Council archive · source document
Landscape plan7 Ruby St BLD OW-A · OPW23/0013
Plans and drawings: the text below has words only, no drawings.
Original PDF page 1, section 1. The text section number identifies this passage in the reader.
7 RUBY STREET, COOROY Landscape Plan Package Drawing Schedule · Cultivate subgrade 150mm and re-spread ameliorated stockpiled topsoil to plan proposed 4.0 Planting 5.0 Maintenance Tasks contours and track-in, 300mm deep for gardens and 150mm deep for turf areas. · Clear and remove all non-organic, deleterious and large organic matter such as rocks greater New Gardens · Maintain whole of landscape works for establishment period of 13 weeks and streetscape LD1 Drawing Schedule, Specifications than 40mmØ, tree roots, trunks, limbs, and stumps from all areas to be landscaped. · See 1.0 Topsoil for cultivation and topsoil requirements. works for an additional 39 weeks. LD2 Finishes and Planting Schedules · Ensure smooth, flowing, even grades and positive drainage with no ponding to fall · Spread ameliorated site topsoil or MRTS-16 imported organic topsoil to a depth of 300mm Irrigation and Watering percentages shown on plan, 3% (minimum 2%). Finish grades shall blend into existing grades over prepared garden areas and trim. · Every day for the first two weeks (unless it rains adequately) LD3 Details providing a natural appearance with no abrupt edges. · Crown garden beds 100mm H at centres to drain positively. · Every 2-3 days during the balance of the establishment period or as needed if hot and dry LP1 Planting Plan · Ensure 2% minimum slope away from all structures to pits or swales. · Mulch gardens with LA approved A.S. 4454 imported organic mulch as specified 100mm deep (unless it rains adequately) · Trim topsoils for gardens and turfing. settled. Leave 20mm between top of mowing edge and planting area mulching. If mulched · Once a week there after (unless it rains adequately) areas are >1:4 sloped, install open weave pinned jute net over mulch once settled. Mowing 2.0 Landscape Construction · All supplied topsoil and mulch to comply with current A.S. and free of weeds, seeds · First Mow - Once after 10 days if there is rapid growth or 14 days after installation. Landscape Specifications (specifically Nutsedge), pests including fire ants and soil borne viruses and diseases. · Mowing Thereafter - Once a week during summer, once every two weeks in spring and Levels autumn, and once a month in winter or as required if there is a lot of growth or as desired. These landscape plans must be read in conjunction with the appropriate statutory approvals and · See plan for engineer's plan levels and proposed levels. Tree Planting Weed Removal: As required to reduce competition and seeding. Australian Standards and with the Operational Works Landscaping Decision Notice once issued. · Verify all levels, conditions, and utility locations in-the-field including all inverts. If a · Refer to street tree and tree planting details (as applicable) for information. Plant Replacement: Immediately replace plants that die or fail to thrive, are damaged or stolen, These plans have been developed to comply with the current Council Planning Scheme, discrepancy occurs notify superintendent and/or LA. · All trees to be certified to A.S. 2303:2018 'Tree stock for landscape use' and comply with this with plants of the same species and of similar size and quality unless otherwise specified. Landscape Code. · Levels to be confirmed by a qualified/licensed surveyor. See plans for level sources. specification. Stakes and Guys: Adjust and/or replace stakes and ties where required. Remove staking and · Grade evenly between prescribed levels and finish surface levels ensuring positive drainage · Landscape contractor to peg street tree positions for approval by superintendent before guying when instructed by the superintendent. 