Original source · versioned page text
MCU25 0087 - Reference Document - Coastal Hazard Assessment (As Published)
17 The Esplanade, Sunshine Beach Report The beach profile adopted by BMT (2018) for ETA 602 is shown in Figure 5-11 and was derived from (LIDAR, 2016) data combined with the Sunshine Coast Bathymetric (Department of Environment and Science, 2011) for the nearshore section. The beach profile for this assessment (refer Figure 5-11) was based on detailed site survey (refer Appendix C) supplemented with a Digital Elevation Model (ELVIS, 2024) for the stable high dune areas. The profiles are different and this impacts on the extent of erosion that may occur during the adopted design storm event. Figure 5-11 ETA 602 Beach profile and storm ETA 2100 5.3.2 Depth of Closure The depth of closure adopted BMT (2018) was -11.5m AHD. However, M&N has adopted a depth of closure of -12m AHD. This difference is unlikely to significantly alter the Bruun Rule calculation. 5.3.3 Dune of Toe BMT (2018) determined the dune toe position by utilising the manually digitised coastline from the Department of Resources and incorporating the Highest Astronomical Tide (HAT) contour. M&N have adopted a level of 2.3m AHD as the toe of the dune based on site inspection (seaward edge of vegetation) and detailed survey (refer Section 2.4). 5.3.4 Active beach width and height The active beach width represents the horizontal distance from the dune crest to the depth of closure. According to BMT (2018) and M&N, the adopted active beach width measures 525m and 520m, respectively. The variation in these measurements is attributed to BMT's approach of taking the dune location as the frontal dune. 5.3.5 Dune height Figure 5-12 Dune heights and beach profile shows the dune heights adopted by BMT (2018) and M&N against the beach profile adopted for the assessment in this report. BMT (2018) adopted 4.9m AHD which corresponds to the frontal dune and therefore underestimates the reserve of sand available in the dune system. M&N adopted a dune height of 15m AHD which was determine over an iterative process (see Section 5.2.3). 252662-MN-RP-CO-0001B | 10 November 2025 | Page 32 Document Set ID: 24631530 Version: 1, Version Date: 24/03/2026
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewSearchable page text hides email addresses. Original files are unchanged and may show email addresses.