Council archive · source document
Minor Change Existing Approval 51993 559 01 (As Published) · 51993.559.01
Officer: Matthew Pinese
Direct Telephone: 07 5329 6245
Our Reference: 51993.559.01
Your Reference: 0806
10 April 2026
JM O'Connell & RM O'Connell
C/- Pivotal Perspective Pty Ltd
3/93 Hilton Tce
TEWANTIN QLD 4565
[email protected]
Dear Sir/Madam,
Decision Notice – Minor Change
Planning Act 2016
I refer to your application received on 10 December 2025, requesting a minor change to an existing
development approval. Council decided your requested changes.
Details of the decision are as follows:
1. APPLICATION DETAILS
Application No: 51993.559.01
Street address: Sol-y-sombra 1/1 Solway Dr, Sunshine Beach Qld 4567
Real property description: Lot 1 GTP 4195
Planning Scheme: Noosa Plan 2020 (26 September 2025)
2. DECISION DETAILS
The following type of approval was issued on 5 May 1993.
• Town Planning Consent Permit – Group Housing Development (4 Units)
In relation to the request to make a minor change to the existing approval, Council on 8 April 2026,
decided to approve the requested changes. The changes are detailed below.
A. Approve the change.
B. Include additional conditions 22 and 23.
3. CURRENCY PERIOD OF APPROVAL
The currency period for this development approval is stated in the conditions below.
ABN 97.969.214.121 PO Box 141
noosa.qld.gov.au Tewantin QLD 4565
[email protected] 07 5329 6500
Page 1 of 6
Document Set ID: 24671731
Version: 6, Version Date: 13/04/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 5 pages
Page 2
4. ASSESSMENT MANAGER CONDITIONS
1. Submission to and approval by Council of building plans in accordance with the Building Act,
Council’s By-laws and Policies, the conditions of this approval and substantially in
accordance with plans 9224.01 to 9224.03 and the Shire of Noosa Planning Scheme apart
from where amendments are required or dispensations have been granted in conjunction
with this approval.
2. Any fencing provided in connection with the development is to be setback an average two
(2) metres to any road frontage pursuant to clause 36 (6) (c) of the Schedule to the Planning
Scheme. The plans submitted for building approval are to indicate the design of the fence.
3. Provision of at least 7 off-street parking spaces, comprising 4 covered spaces and 3
uncovered spaces, and access thereto which are to be provided with a sealed pavement and
designed, drained constructed and maintained in accordance with the Planning Scheme,
Councils Policies and to the reasonable satisfaction of the Shire Engineer. Plans and
specifications for these works are to be submitted to the Shire Engineer for approval in
conjunction with the Building Application. A Building Approval shall not be granted until the
Shire Engineer has approved of the carparking and access scheme.
The plans submitted for Building Approval are to provide amended car manoeuvring and
driveway area which accord with Council’s standards. In this regard it is suggested: -
a. The carport and adjacent visitor’s carparking space for Unit 1 be relocated 1 metre to
the south-west to provide an adequate turning circle.
b. The driveway to Solway Drive is to be increased in width to 6 metres where it enters
Solway Drive.
c. An additional manoeuvring area is to be provided between Unit 4 and the carport for
Unit 2 to provide car manoeuvring areas for Units 3 and 4.
4. Payment to Council of $200 in accordance with Council’s Policy on Beach Access
Contributions, prior to the issue of Building Approval.
5. There is to be no detrimental effect upon the amenity of the neighbourhood by reason of the
creation of excessive noise, lighting nuisance or other emissions.
6. The open space and setback areas are to be landscaped in accordance with Council’s Policy
on Landscaping Guidelines and a properly prepared landscape plan to be submitted to and
approved by the Shire Planner, prior to the issue of a Building Approval. Such landscaping
is to be completed in accordance with the approved landscape plan, prior to the premises
being occupied and maintained at all times thereafter to the reasonable satisfaction of the
Shire Planner.