1.0 General Notes and no ponding areas. excavation. Re-mulching: As required to maintain a consistent depth, 100mm settled, until plants are · Except where indicated or specified (i.e. allowing for mulching and sheet flow over settled · All trees to have a full and even crown. established or Off-maintenance respectively. Abbreviations turf), finish surface levels are to be flush with adjacent surfaces and graded evenly between · Install trees at locations indicated on the plans, per notes and details herein. Monitoring: Provide a monthly report on completed tasks. · NC - Noosa Council · A.S. - Australian Standards design and finish levels. · Mulch tree gardens with minimum 1800mmØ collar of AS4454 organic mulch as specified · DBH - Diameter at breast height (1.4m) · Co-ordinate establishment of levels with superintendent. 100mm deep settled. Do not mulch within 50mm of trunk / plant stem. Warranties · DTMR - Department of Transport and Main Roads · E.P. - Establishment Period · Edge trees per details. · Warranties or guarantees specified shall name the Owner as warrantee. Register with · H.D. - Hot Dipped · LA - Landscape Architect · KJ - key joint Drainage · Install street tree drainage per detail if required by civil engineer or tree pits do not drain after manufacturers as necessary. Retain copies delivered with and components and equipment to · N/A - Not applicable · O.C. - On centre · MP - Maintenance Period · All damaged stormwater pipes are replaced and relocated as necessary. they are tested for drainage by filling with water prior to planting and backfilling. Landscape the Owner. · MRTS - Main Roads Technical Standard · m² - square metre · Ensure site drainage can occur positively to whole of site, minimum 2% away from any contractor to furnish tree pit drainage rate per tree. · Warranties and/or guarantees to be submitted to the Superintendent to deliver to Owner within · m³ - cubic metre · NATA - National Association of Testing Authorities buildings and where paths, edges, and gardens etc. may impede drainage; refer to LA before · Install street tree root barrier as specified. Landscape contractor to furnish rate per tree. fourteen (14) days after practical completion. · typ. - Typical · uPVC- Unplasticised Polyvinyl Chloride continuing works. · Tree staking - per details. · Commence Warranty periods at practical completion or at acceptance of installation, if · S - Spread · VPZ - Vegetation Protection Zone · Drainage works to correlate with and not disturb adjacent land. · All trees to be located minimum; acceptance is not concurrent with practical completion. · See legend for plan symbols and plans for locations. - 1000mm from back of kerb (or in-between kerb and footpath where applicable (allowing · If installation is not by manufacturer and product warranty is conditional on the manufacturer's Preliminaries · Landscape field pits to be 300mm x 300mm x 450mm 'Polycrete' pits with hot dipped for service setbacks) or as dimensioned on plans, from underground services (confirm approval of the installer, submit the manufacturer's written approval of the installing firm. · These plans are not for tender or construction. galvanised surface grate/lid (non-heel slip grates in paved areas). Determine requirements locations on-site prior to pit excavation) · Refer to plans by others for all services locations, footpath works, levels (other than those on-site in addition to those on plans. - 1500mm from concrete paths, horizontally and vertically from sewer lines, and property Deliverables indicated on these plans) and boundaries. All services and related infrastructure including · All drainage pits and subsurface drains to be connected to existing stormwater drainage connections · Warranties street lighting shown on these plans are indicative only. system. Refer engineer's drawings for drains and hydraulic services. - 2m from driveway crossovers, stormwater catch pits · Irrigation System As-built plans in .dwg and PDF formats · Call 'Dial Before You Dig 11 00' prior to any excavation. · Stormwater drainage to be 100mmØ minimum uPVC drainage pipe. - 3m from fire hydrants · Before work commences the subcontractor is to organise a pre-start meeting with the LA to · Subsurface drainage to be 100mm minimum Ag-flow pipe centred in 300mm x 300mm gravel - 4m from overhead street lighting Certifications establish scope of works management procedures and clarify any issues. trench. Gravel to be 8-20mmØ No-fines aggregates surrounded by LA approved permeable - 6m from power poles Furnish LA with the following certifications prior to Practical Completion: · Install tree protection measures as per plans and detail. bidim or geotextile