Original source · versioned page text
1909-13367 SRA referral response approved docs
Attached to the e-mail SARA Referral agency response – with conditions - MCU19/0114 & RAL19/0027.
Very large file (31.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
PRELIMINARY
EARTHWORKS SUMMARY
EARTHWORKS
PRELIMINARY EARTHWORKS PLAN
PRELIMINARY
SUNSHINE COAST GOLD COAST SURVEYOR No. DATE REVISIONS
SHEET APPROVED DESIGNED
SHEET NUMBER
Suite 2, Norval Corporate Centre, Level 3
13 Norval Ct, Maroochydore 17 Welch St, Southport
T 0431 803 337
E [email protected]
T 07 5571 1599 F 07 5571 1330
E [email protected] PROJECT DRAWN
PARTNERS BRISBANE NORTHERN NSW USE FIGURED DIMENSIONS ONLY. DO NOT SCALE, IF A DISCREPANCY ARISES CHECK WITH THE
PROJECT ENGINEER AND/OR SUPERVISING AUTHORITY. DO NOT WORK FROM REDUCED SCALE LOCATION DATE DRAWN
REVISION
Level 2 Limestore, 11 Sailfish Way, Kingscliff
33 Longland St, Newstead T 02 6674 8047 F 02 6674 8049
DRAWINGS (A1-A3 SIZE PAPER). COPYRIGHT OF ALL DRAWINGS & WORKS EXECUTED FROM PROJECT NUMBER
THEM IS VESTED IN WESTERA PARTNERS AND USE OF THERE FORE WITHOUT PERMISSION IS
T 07 3852 4333 F 07 3852 4777 E [email protected] STRICTLY PROHIBITED! IT IS THE BUILDERS RESPONSIBILITY TO ENSURE ALL WORKS ARE
www.westerapartners.com.au ABN 52 097 417 975 E [email protected] CARRIED OUT WITH DUE CARE AND DILIGENCE TO COMPLY WITH THE CONTRACT DOCUMENTS. CLIENT For and on behalf of
WESTERA PARTNERS PTY. LTD.
FILE NAME
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.