7. Existing trees on the site and within the road reserves are to be retained, except where
required to be removed due to building operations or the conduct of the approved use. The
landscaping plans referred to above are to denote areas of existing vegetation or existing
trees proposed to be retained, which is to include the tress adjacent to the driveway in Bryan
Street.
8. Construction work and other associated activities are permitted only during the hours of
7.00a.m. to 6.00p/m. Monday to Saturday. No work is permitted on public holidays, except
where extended hours are approved by the Building Surveyor.
9. All separate, adjoining lots that form part of this application are to be amalgamated into one
undivided lot in accordance with Section 5.11 of the Local Government (Planning and
Environment) Act, prior to the issue of a Building Approval.
Page 2 of 6
Document Set ID: 24671731
Version: 6, Version Date: 13/04/2026
Page 3
10. Payment of contributions in accordance with Council’s Policy on Water Supply and Sewerage
Headworks, current at the time of Building Approval. An estimate only of the charges as at
April 1993 under the current policy is as follows: -
Water Supply - $3043
Sewerage - $2226
TOTAL: $5269
Please note that the headworks charges will alter in accordance with Price Index variations
or if any amendment is made to Council’s Policy.
If payment is not proposed to be made prior to the issue of Building Approval, a cash bond
or trading bank guarantee for the required amount is to be lodged, prior to the release of the
Approval. The contribution is then required to be made within fourteen (14) days of the issue
of Building Approval.
11. The footpath across both frontages of the site are to be upgraded by the provision of a 1.2
metres wide concrete footpath and the forming, grassing and topsoiling of the remaining area
to the satisfaction of the Shire Engineer. The footpath is to be generally located 0.9 metres
from the property alignment and is to be integrated with any existing slopes and vegetation
within the road reserve.
12. The developer shall bear the cost of alteration of any public utility or other facilities
necessitated by the development of the land or associated construction works external to the
site.
13. Connection to Council’s existing water supply and sewerage reticulation systems at the
developer’s expense to the standard and requirements of the Shire Engineer.
14. The developer shall provide a metered water connection from the water supply system to the
proposed development, in accordance with Council’s standards and to the satisfaction of the
Shire Engineer.
15. Roof and surface water is to be collected on site and is to be discharged through a single
underground drain line to Bryan Street to the satisfaction of the Shire Engineer. A Building
Approval shall not be granted until the Shire Engineer has approved of the drainage scheme.
16. Provision of approved refuse containers in accordance with the requirements of the Refuse
Management Regulations of 1983 for the storage and collection of refuse to the satisfaction
of Council’s Environmental Health Officer.
17. Any flat or unit intended to be let out for fee or reward is to be licensed annually with Council’s
Health Department in accordance with the provisions of Chapter 43 of Council’s By-Laws
prior to such letting.
18. The swimming pool shall be licensed annually with the Council’s Health Department in
accordance with the provisions of Chapter 42 of Council’s By-Laws.
19. Submission of a cash bond or trading bank guarantee to the sum of $4000 to secure
performance of conditions, prior to the issue of Building Approval. The cash bond or trading
bank guarantee will be returned upon performance of the conditions of approval.
20. The provisions of this approval are to be affected, prior to the commencement of the
approved use. Council reserves the right to call upon the bond or guaranteed sum referred
to in this approval for the purposes of litigation should the use not be conducted in
accordance with this approval.
21. The Town Planning Consent Permit may be revoked pursuant to Section 4.14 of the Local
Government (Planning and Environment) Act if commencement of erection or works have
not been made in accordance with that Permit or the rights conferred by that Permit are not
exercised within two (2) years of the date of issue of the Permit.
Page 3 of 6
Document Set ID: 24671731
Version: 6, Version Date: 13/04/2026
Page 4
The Town Planning Consent Permit lapses where: –
a. the use or erection of a building or other structure associated with the use has not been
commenced within four (4) years of the date of issue of the Town Planning Consent
Permit, unless application is made and approved by Council for an extension; or
b. the use of any premises pursuant to the Town Planning Consent Permit ceases for a
period of twelve (12) months.