fabric. · AS 2303:2015 Tree Stock for Landscape Use · Prior to commencing construction works, verify dimensions, levels and location of site · Where and if additional drainage is required the following applies: General Planting · MRTS 16 Topsoil services, refer engineer's drawings generally. - Allow for seepage interception sub-surface drainage where paths and landscape works · Refer to detail(s) herein respectively. · AS4454 Mulch · Dimensions take precedence over scale. impede drainage (to be coordinated on site). · Supply and place plants according to plant schedule, plant setout notes and plan locations. · Turf - Allow for 300mm x 300mm gravel trench with socked Ag-line under path, discharge to · Where discrepancies occur advise superintendent prior to planting. Erosion and Sediment Control natural drainage lines. · Ensure plants are placed and planted at equal centres, staggered, not in rows unless indicated Sources · The landscape contractor to implement and maintain for the contract duration, best practice - Allow for 300mm x 300mm lateral collection trenches extending nominal 1m either side on plans. · Survey: Murray Associates, Axis erosion and sediment control measures in accordance with the manual for erosion and of low point. · Mass and group plantings to be spaced evenly in a triangular pattern in odd numbered groups · Architecture: Ausmar sediment control (Maroon Manual), good environmental practice and the consulting civil to achieve optimum cover related to mature plant size and form. · Civil Engineering: Ingeniir engineer's specification for erosion and sediment control. Penalties and fines for Edging · Shrubs and spreading groundcovers to be set back a minimum 800mm from roads, kerbs, non-compliance will apply. · Supply, install, and maintain edges as specified and shown on the plans and details and garden edges and paths to allow for mature plant form. Confirm with LA which require more · Install silt control fencing in accordance with site environmental management plan and local Finishes Schedule, specifically where new gardens are located adjacent to new turf areas. Tie distance. authority regulations. off edge ends perpendicularly to paths, kerbs, and path joints wherever possible. · All plants must be planted using one 'Agriform' 10g fertiliser tablet (N.P.K. 20-4.3-4.1) at a rate · Sediment and erosion control devices to be installed where necessary and as directed on site of 1/140mm, 2/200mm, 3/300, 4/45 litre and above pot sizes, and one 5g tablet for tubestock. by superintendent. 3.0 Irrigation Use phosphorous free tablets for Banksias, Grevilleas, and Callistemons. · All sediment and erosion control devices are to be installed in accordance with manufacturer's · Excavate plant pit, cultivate subgrade to 150mm and scarify plant pit walls. specifications. Preliminaries · Fill plant pit with water, allow to drain before planting. If pit does not drain within 24 hours, · The contractor is responsible for ensuring sediment and erosion control devices are inspected · Liaise with relevant NC authorities and obtain any approval as required. notify superintendent and correct drainage. and maintained as follows; · Comply with government standards and co-ordinate with other trades. · Soak plants thoroughly before removing from container. a) During construction: Daily during dry weather, prior to predicted storm events, twice · Check locations of penetration/conduits and install where required. · Remove plants from containers / bags / tubes carefully and inspect rootball, remove old matted daily during prolonged rain · Contractor to provide qualifications and insurances before construction. and coiled roots to expose young roots. All stock to be free of structural defects above and b) During establishment period: Weekly during dry weather, prior to predicted storm below soil line (i.e. no girdled roots). events, twice weekly during prolonged rain Provide: · Do not mix soil from hole with mulch and do not compact plant pit. · All stockpiles are to be protected with suitable erosion control devices and graded to ensure · Supply and install a new: Automatic electronic controller with a lockable stainless steel case, · Install fertiliser tablet(s), install plant, backfill plant with ameliorated site topsoil or