Skip to the record
Noosa’s premier civic archive.

Council archive · source document

Approved Plan - OPW22-0204 · OPW22/0204

of 1

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     EXISTING LEGEND
                                                                                                                                                                                      GENERAL NOTES:                                                                                                      DRIVEWAY NOTES:                                                                                                                                                   NOOSA COUNCIL                                                                                        PROPERTY BOUNDARY
                                                                                                                                                                                      1.   DRAWINGS TO BE READ IN CONJUNCTION WITH ALL RELEVANT DOCUMENTATION, LOCAL AUTHORITY                                                                                                                                                                                                                                                                                                   MAJOR CONTOUR
                                                                                                                                                                                           SPECIFICATIONS (OR ARCOS GROUP SPECIFICATIONS IF SUPPLIED). ANY POINT OF CONFLICT IS TO BE
                                                                                                                                                                                           IDENTIFIED BY THE CONTRACTOR AN WILL BE RESOLVED BY THE SUPERINTENDENT.
                                                                                                                                                                                                                                                                                                          1.
                                                                                                                                                                                                                                                                                                          2.
                                                                                                                                                                                                                                                                                                                LEVELS SHOWN ARE FINISHED SURFACE LEVELS INCLUSIVE OF TOPSOIL LAYER OR BUILDING SLAB THICKNESS.
                                                                                                                                                                                                                                                                                                                FINISHED SURFACES TO ALL DISTURBED AREAS ARE TO BE TREATED IN ACCORDANCE WITH LANDSCAPE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                            APPROVED PLAN                                                                                        MINOR CONTOUR
                                                                                                                                                                                                                                                                                                                DRAWINGS AND/OR TYPICAL SECTIONS.                                                                                                                                                                                                                                SEWER MAIN
                                                                                                                                                                                      2.   DIMENSIONS IN METRES (U.N.O). DO NOT SCALE FROM DRAWINGS. USE PRINTED DIMENSIONS ONLY AND IF IN
                                                                                                                                                                                           DOUBT ASK SUPERINTENDENT FOR CLARIFICATION.                                                                    3.    CONTRACTOR TO OBTAIN ROADWORKS AND FOOTPATH PERMITS FOR ANY PROPOSED WORKS EXTERNAL TO                                                                   OPW22/0204 17 OCT 2022                                                                                  WATER MAIN
                                                                                                                                                                                      3.   ALL WORKS TO BE CONSTRUCTED IN ACCORDANCE WITH COUNCIL APPROVAL CONDITIONS, DEVELOPMENT                              THE SITE BOUNDARY.                                                                                                                                                                                                                                               U/G TELECOMMS
                                                                                                                                                                                           GUIDELINES, ASSOCIATED STANDARD DRAWINGS AND SPECIFICATIONS U.N.O.                                                                                                                                                                                                                                                                                                                    O/H ELECTRICITY
                                                                                                                                                                                      4.   EXISTING SERVICES AND STRUCTURES HAVE BEEN PLOTTED FROM SUPPLIED DATA AND AS SUCH THEIR                                                                                                                                                                                                                                                                                               STORMWATER
                                                                                                                                                                                           ACCURACY CANNOT BE GUARANTEED. IT IS THE CONTRACTORS RESPONSIBILITY TO ESTABLISH THE LOCATION                  STORMWATER DRAINAGE NOTES:
