Plan – EDAW                          12 Feb 2008

L-PP-412    OP1   Planting Plan – EDAW                          12 Feb 2008

L-PP-413    OP1   Planting Plan – EDAW                          12 Feb 2008

L-PP-414    OP1   Planting Plan – EDAW                          12 Feb 2008

L-PP-415    OP1   Planting Plan – EDAW                          12 Feb 2008

L-PP-416    OP1   Planting Plan – EDAW                          12 Feb 2008

L-PP-417    OP1   Planting Plan – EDAW                          12 Feb 2008

L-PP-418    OP1   Planting Plan - EDAW                          12 Feb 2008

L-SFP-701   OP1   Roof Water Runoff Stabilisation Plan – EDAW   12 Feb 2008

L-SFP-702   OP1   Roof Water Runoff Stabilisation Plan – EDAW   12 Feb 2008

L-SFP-703   OP1   Roof Water Runoff Stabilisation Plan – EDAW   12 Feb 2008

L-DT-901    OP1   Details – EDAW                                12 Feb 2008

L-DT-902    OP1   Details – EDAW                                12 Feb 2008

L-DT-903    OP1   Details – EDAW                                12 Feb 2008

L-DT-904    OP1   Details – EDAW                                12 Feb 2008

L-DT-905    OP1   Details – EDAW                                12 Feb 2008

L-DT-906    OP1   Details – EDAW                                12 Feb 2008

L-DT-907    OP1   Details – EDAW                                12 Feb 2008

WD 01       A     (Viewland Drive -Truck and Vehicle turning    01 Oct 2008
                   detail)

WD 02       A     (Veiwland Drive – Hard landscaping detail)    21 Oct 2008

WS 01       A     Viewland Drive – Landscape Concept Plan       22 Oct 2008



                                                                Page 7 of 11

Page 8

                                                                                          2008/256


7      ADVISORY NOTES

The following Advisory Notes are for information purposes only and do not form conditions of
approval:
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries
out an activity must take all reasonable and practicable measures to ensure the activity does not
harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial
monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions
may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act
can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural
heritage or the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
obligations under the ACH Act.
8      PROPERTY NOTES

Not applicable

9      PRELIMINARY APPROVAL OVERRIDING SCHEME
Not applicable

10     FURTHER DEVELOPMENT PERMITS REQUIRED

 Type of Development Permit required           Subject of the required Development Permit
 Nil

11     SELF ASSESSABLE CODES
Not applicable

12     SUBMISSIONS
Not applicable

13     REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME

Not applicable

14     RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Integrated Planning Act 1997 is attached.

15     OTHER DETAILS
Should you wish to obtain more information about Council’s decision electronic copies are available
on line at www.sunshinecoast.qld.gov.au, or at Council Offices.




                                                                                      Page 8 of 11

Page 9

                                                       2008/256

DECISION NOTICE HISTORY
 Original Decision Notice issued 24 June 2008.
 Negotiated Decision Notice issued 22 July
  2008 with amendment to Condition 4.
 Change to an Existing Approval issued 10
  December 2008 with amendment to Condition
  1 and inclusion of seven additional conditions.
Yours faithfully,



Kerri Coyle
MANAGER – LAND USE




                                                    Page 9 of 11

Page 10

                                                                                                           2008/256


                                                        Appeal Rights
                                                        INTEGRATED PLANNING ACT 1997 & 1998 REGULATION




The following is an extract from the Integrated                         (6) If an application involves assessment against a
Planning Act (Chapter 4).                                           concurrence agency code, appeal rights for submitters
                                                                    for the application are not available against the part of
Division 8 - Appeals to                court   relating   to        the approval that represents the concurrence agency’s
development applications                                            response for the code.
Appeals by applicants                                               Appeals by advice agency submitters
4.1.27.(1) An applicant for a development application               4.1.29.(1) An advice agency may, within the limits of its
may appeal to the court against any of the following-               jurisdiction, appeal to the court about the giving of a
(a) the refusal, or the refusal in part, of a development           development approval for a development application if-
      application;                                                  (a) the development      application    involves   impact
(b) a matter stated in a development approval, including               assessment; and
      any condition applying to the development, and the            (b) the advice agency told the applicant and the
      identification of a code under section 3.1.6;1                   assessment manager to treat its response to the
(c) the decision to give a preliminary approval when a                 application as a submission for an appeal.
      development permit was applied for;                              (2) The appeal must be started within 20 business
(d) the length of a relevant period;                                days after the day the decision notice or negotiated
                                                                    decision notice is given to the advice agency as a
(e) a deemed refusal.                                               submitter.
    (2) An appeal under subsection (1)(a) to (d) must be            Appeals for matters arising after approval given
started within 20 business days (the “applicant’s appeal
                                                                    (co-respondents)
period”) after the day the decision notice or negotiated
decision notice is given to the applicant.                          4.1.30.(1) For a development approval given for a
                                                                    development application, a person to whom any of the
    (3) An appeal under subsection (1)(e) may be started
                                                                    following notices have been given may appeal to the
at any time after the last day a decision on the matter
                                                                    court against the decision in the notice-
should have been made.
                                                                    (a) a notice giving a decision on a request for extension
Appeals by submitters
                                                                       of the relevanrt period for an approval;
4.1.28.(1) A submitter for a development application may
                                                                    (b) a notice giving a decision on a request to make a
appeal to the court about-
                                                                       minor change to an approval.
(a) the giving of a development approval, including any
                                                                        (2) The appeal must be started within 20 business
      conditions (or lack of conditions) or other provisions
                                                                    days after the day the notice of the decision is given to
      of the approval; or
                                                                    the person.
(b) the length of a relevant period for the approval.
                                                                        (3) Subsection (1)(a) does not apply if the approval
    (2) The appeal must be started within 20 business               resulted from a development application (superseded
days (the “submitters appeal period”) after the day the             planning scheme) that was assessed as if it were an
decision notice or negotiated decision notice is given to           application under a superseded planning scheme.
the submitter.
                                                                       (4) Also, a person who has made a request
    (3) If a person withdraws a submission before the               mentioned in subsection (1) may appeal to the court
application is decided, the person may not appeal the               against a deemed refusal of the request.
decision.
                                                                       (5) An appeal under subsection (4) may be started at
   (4) If an application involves both impact assessment            any time after the last day the decision on the matter
and code assessment, appeal rights for submitters are               should have been made.
available only for the part of the application involving
impact assessment.                                                  Division 9 - Appeals to court about other matters
    (5) If an application is processed under section                Appeals for matters arising after approval given
6.1.28(2), appeal rights for submitters for the application         (no co-respondents)
are available only for the aspects of the development that          4.1.31.(1) A person to whom any of the following notices
would have required public notification under the                   have been given may appeal to the court against the
repealed Act.                                                       decision in the notice-
                                                                    (a) a notice giving a decision on a request to change or
                                                                       cancel a condition of a development approval.
1
    Section 3.1.6 (Preliminary approval may override local
    planning instrument)
                                                                                                    Page 10 of 11

