Skip to the record
Every meeting, every word.

Council archive · source document

Minor Change Existing Approval 51993 559 01 (As Published) · 51993.559.01

of 6

Text shows just the words. Original shows the document exactly as it was published.

               10.    Payment of contributions in accordance with Council’s Policy on Water Supply and Sewerage
                      Headworks, current at the time of Building Approval. An estimate only of the charges as at
                      April 1993 under the current policy is as follows: -
                      Water Supply - $3043
                      Sewerage - $2226
                      TOTAL:           $5269
                      Please note that the headworks charges will alter in accordance with Price Index variations
                      or if any amendment is made to Council’s Policy.
                      If payment is not proposed to be made prior to the issue of Building Approval, a cash bond
                      or trading bank guarantee for the required amount is to be lodged, prior to the release of the
                      Approval. The contribution is then required to be made within fourteen (14) days of the issue
                      of Building Approval.
               11.    The footpath across both frontages of the site are to be upgraded by the provision of a 1.2
                      metres wide concrete footpath and the forming, grassing and topsoiling of the remaining area
                      to the satisfaction of the Shire Engineer. The footpath is to be generally located 0.9 metres
                      from the property alignment and is to be integrated with any existing slopes and vegetation
                      within the road reserve.
               12.    The developer shall bear the cost of alteration of any public utility or other facilities
                      necessitated by the development of the land or associated construction works external to the
                      site.
               13.    Connection to Council’s existing water supply and sewerage reticulation systems at the
                      developer’s expense to the standard and requirements of the Shire Engineer.
               14.    The developer shall provide a metered water connection from the water supply system to the
                      proposed development, in accordance with Council’s standards and to the satisfaction of the
                      Shire Engineer.
               15.    Roof and surface water is to be collected on site and is to be discharged through a single
                      underground drain line to Bryan Street to the satisfaction of the Shire Engineer. A Building
                      Approval shall not be granted until the Shire Engineer has approved of the drainage scheme.
               16.    Provision of approved refuse containers in accordance with the requirements of the Refuse
                      Management Regulations of 1983 for the storage and collection of refuse to the satisfaction
                      of Council’s Environmental Health Officer.
               17.    Any flat or unit intended to be let out for fee or reward is to be licensed annually with Council’s
                      Health Department in accordance with the provisions of Chapter 43 of Council’s By-Laws
                      prior to such letting.
               18.    The swimming pool shall be licensed annually with the Council’s Health Department in
                      accordance with the provisions of Chapter 42 of Council’s By-Laws.
               19.    Submission of a cash bond or trading bank guarantee to the sum of $4000 to secure
                      performance of conditions, prior to the issue of Building Approval. The cash bond or trading
                      bank guarantee will be returned upon performance of the conditions of approval.
               20.    The provisions of this approval are to be affected, prior to the commencement of the
                      approved use. Council reserves the right to call upon the bond or guaranteed sum referred
                      to in this approval for the purposes of litigation should the use not be conducted in
                      accordance with this approval.
               21.    The Town Planning Consent Permit may be revoked pursuant to Section 4.14 of the Local
                      Government (Planning and Environment) Act if commencement of erection or works have
                      not been made in accordance with that Permit or the rights conferred by that Permit are not
                      exercised within two (2) years of the date of issue of the Permit.




                                                                                                           Page 3 of 6
Document Set ID: 24671731
Version: 6, Version Date: 13/04/2026

Used in these records

About this file

File size
160 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Minor Change Existing Approval 51993 559 01 (As Published).pdf · 160 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.