imported control of runoff. rain sensor, backflow preventer per NC standards with isolation valves, pressure regulator(s) MRTS 16 topsoil. · Coordinate installation of sediment and erosion control devices with civil contractor to ensure as required, Irritrol System control valves for drip, check valves, black plastic valve boxes, · Water plant in well and maintain soil moisture levels through E.P. compatibility and consistency in control measures. looped mainline, thrust blocks (as required), fittings, and drip lines and emitters for garden and · All exposed surfaces, once completed shall be immediately stabilised to prevent erosion. sprinklers for turf areas (i.e. overhead spray - sprinklers / rotors shall be Hunter or LA New Turfed Areas approved equal). · See 1.0 Topsoil for cultivation and topsoil requirements. Site Works · Turf area irrigation to have head to head coverage and no overspray onto hard surfaces. · Trim topsoil, fill depressions and provide even falls as indicated on drawings. · Remove all unwanted material, deleterious and operational debris from site. Check head radius once per month to ensure spray head layout provides head to head · Finished turf grades/contours shall be smooth and undulating, free from deleterious materials, · If provided levels are not functional refer to the site superintendent and/or LA. coverage. debris, large clods of soil, stones, and organic matter, positive flowing minimum 2% slopes and · Civil engineering designs have provided a positively drained site. If there are drainage issues · Install uPVC conduits, 2xØ of pipe used, under all hard surfaces prior to hard surface no water holding areas. Co-ordinate on-site with LA and ensure levels are approved prior to refer site superintendent. construction. Extend ends of conduits 300mm beyond surfaces, cap (do not glue caps to laying turf. Where turf meets hard edges, adjust finish topsoil levels to allow stormwater to flow · Refer to 2.0 Landscape Construction - Drainage for more information. conduits) and install used survey pegs at ends for reference. unimpeded over laid turf to low area respectively. · All valve boxes to be located in gardens (not in turf or swales) 300mm from and perpendicular · Supply and lay 'A' grade turf per plans and schedules. Conduits to surfaces . · Where turf is installed on slopes >20% pin turf to industry standards. Remove pins once turf is · Furnish and install 2 - 150mmØ solid uPVC piping perpendicularly under all footpaths that · All mainlines to have 450mm of topsoil cover and 300mm for lateral lines. well established. bisect landscape areas for irrigation and landscape drainage purposes. Extend ends 300mm · Align all mainlines and lateral lines 1m from all trees and in close approximation to new paths · Water turf in well and apply water to maintain soil moisture until established. beyond paths, each side and cap (do not glue caps). Mark and install a recycled surveyor's / hard surfaces as possible. pegs for identification. · Do not irrigate road reserve areas. · For practical completion ensure whole system is operational. Topsoil - Harvesting, Stockpiling, Amelioration Re-use and Spreading · Irrigate plants and turf ensuring adequate plant moisture is maintained during establishment. · If practical harvest and stockpiled site topsoils then reinstall per the following specifications in · Adjust system post establishment so it operates during dry and hot periods so plants and turf respective landscaping areas. areas are adequately watered to maintain healthy and vibrant conditions. · Stockpiled topsoil shall not be in any preserved vegetation areas or within three metres of · Contractor to provide a twelve month guarantee, maintain against faulty workmanship and preserved vegetation driplines. materials for system from date of practical completion. · Topsoil stockpiling shall occur in an area adjacent to the stripped area(s) or area by engineer · Provide CAD 'As-built' drawing and PDF of same to Owner and a laminated copy in the or owner which will not hinder visibility for inspection of the work. controller door for reference when applying for practical completion clearly showing main-line · Stockpile topsoil to ensure no ponding of water and positive drainage. runs and sizes, valve types / station