Council archive · source document
Decision Notice - 010.2007.00000694.001 [As Published] · 152007.694
Form 6 - Decision Notice
INTEGRATED PLANNING ACT 1997, S3.5.15, IDAS DEVELOPMENT APPLICATION
File No: 2007/694 Date of Decision: 12 October 2007
1. APPLICANT DETAILS
Name: John Reid & Susan Reid
Postal address: CARE Max Watterson & Associates
PO Box 639
COOROY QLD 4563
Phone no: 5442 6121 Fax no: 5442 5125
2. PROPERTY DESCRIPTION
Street address: 82 Tingira Crescent SUNRISE BEACH, 80 Tingira Crescent SUNRISE BEACH
Real property LOT: 22 RP: 126837, LOT: 23 RP: 126837
description:
3. OWNER DETAILS
Name: John Reid & Susan Reid
Postal address: 1 Carnoustie Court
INDOOROOPILLY QLD 4068
4. REFERRAL AGENCIES
Referral Agency Address Basis
Nil
5. APPLICATION TYPE
Development Development Details Preliminary Development
Approval Permit
Lot Reconfiguration – In accordance with this approval No Yes
Boundary Realignment must generally comply with the
approved plans of development. The
approved plan is titled “PLAN OF
PROPOSED RECONFIGURATION
of Lots 22 & 23 on RP126837” Ref
07/2373A by Max Watterson &
Associates dated 19 February 2007
and as may be amended by these
conditions.
6. DECISION DETAILS
Council decided to approve this application on 12 October 2007, subject to conditions.
7. APPLICABLE CODES
The developer must comply with the following codes for self-assessable development related to the development
approved under this Development Permit:-
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 6 pages
Page 2
NOOSA COUNCIL IDAS Development Application Decision Notice 2 of 7 N/A. 8. CONDITIONS The approval is subject to conditions. Noosa Council’s conditions are attached. 9. FURTHER DEVELOPMENT PERMITS REQUIRED Type of Development Permit required Subject of the required Development Permit Operational Works Sewer, Landscaping 10. RIGHTS OF APPEAL Rights of appeal in relation to this application are attached. 11. ASSESSMENT MANAGER Name: Noosa Council Signature: Date: NSC c:\docume~1\rhr\locals~1\temp\bcl technologies\easypdf 5\@bcl@c80ef45d\@[email protected]
Page 3
NOOSA COUNCIL IDAS Development Application Decision Notice 3 of 7
Noosa Council Conditions
INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION
1. For the purpose of these conditions, the following definitions apply: -
1.1. A Plan of Survey means the plan for the reconfiguration of a lot required to be endorsed by
Council pursuant to S3.7.1 of the Integrated Planning Act 1997.
1.2. A Registered Professional Civil Engineer means an engineer who is registered with the board of
Professional Engineers of Queensland.
1.3. The person acting on this permit means any person or company who undertakes development
pursuant to this permit.
2. Development undertaken in accordance with this approval must generally comply with the approved plans
of development. The approved plan is titled “PLAN OF PROPOSED RECONFIGURATION of Lots 22 & 23
on RP126837” Ref 07/2373A by Max Watterson & Associates dated 19 February 2007 and as may be
amended by these conditions.
3. Pursuant to Section 3.7.3(3) (b) of the Integrated Planning Act, all outstanding rates and charges due and
payable to Noosa Council in respect of the lots being reconfigured shall be paid prior to endorsement of
the Plan of Survey.
4. Pursuant to Section 3.5.21(2) of the Integrated Planning Act 1997, the currency period is four (4) years up
to (12 October 2011) by which time all conditions must have been complied with, Operational Works
completed, and the Plan of Survey lodged with the Council for endorsement.
5. A Plan of Survey for Council endorsement shall be submitted to Council in the correct form with the fees
as prescribed in Council's adopted fee schedule.
6. Any necessary Titles Office forms requiring the consent of Council is to be submitted prior to the
endorsing of the Plan of Survey.
7. Prior to the endorsement of the Plan of Survey, the Applicant's Solicitor shall give Council's Solicitor an
appropriate undertaking in writing that in conjunction with lodgement of the Plan of Survey at the Land
Titles Office, the Title Deed will also be lodged and any additional Titles Office forms requiring the consent
of Council being attended to promptly.