                                                                                                                                                                                           AND LEVEL OF ALL EXITING SERVICES PRIOR TO COMMENCEMENT OF ANY WORK. DISCREPANCIES SHALL BE                                                                                                                                                                                                                                                                                           FENCE
                                                                                                                                                                                                                                                                                                          1.    ALL STORMWATER DRAINAGE HAS BEEN DESIGNED AND IS TO BE CONSTRUCTED IN ACCORDANCE
                                                                                                                                                                                           REPORTED TO THE SUPERINTENDENT.                                                                                      WITH AS3500, LOCAL COUNCIL AUTHORITY REQUIREMENTS, IPWEA AND QUDM.
                                                                                                                                                                                      5.   ON COMPLETION OF SERVICES INSTALLATION, ALL AREAS SHALL BE RESTORED TO ORIGINAL LEVEL, INCLUDING               2.    ALL GRATES & MANHOLE COVERS LOCATED WITHIN ROADWAY TO BE SOLID DUCTILE CAST IRON CLASS
                                                                                                                                                                                           KERBS, FOOTPATHS, CONCRETE AREAS, GRAVEL AREAS, GRASSED AREAS AND ROAD PAVEMENTS.                                    'D' IN ACCORDANCE WITH IPWEA STD DRG DS-019.
                                                                                                                                                                                      6.   THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR OF ANY DAMAGE TO COUNCILS INFRASTRUCTURE.                       3.    THE CONTRACTOR IS TO CONSIDER CONSTRUCTION LOADING ON EXISTING AND NEW STORMWATER
                                                                                                                                                                                           SUCH REPAIR OR REINSTATEMENT TO BE CARRIED OUT IMMEDIATELY TO THE SATISFACTION OF LOCAL                              PIPES AND STRUCTURES.
                                                                                                                                                                                           COUNCIL.
                                                                                                                                                                                                                                                                                                          4.    ALL PIPE PENETRATIONS WILL BE NEATLY MORTARED ON THE INSIDE FACE OF MANHOLES/PITS.                                                                                                                                                                   PROPOSED LEGEND
                                                                                                                                                                                      7.   THE CONTRACTOR SHALL PROVIDE ALL MANAGEMENT PLANS, INCLUDING TRAFFIC MANAGEMENT PLAN,
                                                                                                                                                                                           ENVIRONMENTAL MANAGEMENT PLAN AND WORKPLACE HEALTH AND SAFETY PLAN FOR REVIEW AND                              5.    THE CONTRACTOR SHALL DEMONSTRATE NO DAMAGE TO EXISTING STORMWATER INFRASTRUCTURE                                                                                                                                                                                 CONCRETE DRIVEWAY CROSSOVER
                                                                                                                                                                                           APPROVAL OF PRINCIPAL AND SUPERINTENDENT, PRIOR TO CONSTRUCTION.                                                     HAS OCCURRED DURING THE CONSTRUCTION OF THESE WORKS.
                                                                                                                                                                                      8.   ALL MATERIALS SPECIFIED ARE TO BE UTILISED, UNLESS WRITTEN APPROVAL FROM THE SUPERINTENDENT,                   6.    UPON COMPLETION, ALL STORMWATER DRAINAGE INFRASTRUCTURE WILL BE CLEAR OF DEBRIS AND                                                                                                                                                                              CONCRETE DRIVEWAY
                                                                                                                                                                                           SUPERVISING RPEQ OR APPROVING AUTHORITY.                                                                             OTHER BLOCKAGES.
                                                                                                                                                                                      9.   THE CONTRACTOR IS TO UNDERTAKE ALL WORKS IN ACCORDANCE WITH ALL WORKPLACE HEALTH AND SAFETY                    7.    RESIDENTIAL DRAINAGE CONNECTIONS TO KERB AND CHANNEL REFER TO IPWEA STD DRG RS-081.                                                                                                                                                                               ASPHALT
                                                                                                                                                                                           REQUIREMENTS.                                                                                                  8.    ALL GULLY PITS & MANHOLE HORIZONTAL SETOUT IS TO CENTRE OF PIT
                                                                                                                                                                                                                                                                                                          9.    GULLY PIT FINISHED SURFACE LEVELS ARE TO LIP OF CHANNEL.                                                                                                                                                                                                         STORMWATER