numbers / valve design pressure, head types and · Install erosion control measures per engineer and above for stockpiled topsoil. locations. · Landscape contractor to conduct soils analyses tests to stockpiled topsoils. Furnish LA with results. Ameliorate site topsoils per recommendations prior to re-spreading. Landscape contractor to allow for pH balancing and nutrient ameliorations. All soil testing to be conducted by a NATA accredited lab. · Should amended site topsoils be insufficient in quantity, contractor to import MRTS-16 topsoil (greater standard than AS4419 ) and spread to proposed plan finish levels. Prior to spreading, imported topsoils shall have soils analyses test as per above. Amend Imported soils per test results prior to spreading. NOTES: This plan is Copyrighted © by Bird Landscape Design (Brian Bird - AILA RLA #1736). Landscape Operational Works Package Project: BIRD LANDSCAPE DESIGN Any reproduction or unauthorized use without written consent from Job No: 2276 Proposed Duplexes Landscape Architecture, Urban Design, Land Planning Bird Landscape Design is strictly prohibited. 7 Ruby Street, Cooroy, QLD 3 Vector Place, Little Mountain, QLD 4551 Australia Do not scale from PDF plans. M: +614 7705 5222 LD1 Drawing Schedule, Specifications E: [email protected] 09.08.22 A For Application BB BB Sheet Title Sheet 1 of 4 Client: Robyn Kildey W: birdgolfdesign.com DATE ISSUE DESCRIPTION DRAWN CKD
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 4 sections
Section 2
Finishes Schedule Planting Schedule
Code Item Product / Description Specifications, Size, Finish, Colour Dealer, Manufacturer Code GENUS species - Common Name Size Quantity SC6.3.4.1-3 species, Native, Notes
Hardscape Trees
STE Garden Edge Galvanised Garden Edging 'FormBoss' 'Redcor', 150mm H x 2mm gauge including tapered 300mm stakes. Install per manufacturer's Formboss, local representative: ACA fim ACACIA fimbriata - Brisbane Wattle 25 L 1 SC6.3.4.2
specifications. Tranquil Building and
Landscapes BAE fru BAECKEA frutescens - Weeping Baeckea 25 L 1 RE 12.9-10.1
07 5497 8774
ELA eum ELAEOCARPUS eumundii - Eumundi Quandong 25 L 1 SC6.3.4.3, 3.5mØ
Garden Steppers Concrete Garden Steppers Size: 400mm x 600mm x 40mm H Nominated by contractor and
Colour: To match primary architectural colour approved by superintendent ELA whi ELAEOCARPUS reticulatus - Blueberry Ash (White) 25 L 1 SC6.3.4.1, 6mØ
Finish: Set level over 95% compacted subgrade, flush to finish grades with adjacent gravel surfaces 10mm lower.
Shrubs
Softscape
ALP cae ALPINIA caerula - Native Ginger 140mm 30 SC6.3.4.2-3
Topsoil Ameliorated site topsoil as per soil testing results or Excavate gardenbed areas 300mm deep and turf areas 150mm deep into existing ground. Cultivate subgrade 150mm. Nominated by contractor and
import MRTS 16 topsoil for garden bed and new turf Backfill turf areas 150mm deep and garden areas 300mm - mounding in center with ameliorated site topsoil or MRTS approved by superintendent. BAC myr BACKHOUSIA myrtifolia - Grey Myrtle 200mm 4 SC6.3.4.2-3
areas. Provide soil testing results for topsoil and 16 topsoil. Refer to details. MRTS-16 Toposil available from;
certification to landscape architect. Hortus Group - contact BAN lit BANKSIA ericifolia 'Little Eric' 140mm 10 Native
Aaron Ashlin 0448 007 350
BLE car BLECHNUM cartilagineum - Gristle Fern 200mm 22 SC6.3.4.1
Gravel Mulch Gravel mulch with pavers and around pits Install Ø40-70mm decorative gravel mulch, 150mm deep presenting 100% cover over pinned geo-fabric. Mulch colour Nominated by contractor and
to match secondary architectural colour and kept 50mm away from plant stems. approved by superintendent COR rub CORDYLINE 'Rubra' 200mm 37 SC6.3.4.2-3
SYZ hin SYZYGIUM australe 'Hinterland Gold' 200mm 28 Native
Organic Mulch Mulched Gardens Install 100mm deep settled, 25mm+Ø Hoop Pine organic mulch to all gardens keeping mulch 50mm clear of plant Nominated by contractor and
stems. On batters steeper than 1:4, install pinned open weave jute netting over mulch. approved by superintendent Groundcovers
AUS dul AUSTROMYRTUS dulcis - Midyim 140mm 23 SC6.3.4.1-2
Turf Turf Refer to Plant Schedule and Detail Nominated by contractor and
approved by superintendent BLE ind BLECHNUM indicum - Bungwahl 140mm 39 SC6.3.4.3, 400mm O.C.