Town Water Supply
8. The site shall be connected to Council’s existing town water supply and be constructed in accordance with
Council’s standards and requirements at no cost to Council.
9. Each individual water connection to the water reticulation system shall extend to the property boundary
and be metered. All fees for the supply of water meters shall be paid to the Council.
10. All water meters must be located outside the property boundary and in an easily assessable location to
facilitate unhindered reading by Council and/or Council’s contracted water meter readers, and not behind
fences or locked gates. In this regard approval of the water meter configuration and location must be
obtained from Council’s Water & Sewerage Capital Works Manager prior to lodgement and approval of
hydraulic drawings.
Sewer Mains
11. A sewer main and manhole/s shall be constructed in accordance with Council’s standards and
requirements along the rear (eastern) boundary line of Lot 1 to provide sewer service to the corner
allotment, Lot 2. Design plans prepared and certified by a suitably qualified Registered Professional
Engineer shall be submitted for Council’s approval. A Development Permit for Operational Works shall be
required.
In this regard, sewer connections shall be provided to the proposed allotments in accordance with
Council’s standards and requirements.
NSC c:\docume~1\rhr\locals~1\temp\bcl technologies\easypdf 5\@bcl@c80ef45d\@[email protected]
Page 4
NOOSA COUNCIL IDAS Development Application Decision Notice 4 of 7
12. The obsolete sewer main and the end of the line manhole along the north boundary line of the site should
be dug out and removed from the site.
13. A registered easement shall be created over the zone of influence of all sewers within the subject site.
The easement shall generally be parallel to and centred over the sewer main and be equivalent in width to
twice the depth to invert level of the sewer at the deepest point within the allotment (measured from the
finished surface) and be no less than 3.0m wide overall. In this regard a licensed surveyor shall
accurately locate all sewer mains and determine the necessary width of the easement, which shall be
shown on any plans submitted for Operational Works / Building Works approval. To this extent the
surveyor shall certify that the sewer and the zone of influence is wholly contained within the easement to
be created.
A duly executed copy of the easement shall be submitted to Council for perusal prior to Council’s
endorsement of the Plan of Survey.
Any changes required by Council’s Solicitor must be corrected immediately.
14. No building or other structure shall be constructed or encroach over an easement.
Power Supply
15. A separate underground electricity service shall be provided to each of Lot 1 and Lot 2
In this regard, an approved ENERGEX Electrical Design Consultant shall work in conjunction with
Council’s Manager - Works Support to prepare detailed designs of the electrical proposal.
The detailed deigns shall then be submitted to ENERGEX for approval and a copy of their approval
submitted to Council in conjunction with a “Certificate of Electricity Supply for Proposed Subdivisions”
(prepared by an approved ENERGEX Electrical Design Consultant) prior to Council endorsing the Plan of
Survey.
Any agreement with ENERGEX or an approved ENERGEX Electrical Design Consultant shall be wholly at
the applicant’s expense and shall not entail a financial encumbrance on future purchasers of the proposed
lots.
Telecommunication
16. The requirements for TELECOMMUNICATION services shall be satisfied in relation to the provision of
telephone services to the proposed lots. In this regard written confirmation from an approved
telecommunication agency shall be submitted to the Council prior to Council endorsing the Plan of
Survey.
Vegetation Protection & Weed Removal
17. Existing native trees on site and within the road reserve are to be retained, except where required to be
removed due to a development approval or the conduct of an approved use. Driveways and buildings
sites should be designed to avoid the removal of native vegetation.
18. All Class 1, Class 2 and Class 3 pest plants declared under the Land Protection (Pest and Stock Route
Management) Act 2002 and including all Camphor Laurel trees on the property are to be controlled on the
site prior to Council endorsement of the Plan of Survey. In this context “controlled” shall mean, for class 1
and 2 pests, completely eradicated. For class 3 pests it shall mean removal of the plants where they
threaten environmentally significant areas of the site such as riparian zones and areas of natural
vegetation.
Where class 3 plants are removed as a result of this condition and there is not sufficient natural
regeneration of native species, the areas shall be replanted with endemic native species so that a
sustainable natural ecosystem is restored.
