Table 4 – Time of concentration summary
Time of Concentration Adopted Parameters
Method Used
(Minutes)
Figure 4.5
L = 4640m; Fall = 49m, delta = varies between 2 and 3
t= 145 minutes
Figures 4.5/4.6 QUDM 2017 153
Figure 4.6
L = 50m, n = 0.035
S = 18%, t= 8.0 minutes
Bransby-Williams (Equ 4.9 L = 4.6km; A = 386.98Ha
166
QUDM 2017) Se = 0.562%
The lengths of each catchment used were taken as the longest flow path from the top of the external
catchment to the discharge point at the end of the study area. The lengths and the slopes of the bed
were determined from LIDAR information.
Equal area slope was determined using a longitudinal section of the creek bed.
Using the above times of concentration the rational method was used to calculate an estimate of peak
flow.
Below is a list of the parameters that were used to determine the peak flow of the external catchments
based on the time of concentrations detailed above.
C10 combined = 0.74
I100 2.55hrs = 61.8mm/hr
I100 2.77hrs = 59.2mm/hr
The above parameters have been used to calculate the below peak catchment flows.
1% AEP Peak flow2.55 hours = (1.2 x 0.74 x 0.0618m/hr x 3,869,800m2)/3600 = 58.99m3/s
1% AEP Peak flow2.77 hours = (1.2 x 0.74 x 0.0592m/hr x 3,869,800m 2)/3600 = 56.51m 3/s
The 1% peak flows calculated using the rational method are approximately 0.8% (2.77 hour tc) and
5.3% (2.55 hour tc) greater than the 1% peak flow as determined using the Laurenson’s method. This
difference has been attributed to the runoff routing within Laurensons method combined with the
detention in the 1D channels which the rational method does not consider.
3.1.9 2D M odel lin g p a ra m e t e rs
The external catchment and development site flows have been modelled in 2D to determine the existing
flow conditions, peak water levels, maximum flow velocities and extent of flow widths adjacent to the
development site.
Flood Study 14
S19-007 122 & 144 Myall St, Cooroy
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.