Skip to the record
Search everything, all in one place.

Council archive · source document

Decision Notice MCU22 0207 & OPW22 0314 · MCU22/0207

of 15

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 

 

 

 

 

 

 

MEMBER SCHEDULE

FJ1 - 200x 50F 14 CONTINUOUS JOISTS AT 500 CRS

2.NO. SS taming

anchors per connection

FJ2  - 200x 50F 14 SINGLE SPAN JOISTS AT 250 CRS

2.NO, SS taming

anchors per connection

FJ3 - 200x SOF 14 SINGLE SPAN JOISTS AT 500 CRS

2NO. SS taming

anchors per connecton

FB1 - 200x 75F 14,150 x10 mm SS angle, 250mm ing
wit) 4-M12 to bearer, 24/16 to top of pile

FB2 -200x75F14,150x10 mm SS angle, 250mm ing
wih 4-M12 to bearer, 24/16 to top of pile

PPI - 200x 50F 14 pole plate Sxed with M12 at900 CRS

 

 

 

 

CRAWNG TILE
FOUNDATION &@ JETTY PLAN

 

SCALES

 

‘SURVEY DATUM

 

ASSOCIATED CONSUL TANTS

 

 

 

 

PLANS AND DOCUMENTS oe»

referred to in the REFERRAL 3
AGENCY RESPONSE =

SARA ref:

  

Date:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

sie Se

 

 

 

RG8243 E |e

 

 

Page 14 of 15

Document Set ID: 22371196

Version: 3, Version Date: 13/04/2023

Used in these records

About this file

File size
477 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice MCU22 0207 & OPW22 0314.pdf · 477 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.