Council’s Conservation Management Supervisor will not inspect the site until 30 days after the weed
treatment and replanting is complete.
19. If there is any cleared vegetation it shall be suitably processed by one of the following methods and
removed from the site:-
19.1. Processing through a wood chipper or shredder. The resulting mulch is to be stockpiled loose in
heaps of less than 1000 cubic metres, less than 2.5 metres high with a minimum of 10 metres
between edges of heaps.
19.2. Disposal for firewood.
19.3. Disposal for landscaping purposes.
NSC c:\docume~1\rhr\locals~1\temp\bcl technologies\easypdf 5\@bcl@c80ef45d\@[email protected]
Page 5
NOOSA COUNCIL IDAS Development Application Decision Notice 5 of 7
19.4. Transport to alternative site for breaking down materials provided that all necessary permits have
been obtained to allow the alternate site to be used for this purpose.
The disposal method for clearing works is to be submitted in conjunction with an application for a
Development Permit for Operational Work. The Applicant is advised that other methods may be
considered provided full details of the method are submitted.
The Applicant is also advised that burning off is an unacceptable method of disposal.
Erosion and Sediment Control
20. Any person acting on this permit shall prevent erosion and sediment export from leaving the site. Site
control measures such as silt fencing, controlled gravel access to the site and controlled disposal of
waste, will be necessary. This particularly relevant to the required relocation of the existing sewer main.
Bonds
21. Prior to Council giving approval for Development Permit for Operational Works the applicant shall submit
$4,000 bond to ensure compliance with the conditions of this approval. The bond will be returned
following the acceptance of all works.
General
22. For the following classes of work associated with development, a Development Permit for Operational
Works must be obtained prior to commencement of works relating to that class of work.
22.1. Sewer.
23. To facilitate production of As Constructed drawings it is suggested that all design drawings are submitted
in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the use of ADAC are
available at www.adac.com.au).
24. As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer for design
intent, and a Licensed Surveyor shall certify the cadastre and the location, level and type of all services
and structures. All of which shall be submitted to Council for checking and for Council’s records.
The data must fully detail levels for all engineering works including but not limited to sewer main and
manholes. The data shall be submitted in the Asset Design and As Constructed (ADAC) digital format.
(Guidelines on the use of ADAC are available at www.adac.com.au).
25. Endorsement of the Plan of Survey shall not be granted until all As Constructed information has been
supplied and accepted by Council.
26. Any damage caused to any public utility during the course of construction shall be repaired to Council’s
standards and at no cost to Council.
27. Any alteration of any public utility or other facilities necessitated by this approval or associated
construction works internal or external to the site shall be the applicant’s responsibility and at no cost to
Council.
28. The transportation of all materials to and from the site shall be undertaken in a manner such that no
particle matter escapes onto a public road. All vehicles carrying materials either to or from the site shall
be covered to prevent materials including dust being windblown from the vehicle.
NSC c:\docume~1\rhr\locals~1\temp\bcl technologies\easypdf 5\@bcl@c80ef45d\@[email protected]
Page 6
NOOSA COUNCIL IDAS Development Application Decision Notice 6 of 7
Appeal Rights
INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION
The following is an extract from the Integrated (6) If an application involves assessment against
Planning Act (Chapter 4). a concurrence agency code, appeal rights for
submitters for the application are not available
Division 8 - Appeals to court relating to
against the part of the approval that represents the
development applications
concurrence agency’s response for the code.
Appeals by applicants Appeals by advice agency submitters
4.1.27.(1) An applicant for a development application 4.1.29.(1) An advice agency may, within the limits of
may appeal to the court against any of the following- its jurisdiction, appeal to the court about the giving of
(a) the refusal, or the refusal in part, of a a development approval for a development
development application; application if-
(b) a matter stated in a development approval, (a) the development application involves impact
including any condition applying to the assessment; and
development, and the identification of a code (b) the advice agency told the applicant and the
1
under section 3.1.6; assessment manager to treat its response to the
(c) the decision to give a preliminary approval when a application as a submission for an appeal.
development permit was applied for;
(2) The appeal must be started within 20 business
(d) the length of a currency period; days after the day the decision notice or negotiated
decision notice is given to the advice agency as a
(e) a deemed refusal. submitter.
