Original source · versioned page text
1909-13367 SRA referral response approved docs
Attached to the e-mail SARA Referral agency response – with conditions - MCU19/0114 & RAL19/0027.
Very large file (31.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
1 INT RO D UCT IO N Westera Partners Pty Ltd has been commissioned by Gemlife to prepare a Stormwater Management Report for the proposed relocatable home park to be constructed at 122 & 144 Myall St, Cooroy. The new development comprises 245 relocatable dwellings, a shared clubhouse area and associated hardstand and landscaped areas. This report documents how stormwater runoff will be managed on site in accordance with Noosa Shire Council’s (NSC) requirements. 2 SIT E D ES CR I PT IO N 2. 1 Loc at i on an d L an d U se The site of the proposed development is located at 122 & 144 Myall St, Cooroy, with a real property description of Lots 2 & 3 on SP115864. The proposed development area is approximately 107,320m2 and currently is undeveloped. The site is crested in the centre of the site falling generally north and south towards the Cooroy golf course. The average slope of the lot is approximately 6%. The site is bound by Cooroy golf course to the north, east and south. Myall St borders the western boundary. Refer to Figure 1 for the site location. Figure 1 – Indicative Site location (NearMap 2019) Stormwater Management Report 5 S19-007 122 & 144 Myall St, Cooroy
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.