Attached to the e-mail SARA Referral agency response – with conditions - MCU19/0114 & RAL19/0027.
Very large file (31.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Table 1 – Existing site catchment summary
Details
Subcatchment
Catchment 1 Catchment 2 Catchment 3
Area 54,640m2 15,980m2 35,790m2
% impervious 0% 0% 0%
Slope 6.5% 6.5% 6.5%
3.1.1 E xi st i ng H yd rol og y
The XPStorm model has utilised “Laurenson’s” method to calculate the runoff hydrograph for each of
the design events. Below is a brief summary of the parameters used in the model.
Mannings Roughness
The developable site area is vegetated. The developable area is generally well grassed with some small
bushes. A high value for Mannings roughness has therefore been applied. The majority of the
impervious surfaces will be concrete and roof areas and therefore a single impervious roughness has
been applied. The values that have been adopted for Pervious and impervious areas are as follows:
Pervious Area n = 0.045
Impervious Area n = 0.014
Initial and Continuing Losses
The initial loss (IL) and continuing loss (CL) for pervious/undeveloped areas available from
ARRDatahub are shown below.
ARRDataHub IL = 32mm
ARRDataHub CL = 2.6mm/hr
The above values were sourced from ARRDatahub (for coordinates (-26.445, 152.897) on the 20 June,
2019).
The above IL and CL have been deemed too high for the site. The IL and CL that have been adopted
are listed below.
Adopted IL (Pervious) = 15mm
Adopted CL (Pervious) = 2.6mm/hr
Adopted IL (Impervious) = 1.0mm
Adopted CL (Impervious) = 0.0mm/hr
Preburst Depths
Stormwater Management Report 7
S19-007 122 & 144 Myall St, Cooroy
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.