CIS ant CISSUS antarctica - Kangaroo Vine 140mm 27 SC6.3.4.2-3
LOM ver LOMANDRA 'Verday' 140mm 24 Native
TURF ZOYSIA 'Empire' Rolls
'A' Grade, healthy, weed and pest free
Note: The site's Queensland Government Vegetation Management Pre-clear Regional Ecosystems (REs) are; REs 12.0-10.1, 12.9-10.16
NOTES:
This plan is Copyrighted © by Bird Landscape Design (Brian Bird - AILA RLA #1736).
Landscape Operational Works Package Project: BIRD LANDSCAPE DESIGN
Any reproduction or unauthorized use without written consent from Job No: 2276 Proposed Duplexes Landscape Architecture, Urban Design, Land Planning
Bird Landscape Design is strictly prohibited. 7 Ruby Street, Cooroy, QLD 3 Vector Place, Little Mountain, QLD 4551 Australia
Do not scale from PDF plans. M: +614 7705 5222
LD2 Finishes and Planting Schedules E: [email protected]
09.08.22 A For Application BB BB
Sheet Title Sheet 2 of 4 Client: Robyn Kildey W: birdgolfdesign.com
DATE ISSUE DESCRIPTION DRAWN CKD
Section 3
Determining the Radius of the TPZ (Tree Protection Zone)
· DBH (Diameter at Breast Height) - nominal trunk diameter at 1.4m above ground level
· TPZ should not be less than 2m nor greater than 15m (except where crown protection is required)
· TPZ = DBH X 12
· TPZ of palms, other monocots, cycads and tree ferns should not be less than 1m
· Variations and encroachments to the TPZ in accordance with AS 4970-2009.
Fluorescent orange 5.5k.g
barrier fencing mesh secured
/ tied 100mm below top of star Plant pit 2x width of respective pot. 2x pot Ø
Measurement Shrub / groundcover / tufty
pickets at 300mm centres Scarify all pit walls and bottom, typ.
taken for DBH grass plant species per plan
Yellow plastic capped Pot Ø
Fencing
star pickets
painted yellow Backfill plant pit with specified 100mm deep and settled organic
Vegetation to 1200mm
1.4m
topsoil, avoid compaction, typ. mulch as specified, keep minimum
be protected
50mm from plant stem. Form shallow
Ground line dish drain to base of plant, typ.
Crown DBH Garden topsoil as specified,
600mm
TPZ avoid compaction, typ.
NOTES:
100mm, typ.
· Protective fencing to be installed around the TPZ to the commencement of any site works.
· Protective fencing identifying the TPZ, to be visibly signed within the development site. Lettering to comply with AS1319. Slow release fertiliser as specified.
· Fence posts and supports to have a diameter greater than 20mm, located clear of roots 2x rootball depth, typ. Use phosphorus free tablets for
· Where tree protection fencing cannot be installed, trunk, branch and ground protection as specified by the project Banksia, Callistemon and Grevillea
Arborist in accordance with AS4970-2009 species.
· Within TPZ, mulch to a depth of 50-100mm only for disturbed land 150mm deep cultivated
150mm, typ.
· Maintenance of TPZ includes regular monitoring of soil moisture levels and weed removal by hand and controlled by subgrade, typ.
appropriate use of herbicide
· TPZs to be monitored, inspected and certified by the project Arborist Existing subgrade, typ.
· Removal of tree protection measures at practical completion or as indicated by the project Arborist.
1 Tree and Vegetation Protection Detail N.T.S. 4 Potted Shrub, Groundcover Planting
LD3 Typical Detail LD3 Typical Section Detail N.T.S.
NOTES:
Ensure crown of rootball level is set higher than adjacent finished ground levels to prevent excessive ponding around rootball.
When footpath is adjacent to street tree install root barrier to footpath side of plant pit as per notes above.