                                                                                                                                                                                      10. WHERE ANY EXCAVATION OR CONSTRUCTION WORKS ARE IN CLOSE PROXIMITY TO NEIGHBOURING LOT
                                                                                                                                                                                          BOUNDARIES OR INFRASTRUCTURE, THE CONTRACTOR IS TO ALLOW IN SCOPE OF WORKS TO PROVIDE ALL                       10. MANHOLE FINISHED SURFACE LEVELS ARE TO DESIGN SURFACE
                                                                                                                                                                                          MEASURES NECESSARY TO ENSURE THE INTEGRITY OF EXISTING BOUNDARIES AND INFRASTRUCTURE. THIS
                                                                                                                                                                                          MAY INCLUDE THE USE OF LOW VIBRATION EQUIPMENT, TRENCH SHORING ETC AS REQUIRED.
                                                                                                                                                                                      11. THE CONTRACTOR SHALL NOTIFY ALL RELEVANT AUTHORITIES AND ENSURE REQUIRED CONDITIONS HAVE BEEN
                                                                                                                                                                                          MET PRIOR TO COMMENCEMENT. THE CONTRACTOR SHALL NOTIFY ARCOS GROUP PRIOR TO COMMENCING
                                                                                                                                                                                          WORKS AND RECEIVE WRITTEN CONFIRMATION THAT THE WORKS CAN COMMENCE.
                                                                                                                                                                                      12. CONTRACTOR SHALL PROVIDE AS CONSTRUCTED DRAWINGS FOR ALL CONSTRUCTED WORKS IN ACCORDANCE
                                                                                                                                                                                          WITH COUNCIL REQUIREMENTS UNLESS OTHERWISE ADVISED BY ARCOS GROUP.
                                                                                                                                                                                      13. THE FOLLOWING HOLD POINT INSPECTIONS WILL BE REQUIRED;
                                                                                                                                                                                            ·   CONSTRUCTION PRE-START MEETING
                                                                                                                                                                                            ·   SET OUT
                                                                                                                                                                                            ·   CONCRETE PRE-POURS
                                                                                                                                                                                            ·   FINAL INSPECTION
                                                                                                                                                                                      14. THE CONSTRUCTION PRE-START MEETING IS AN OPPORTUNITY FOR ALL PARTIES TO DISCUSS CRITICAL ISSUES,
                                                                                                                                                                                          SUCH AS:
                                                                                                                                                                                            ● KEY OBJECTIVES OF THE EROSION AND SEDIMENT CONTROL PLAN;
                                                                                                                                                                                            ● REQUIRED WATER QUALITY OBJECTIVES;
                                                                                                                                                                                            ● PERFORMANCE MONITORING AND INSPECTION PROCEDURES;
                                                                                                                                                                                            ● IDENTIFICATION OF THE RESPONSIBLE SITE OFFICERS;
                                                                                                                                                                                            ● IDENTIFICATION OF CRITICAL ENVIRONMENTAL CONCERNS;                                                                                                                     CONTRACTOR TO CONFIRM DEPTHS OF ALL                                                                                                            EXISTING 375Ø
                                                                                                                                                                                                                                                                                                                                                                     EXISTING SERVICES PRIOR TO CONSTRUCTION                                                                                                        RCP
                                                                                                                                                                                            · REPORTING PROCEDURES FOR NON-COMPLIANCE ACTIVITIES AND EVENTS.                                                   11
                                                                                                                                                                                                                                                                                                          RP28713