(2) An appeal under subsection (1)(a) to (d) must Appeals for matters arising after approval given
be started within 20 business days (the “applicant’s (co-respondents)
appeal period”) after the day the decision notice or
negotiated decision notice is given to the applicant. 4.1.30.(1) For a development approval given for a
development application, a person to whom any of
(3) An appeal under subsection (1)(e) may be the following notices have been given may appeal to
started at any time after the last day a decision on the the court against the decision in the notice-
matter should have been made.
(a) a notice giving a decision on a request for
Appeals by submitters extension of the currency period for an approval;
4.1.28.(1) A submitter for a development application (b) a notice giving a decision on a request to make a
may appeal to the court about- minor change to an approval.
(a) the giving of a development approval, including (2) The appeal must be started within 20 business
any conditions (or lack of conditions) or other days after the day the notice of the decision is given
provisions of the approval; or to the person.
(b) the length of a currency period for the approval. (3) Subsection (1)(a) does not apply if the
(2) The appeal must be started within 20 business approval resulted from a development application
(superseded planning scheme) that was assessed as
days (the “submitters appeal period”) after the day
if it were an application under a superseded planning
the decision notice or negotiated decision notice is
scheme.
given to the submitter.
(4) Also, a person who has made a request
(3) If a person withdraws a submission before the
mentioned in subsection (1) may appeal to the court
application is decided, the person may not appeal the
against a deemed refusal of the request.
decision.
(5) An appeal under subsection (4) may be
(4) If an application involves both impact
started at any time after the last day the decision on
assessment and code assessment, appeal rights for
the matter should have been made.
submitters are available only for the part of the
application involving impact assessment. Division 9 - Appeals to court about other matters
(5) If an application is processed under section Appeals for matters arising after approval given
6.1.28(2), appeal rights for submitters for the (no co-respondents)
application are available only for the aspects of the
development that would have required public 4.1.31.(1) A person to whom any of the following
notification under the repealed Act. notices have been given may appeal to the court
against the decision in the notice-
(a) a notice giving a decision on a request to change
or cancel a condition of a development approval.
1
Section 3.1.6 (Preliminary approval may override local planning
instrument)
NSC c:\docume~1\rhr\locals~1\temp\bcl technologies\easypdf 5\@bcl@c80ef45d\@[email protected]
Page 7
NOOSA COUNCIL IDAS Development Application Decision Notice 7 of 7
2
(b) a notice under section 6.1.44 giving a decision to
change or cancel a condition of a development
approval.
(2) The appeal must be started within 20 business
days after the day the notice of the decision is given
to the person.
(3) Also, a person who has made a request
mentioned in subsection (1)(a) may appeal to the
court against a deemed refusal of the request.
(4) An appeal under subsection (3) may be
started at any time after the last day the decision on
the matter should have been made.
Appeals against decisions to change approval
conditions under the repealed Act
4.1.33A.(1) A person who is dissatisfied with a
decision made on an application to change the
conditions attached to an approval given under
section 2.19(3)or section 4.4 of the repealed Act may
appeal to the court against-
(a) the decision; or
(b) a deemed refusal of the application.
(2) An appeal under subsection (1)(a) must be
started within 20 business days after the day notice of
the decision is to be given to the person.
(3) An appeal under subsection (1)(b) may be
started at any time after the last day a decision on the
matter should have been made.
Appeals against local laws
4.1.33B.(1) An applicant who is dissatisfied with a
decision of a local government or the conditions
applied under a local law about the use of premises
or the erection of a building or other structure
permitted by the planning scheme may appeal to the
court against the decision or the conditions applied.
(2) The appeal must be started within 20 business
days after the day notice of the decision is given to
the applicant.
2
Section 6.1.44 (Conditions may be changed or cancelled by
assessment manager or concurrence agency in certain
circumstances)
NSC c:\docume~1\rhr\locals~1\temp\bcl technologies\easypdf 5\@bcl@c80ef45d\@[email protected]
Used in these records
Decision Notice - 010.2007.00000694.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 33 KB (small file)
- File type
No other editions are linked here.