Original source · versioned page text
1909-13367 SRA referral response approved docs
Attached to the e-mail SARA Referral agency response – with conditions - MCU19/0114 & RAL19/0027.
Very large file (31.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
CO NT E NT S
1 Introduction ............................................................................................................................ 5
2 Site Description ..................................................................................................................... 5
2.1 Location and Land Use ............................................................................................................ 5
2.2 Lawful Point of Discharge ........................................................................................................ 6
2.3 External Catchment ................................................................................................................. 6
2.4 Flooding ................................................................................................................................... 6
3 Stormwater Quantity Management ...................................................................................... 6
3.1 Existing Catchment and Site Drainage .................................................................................... 6
3.1.1 Existing Hydrology ................................................................................................................... 7
3.2 Proposed Developed Site Drainage ........................................................................................ 8
3.3 Existing and developed site comparison ................................................................................. 8
3.4 On site Detention (OSD) .......................................................................................................... 9
3.5 Waterway Stability ................................................................................................................. 11
3.6 Critical Storm Durations ......................................................................................................... 12
4 Stormwater Quality Management ....................................................................................... 13
4.1 Operational Phase ................................................................................................................. 13
4.2 Stormwater Quality Treatment solution ................................................................................. 13
4.3 Construction Phase ............................................................................................................... 15
4.3.1 Erosion and Sediment Control ............................................................................................... 15
4.3.2 Maintenance and Monitoring Requirements .......................................................................... 16
5 Conclusion ........................................................................................................................... 18
6 Appendices ..............................................................................................................................
6.1 Appendix AA – Erosion Hazard Assessment ....................................................................... AA
6.2 Appendix AB – MUSIC details .............................................................................................. AB
6.3 Appendix AC – Engineering Drawings ................................................................................. AC
FIG U R E S
Figure 1 – Indicative Site location (NearMap 2019) ..................................................................... 5
Figure 2 - XPSTORM model layout. ............................................................................................. 9
Figure 3 – MUSIC Model & Pollutant load reductions ................................................................ 14
Stormwater Management Report 3
S19-007 122 & 144 Myall St, Cooroy
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.