                                                                                                                                                                                                                                                                                                                                                                      CONTRACTOR TO ENSURE COVER MAINTAINED
                                                                                                                                                                                                                                                                                                                                                                      OR ADDITIONAL PROTECTION SLABS INSTALLED                                                                             MAINTAIN MIN 1m OFFSET TO EXISTING
                                                                                                                                                                                                                                                                                                                                                                      WHERE REDUCED COVER IS REQUIRED.                                                                                     POWER POLE FOR CROSSOVER


                                                                                                                                                                                                                                                                                                                                                                                                         INSTALL VERTICAL                                                                  MODIFIED CONCRETE DRIVEWAY & JOINTING IN
                                                                                                                                                                                                                                                                                                                                                                                                         TRANSITIONS AS REQUIRED                                                           ACCORDANCE WITH IPWEA STD DRG RS-049 & RS-050.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           FOOTPATH PROFILE REMOVED AND MAX 1 ON 8 IN
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           VERGE TO ENSURE B99 VERTICAL COMPLIANCE


                                                                                                                                                                                                                                                                                                                                                  INSTALL VERTICAL




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      WARD STREET
                                                                                                                                                                                                                                                                                                                                                  ROLLOVER AS REQUIRED




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             4.00
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    3.00
                                                                                                                                                                                                                                                                                                                                                    GARAGE ENTRANCE                                                            MAX 25%
                                                                                                                                                                                                                                                                                                                                                                                                                                                                 12.5%      12.5%                    MAX -3%




                                                                                                                                                                                                                                                                                                                                                                                                                                                          5.00
                                                                                                                                                                                                                                                                                                                                                            GARAGE FFL
                                                                                                                                                                                                                                                                                                                                                               6.95                                                                                                                                                                     EXISTING 375Ø RCP
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        TO REMAIN


                                                                                                                                                                                                                                                                                                                 10
                                                                                                                                                                                                                                                                                                               RP28713


                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           EXISTING INLET AND GRATE TO BE REMOVED,
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           EXISTING PIT TO BE REUSED. INSTALL V GRATE
                                                                                                                                                                                                                                                                                                                          UP
Filename: C:\ARCOSGROUP\2022 SYNERGY PROJECTS - DOCUMENTS\TOTALSYNERGY\220274 URB RES - 54 WARD STREET, TEWANTIN\3.0 CAD\DRAWINGS\DRG\220274-DRG-C-00301.DWG




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           OVER EXISTING STORMWATER PIT IN
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           ACCORDANCE WITH COUNCIL STANDARDS.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        WARNING
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            BEWARE OF UNDERGROUND SERVICES
                                                                                                                                                                                                                                                               UP




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       INSTALL 'S' LINTEL LIP IN LINE GULLY PIT IN
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       ACCORDANCE WITH IPWEA STD DRG D-063                                        POSITION OF EXISTING UNDERGROUND SERVICES SHOWN
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       E: 1093.957                                                                   IS APPROXIMATE ONLY. EXACT POSITION SHALL BE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       N: 1092.862                                                                    PROVEN ON SITE BY THE CONTRACTOR PRIOR TO
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           COMMENCEMENT OF CONSTRUCTION

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            EXISTING 375Ø RCP

                                                                                                                                                                                                                                                                                                                                                                                                                                       3.05m CLASS 3
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 LOCATION OF SERVICES
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 PRIOR TO COMMENCEMENT OF NEW WORK THE
                                                                                                                                                                                                                                                                                                                                                                                                                                       375Ø RCP
                                                                                                                                                                                                                                                                                                                                                                                                                                       US IL: 4.165                                                                                                                              CONTRACTOR SHALL CONFIRM LOCATIONS, LEVELS AND
                                                                                                                                                                                                                                                                                                                                                                                                                                       DS IL: 4.150                                                                                                                              DETAILS OF EXISTING CONNECTION POINTS AND SERVICE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 CROSSINGS BY POT HOLING. IF A VARIATION OCCURS
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      CONTRACTOR TO REMOVE A MINIMUM OF 1.2m                                     CONTACT THE ENGINEER PRIOR TO CONSTRUCTION.
                                                                                                                                                                                                                                                                                                    9                                                                                                                                                                                                 WIDE STRIP IN FRONT OF DRAINAGE WORK AND
                                                                                                                                                                                                                                                                                                RP28713                                                                                                    REINSTATE KERB & CHANNEL
                                                                                                                                                                                                                                                                                                                                                                                                           FOLLOWING PIPE INSTALLATION                                                                REPLACE ASPHALT SURFACING (AC10 C320).
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 PROTECTION OF SERVICES
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 THE CONTRACTOR SHALL CONTACT THE RELEVANT
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 AUTHORITIES AND ARRANGE FOR RELOCATION AND / OR
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 PROTECTION OF EXISTING SERVICES AS REQUIRED TO SUIT
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 SURROUNDING NEW WORK, CONSTRUCTION LOADINGS AND
                                                                                                                                                                                                                                                                                                                                                                                                       EXISTING CONCRETE CROSSOVER
Last saved by: ARCOS CIVIL(2022-06-16) Last Plotted: 2022-06-16