Additional conditions – 8 April 2026 (Unit1)
22. Development authorised by this approval must be undertaken generally in accordance with
the Approved Plans listed in the table/s below.
Plan No. Rev. Plan/Document Name Date
21.1025.1A - Site Plan October 2025
21.1025.2A - Ground Floor Plan October 2025
21.1025.3A - First Floor/ Roof Plan October 2025
21.1025.4A - Elevations October 2025
23. The applicant is required to engage the services of a suitably qualified and experienced
arborist to minimise the impact the proposed building works will have on the health of the
Millettia pinnata tree located in the northeast corner of Lot 2. To that end, the applicant must
undertake the mitigation measures recommended by the Urban Forest Concepts, dated 20
March 2026, during the course of the building works. The work is to include root-pruning with
fine-jet high-pressure water, liquid waste removal via vacuum truck, application of root-
hormone and backfill of trench with sandy loam, with the supervision of all works undertaken
by an AQF Level 5 arborist in accordance with Australian Standards. The applicant is also
required to install a root barrier prior backfilling for ongoing protection of foundations along
this alignment.
5. REFERRAL AGENCIES
Not applicable.
6. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form part
of the assessment manager conditions:
Infrastructure Charges
1. All developments and/or changes to existing developments may require payment of
“Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution”
made pursuant to the planning legislation and regulations current at the time of issue. For
further information, please refer to https://www.noosa.qld.gov.au/Planning-and-
Development/Development-tools-and-guidelines/Infrastructure-Charges
7. PROPERTY NOTES
Not applicable.
8. FURTHER DEVELOPMENT PERMITS REQUIRED
Type of Development Permit Required Subject of the required Development Permit
Development Permit for Building Works All Building Works
Page 4 of 6
Document Set ID: 24671731
Version: 6, Version Date: 13/04/2026
Page 5
9. SUBMISSIONS
Not applicable.
10. RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Planning Act 2016 is attached.
11. OTHER DETAILS
If you wish to obtain more information about the decision, electronic copies are available on line at
www.noosa.qld.gov.au or at Council Offices.
Yours faithfully
Matthew Pinese
Development Planner | Development Assessment
Development & Regulation
Enc: Appeal Rights
Approved Plans/Documents
DECISION NOTICE HISTORY
• Original Decision Notice – 5 May 1993.
• Decision Notice - Minor 51993.559.01 – 8 April 2026 - include additional conditions 22 & 23.
Page 5 of 6
Document Set ID: 24671731
Version: 6, Version Date: 13/04/2026
Page 6
Appeal Rights
PLANNING ACT 2016 & PLANNING REGULATION 2017
Chapter 6 Dispute resolution (3) The appellant or, for an appeal to a tribunal, the registrar must,
within the service period, give a copy of the notice of appeal to –
Part 1 Appeal rights
(a) the respondent for the appeal; and
229 Appeals to tribunal or P&E Court
(b) each co-respondent for the appeal; and
(1) Schedule 1 of the Planning Act 2016 states –
(c) for an appeal about a development application under schedule
(a) Matters that may be appealed to –
1, table 1, item 1 – each principal submitter for the
(i) either a tribunal or the P&E Court; or development application; and
(ii) only a tribunal; or (d) for and appeal about a change application under schedule 1,
table 1, item 2 – each principal submitter for the change
(iii) only the P&E Court; and
application; and
(b) The person-
(e) each person who may elect to become a co-respondent for the
(i) who may appeal a matter (the appellant); and appeal, other than an eligible submitter who is not a principal
submitter in an appeal under paragraph (c) or (d); and
(ii) who is a respondent in an appeal of the matter; and
(f) for an appeal to the P&E Court – the chief executive; and
(iii) who is a co-respondent in an appeal of the matter; and
(g) for an appeal to a tribunal under another Act – any other
(iv) who may elect to be a co-respondent in an appeal of the
person who the registrar considers appropriate.
matter.