Page 11

                                                                                                  2008/256

(b) a notice under section 6.1.442 giving a decision to      (c) the decision to give a preliminary approval when a
    change or cancel a condition of a development                  development permit was applied for;
    approval.                                                (d) the length of a period mentioned in section 3.5.21
    (2) The appeal must be started within 20 business              relevant period;
       days after the day the notice of the decision is      (e) a deemed refusal.
       given to the person.
                                                                 (2) An appeal under subsection (1)(a) to (d) must be
    (3) Also, a person who has made a request                started within 20 business days (the “applicant’s appeal
       mentioned in subsection (1)(a) may appeal to the      period”) after the day the decision notice or negotiated
       court against a deemed refusal of the request.        decision notice is given to the applicant.
    (4) An appeal under subsection (3) may be started at         (3) An appeal under subsection (1)(e) may be started
       any time after the last day the decision on the       at any time after the last day a decision on the matter
       matter should have been made.                         should have been made.
Appeals against decisions to change approval conditions      The Registrar for the Building and Development
under the repealed Act                                       Tribunal may be contacted at the website
4.1.33A.(1) A person who is dissatisfied with a decision     http://www.localgovernment.qld.gov.au/
made on an application to change the conditions
attached to an approval given under section 2.19(3)or        For Infrastructure Charges Only
section 4.4 of the repealed Act may appeal to the court      4.1.36 Appeals about particular infrastructure
against-                                                     charges
(a) the decision; or                                         (1) This section applies to a person who has been
(b) a deemed refusal of the application.                     given, and is dissatisfied with, an infrastructure charges
                                                             notice or a regulated State infrastructure charges notice.
    (2) An appeal under subsection (1)(a) must be
started within 20 business days after the day notice of      (2) The person may appeal to the court against the
the decision is to be given to the person.                   notice.
    (3) An appeal under subsection (1)(b) may be started     (3) The appeal must be started within 20 business days
at any time after the last day a decision on the matter      after-
should have been made.                                       (a) if the notice is given because of a development
Appeals against local laws                                        approval or master plan approval-the day the
                                                                  applicant is given notice of the decision about the
4.1.33B.(1) An applicant who is dissatisfied with a
                                                                  approval; or
decision of a local government or the conditions applied
under a local law about the use of premises or the           (b)    otherwise-the day the notice is given to the person.
erection of a building or other structure permitted by the   (4)    An appeal under this section may only be about-
planning scheme may appeal to the court against the
                                                             (a) whether a charge in the notice is so unreasonable
decision or the conditions applied.                              that no reasonable relevant local government, State
    (2) The appeal must be started within 20 business            infrastructure provider or coordinating agency could
days after the day notice of the decision is given to the        have imposed it; or
applicant.
                                                             (b) an error in the calculation of the charge.
For Building Works Only                                      (5) To remove any doubt, it is declared that an appeal
Rights of appeal conferred by Section 4.2.9 of the           under this section can not be about the methodology
Integrated Planning Act 1997 as follows:                     used to establish the charge in the relevant infrastructure
Division 3 – Appeals to tribunals relating to                charges schedule or regulated State infrastructure
development applications                                     charges schedule.
Appeals by applicants
4.2.9(1) An applicant for a development application may
appeal to the Building and Development Tribunal against
any of the following-
(a) the refusal, or the refusal in part, of a development
    application;
(b) a matter stated in a development approval, including
    any condition applying to the development, and the
    identification of a code under section 3.1.6;3


2
   Section 6.1.44 (Conditions may be changed or
  cancelled by assessment manager or concurrence
  agency in certain circumstances)
3
  Section 3.1.6 (Preliminary approval may override local
  planning instrument)
                                                                                             Page 11 of 11

Used in these records

About this file

File size
65 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - Change to an Existing Approval - 010.2008.00000256.002 [As Published].pdf · 65 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.