1800
Full and even crown, typical
2 - 50mm x 50mm x 2400mm F14 hardwood
centrally pointed non-treated stakes to be
driven vertically into ground outside of the
50mm wide hessian tree ties rootball and shall have a finished height lower
wrapped loosely around trunk, than the tree's lower lateral limbs
then a figure 8 and secured to
stake with galvanised nails or Form shallow saucer shaped depression 600mm
staples. Position tree tie between typical
around base of plant and keep mulch 50mm
1/3 to 1/2 overall height of tree.
from trunk base
100mm deep organic mulch as specified.
Mound mulch at edge of plant pit to collect
water to fall down edges of plant pit. Varies,
refer
Turf as specified Turf as specified Plans
150mm Topsoil as specified
Metal Edging as specified
Tree pit to be excavated to nominal depth of
600mm. Backfill hole with 100% friable
Slow release fertilizer ameliorated site topsoil firming progressively.
100mm mulch as specified as specified All excavated fill to be removed off site. Scarify
Tapered Edging Stake as specified all sides of plant pit, typical.
300mm Topsoil as specified
100mm deep uniform gravel layer. Provide
150mm cultivated subgrade, typ.
clean connection to road drainage as advised
Existing subgrade on site by civil engineer. Road Back of kerb or hardstand Turf Roll, typical
2 Metal Garden Edge N.T.S. 3 Tree Planting - in Garden or Turf 1:30 5 Turfing
LD3 Typical Detail LD3 Typical Section LD3 Typical Plan Detail N.T.S.
NOTES:
This plan is Copyrighted © by Bird Landscape Design (Brian Bird - AILA RLA #1736).
Landscape Operational Works Package Project: BIRD LANDSCAPE DESIGN
Any reproduction or unauthorized use without written consent from Job No: 2276 Proposed Duplexes Landscape Architecture, Urban Design, Land Planning
Bird Landscape Design is strictly prohibited. 7 Ruby Street, Cooroy, QLD 3 Vector Place, Little Mountain, QLD 4551 Australia
Do not scale from PDF plans. M: +614 7705 5222
All dimensions in millimetres unless noted otherwise.
LD3 Details E: [email protected]
09.08.22 A For Application BB BB
Sheet Title Sheet 3 of 4 Client: Robyn Kildey W: birdgolfdesign.com
DATE ISSUE DESCRIPTION DRAWN CKD
Section 4
W
W
9 BLE ind 5 COR rub
W
106.13
106.26
12 BLE ind 9 LOM ver 5 COR rub 2 COR rub 1 SYZ hin 3 SYZ hin 1 BAC myr
106.55
//
1
//
06
//
PP 8
.35
//
//
10
106.25
//
6
W
S
.2
//
106.39
//
106.60
STE STE STE
E(
OH
STE STE STE
STE
)
STE
E
ST
STE
SW SW
SW SW SW SW SW SW SW SW SW
SW SW SW SW SW SW SW SW SW SW SW
SW SW SW SW
SW SW SW SW
SW SW SW SW
SW SW SW SW
SW SW SW SW SW
E(
SW SW SW SW
W
SW SW SW SW
SW
S
SW SW SW SW
SW SW SW SW
SW SW SW SW
SW SW SW
STE
SW SW
OH
STE
STE
)
STE
11 AUS dul
STE
8 COR rub
E(
1 ELA eum
OH
STE
STE
)
STE
Do not plant if
STE
Overhead Power-
E(
STE
OH
W
S
STE
)
line is not put
underground at 1 ACA fim
STE
E(
STE
OH
STE
)
southwest property
STE
2 ALP cae
STE
corner
E(
STE
OH
5 BAN lit
STE
)
11 BLE car
W
S
STE
H
E(
OH
STE
STE
Ruby Street
15 CIS ant
)
SW
6 SYZ hin
STE
E(
SW
OH
STE
)
W
S
STE
SW
E(
Opal Lane
OH
SW 5 ALP cae STE STE STE
)
STE
SW 8 ALP cae
SW
E(
OH
)
8 ALP cae
STE
5 ALP cae
W
S
E(
STE STE STE
OH
)
STE
STE
E(
OH
STE
)
STE
STE
E(
W
12 CIS ant
S
OH
)
STE
STE
STE
12 AUS dul
E(
STE
OH
STE
O
)
STE
STE
6 SYZ hin
rn
STE
a
E(
SW SW SW SW SW SW SW SW SW
OH
SW
STE
W
S
SW
)
W
SW
SW
STE
SW
SW
STE
SW
STE
SW
STE
SW
2 ALP cae
STE
SW
SW
STE
SW
1 ELA ret
SW
11 BLE car 1 BAE fru
SW
STE
SW
SW
SW
ST
STE
SW
W
S
E
SW
STE
SW
SW
STE
5 BAN lit
SW
STE
SW
STE
SW
STE
STE
SW
STE
SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW
STE
ST
STE
E
STE
STE
STE
STE STE STE
STE STE
W
10
S
6.5
106.24
106.38
8
107.04
10
6.