(4) The service period is –
(2) An appellant may start an appeal within the appeal period.
(a) if a submitter or advice agency started the appeal in the P&E
(3) The appeal period is –
Court – 2 business days after the appeal has started; or
(a) for an appeal by a building advisory agency – 10 business
(b) otherwise – 10 business days after the appeal is started.
days after a decision notice for the decision is given to the
agency; or (5) A notice of appeal given to a person who may elect to be a co-
respondent must state the effect of subsection (6).
(b) for an appeal against a deemed refusal – at any time after the
deemed refusal happens; or (6) A person elects to be a co-respondent by filing a notice of election,
in the approved form, within 10 business days after the notice of
(c) for an appeal against a decision of the Minister, under chapter
appeal is given to the person.
7, part 4, to register premises or to renew the registration of
premises – 20 business days after a notice us published under 231 Other appeals
section 269(3)(a) or (4); or
(1) Subject to this chapter, schedule 1 and the P&E Court Act, unless
(d) for an appeal against an infrastructure charges notice – 20 the Supreme Court decides a decision or other matter under this
business days after the infrastructure charges notice is given Act is affected by jurisdictional error, the decision or matter is non-
to the person; or appealable.
(e) for an appeal about a deemed approval of a development (2) The Judicial Review Act 1991, part 5 applies to the decision or
application for which a decision notice has not been given – matter to the extent it is affected by jurisdictional error.
30 business days after the applicant gives the deemed
(3) A person who, but for subsection (1) could have made an
approval notice to the assessment manager; or
application under the Judicial Review Act 1991 in relation to the
(f) for any other appeal – 20 business days after a notice of the decision or matter, may apply under part 4 of that Act for a
decision for the matter, including an enforcement notice, is statement of reasons in relation to the decision or matter.
given to the person.
(4) In this section –
Note – decision includes-
See the P&E Court Act for the court’s power to extend the appeal
(a) conduct engaged in for the purpose of making a decision; and
period.
(b) other conduct that relates to the making of a decision; and
(4) Each respondent and co-respondent for an appeal may be heard
in the appeal. (c) the making of a decision or failure to make a decision; and
(5) If an appeal is only about a referral agency’s response, the (d) a purported decision; and
assessment manager may apply to the tribunal or P&E Court to
(e) a deemed refusal.
withdraw from the appeal.
non-appealable, for a decision or matter, means the decision or
(6) To remove any doubt. It is declared that an appeal against an
matter-
infrastructure charges notice must not be about-
(a) is final and conclusive; and
(a) the adopted charge itself; or
(b) may not be challenged, appealed against, reviewed, quashed,
(b) for a decision about an offset or refund-
set aside or called into question in any other way under the
(i) the establishment cost of trunk infrastructure identified in Judicial Review Act 1991 or otherwise, whether by the
a LGIP; or Supreme Court, another court, a tribunal or another entity; and
(ii) the cost of infrastructure decided using the method (c) is not subject to any declaratory, injunctive or other order of
included in the local government’s charges resolution. the Supreme Court, another court, a tribunal or another entity
on any ground.
230 Notice of appeal
232 Rules of the P&E Court
(1) An appellant starts an appeal by lodging, with the registrar of the
tribunal or P&E Court, a notice of appeal that- (1) A person who is appealing to the P&E Court must comply with the
rules of the court that apply to the appeal.
(a) is in the approved form; and
(b) succinctly states the grounds of the appeal. (2) However, the P&E Court may hear and decide an appeal even if
the person has not complied with the rules of the P&E Court
(2) The notice of appeal must be accompanied by the required fee.
Page 6 of 6
Document Set ID: 24671731
Version: 6, Version Date: 13/04/2026
Used in these records
Minor Change Existing Approval 51993 559 01 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 160 KB (small file)
- File type
No other editions are linked here.