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 TO SUIT FINAL FINISHED SURFACE LEVELS AND GRADES.
                                                                                                                                                                                                                                                                                                                                                                                                       TO BE REMOVED. TOPSOIL AND
                                                                                                                                                                                                                                                                                                                                                                                                       TURF ALL DISTURBED AREAS

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             SETTING OUT
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             DESIGN FINISHED SURFACE LEVELS OF STRUCTURES ARE FOR
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             THE CONTRACTOR'S GUIDANCE ONLY. ACTUAL FINISHED LEVELS
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             SHALL BE SET OUT AS DIRECTED ON-SITE IN KEEPING WITH THE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             REQUIREMENTS AND SPECIFICATIONS OF THE LOCAL AUTHORITY
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             AND ACTUAL FINISHED GROUND LEVELS.




                                                                                                                                                                                                                                North Point      Scale                                  Horiz. Datum       Client                                    Consultant                                                                                     Project                                                                         Drawing
                                                                                                                                                                                                                                                                                          LOCAL                                                                                                                                                                                                     Drawn               TP                                                                         Project No.         Drawing No.           Rev No.
                                                                                                                                                                                                                                                                                                                ABBEY & RIC ANDERSON                                                                                                                      BUILDING WORKS - CIVIL                                                                    DEVELOPMENT SITE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    Design              TP
                                                                                                                                                                                                                                                                                                                                                                                                                                                      PROPOSED RESIDENTIAL DWELLING                                                                       PLAN
                                                                                                                                                                                                                                                    0m
                                                                                                                                                                                                                                                    A1 1:100
                                                                                                                                                                                                                                                                    2.5     5
                                                                                                                                                                                                                                                                                        Vert. Datum
                                                                                                                                                                                                                                                                                           AHD
                                                                                                                                                                                                                                                                                                                                                                                                                                                             54 WARD STREET                         Check              GM
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    220274         DRG-C-00301                B
                                                                                                                                                                B REVISED DRAINAGE                            16.06.22 LS                                                                RL Datum                                                                                                      CIVIL | STRUCTURAL | GEOTECHNICAL                   TEWANTIN, QLD, 4565                      Approved                             Approved Date      Signed                                                                   Sheet
                                                                                                                                                                A FOR APPROVAL
                                                                                                                                                               Rev           Revision Description
                                                                                                                                                                                                              07.04.22 LS
                                                                                                                                                                                                                Date Approved
                                                                                                                                                                                                                                                                                                                                                     COPYRIGHT © All rights reserved.
                                                                                                                                                                                                                                                                                                                                                     This work is copyright and cannot be reproduced
                                                                                                                                                                                                                                                                                                                                                     or copied in any form without the prior consent
                                                                                                                                                                                                                                                                                                                                                                                                       SUNSHINE COAST | BRISBANE | GOLD COAST
                                                                                                                                                                                                                                                                                                                                                                                                       www.arcosgroup.com.au | ABN 51 640 311 842
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    LACHLAN SWANN
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    RPEQ    21223
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         07.04.22                                              Status   FOR APPROVAL
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     Size     A1

Used in these records

About this file

File size
307 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Approved Plan - OPW22-0204.pdf · 307 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.