50
S
W
7 COR rub 4 COR rub 2 COR rub 18 BLE ind 2 SYZ hin 3 COR rub 3 BAC myr
15 LOM ver 7 SYZ hin 1 SYZ hin 2 SYZ hin
1 COR rub
W
Scale in metres
W
0 1 2 5 10
W
Planting Plan Legend Detail
Overhead Electric Service 1 Tree Protection Fencing 1
4
OH
Refer to plans by others to confirm locations and FT Refer to Specifications, Detail Section 5
LD3
Groundcovers
locate on-site prior to commencing works Refer to Specifications, Plant Schedule, Detail LD3
Garden Steppers
Sewer Service Refer to Specifications and Finishes Schedule Turf 5
S Refer to plans by others to confirm locations and Refer to Specifications, Plant Schedule, Detail LD3
locate on-site prior to commencing works
Gravel Mulch
Telecom Service Refer to Specifications, Finishes Schedule, Details
T Refer to plans by others to confirm locations and
locate on-site prior to commencing works
Steel Garden Edge 2
E
Water Service ST Refer to Specifications, Detail LD3
W Refer to plans by others to confirm locations and
locate on-site prior to commencing works
Trees 3 BUILDER NOTE
Stormwater Refer to Specifications, Plant Schedule, Detail(s) Builder to review services plans by others to ensure that
LD3 none are aligned and / or installed within 1m of proposed
SW
Refer to plans, confirm existing locations and trees during construction.
locate on-site prior to commencing works
Shrubs 4 PLAN NOTES:
See Sheet LD2 for Schedules
Existing Vegetation to Remain 1 Refer to Specifications, Plant Schedule, Detail LD3
Refer to Detail
LD3
NOT FOR TENDER OR CONSTRUCTION
WARNING Scale:
1:100 @ A1 NOTES:
This plan is Copyrighted © by Bird Landscape Design (Brian Bird - AILA RLA #1736).
Landscape Operational Works Package Project: BIRD LANDSCAPE DESIGN
1:200 @ A3
The locations of existing and proposed Telstra, telcoms, NBN,
electricity, sewerage, gas (if any), water and stormwater pipes Any reproduction or unauthorized use without written consent from Job No: 2276 Proposed Duplexes Landscape Architecture, Urban Design, Land Planning
have not been furnished and are unknown. Prior to and during Bird Landscape Design is strictly prohibited. 7 Ruby Street, Cooroy, QLD 3 Vector Place, Little Mountain, QLD 4551 Australia
construction obtain the location of all services (underground Do not scale from PDF plans. M: +614 7705 5222
and overhead) from the responsible authority and designer All dimensions in millimetres unless noted otherwise.
LP1 Planting Plan E: [email protected]
09.08.22 A For Application BB BB responsible for the service shown. Adjust landscape design
Sheet Title Sheet 4 of 4 Client: Robyn Kildey W: birdgolfdesign.com
DATE ISSUE DESCRIPTION DRAWN CKD as required to accommodate all services. North
Used in these records
Landscape plan7 Ruby St BLD OW-A.pdfRelated documentApplication case desk ↗
Appendix F - Landscape Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.4 MB (small file)
- File type
No other editions are linked here.