GENERAL COMMITTEE MEETING AGENDA 7 MARCH 2016
o substantial completion of major projects such as the Munna Point bridge refurbishment
and the completion of sealing of Dr Pages Road (both due for completion in April 2016);
and
o a large range of smaller projects such as the Cooran sports field lights, re-siting of Tait
Duke House, sand restoration works at Munna Point, re-tiling the 25 meter pool at the
NAC, refurbishment of playgrounds, additional pathway construction and work on relining
some stormwater drainage just to name some of the other projects.
Council has developed a plant and fleet program to enable it to better plan and manage its
future requirements. This plan includes a three year injection of funding to bring Council’s
fleet and plant up to standard following the transfer of older items of plant following the de-
amalgamation.
Council has adopted a number of policies and actions to assist in better managing community
assets. These include an Asset Management Policy and Community Purpose Land and
Infrastructure Tenure Policy.
Council has adopted its first high level set of Asset Management Plans and is currently
undertaking an asset capability audit to improve our asset management practices.
Corporate Plan Priority 5 – Establishing new policies and strategies
As a Council, we will need to develop a range of policies and strategies that set the path for
future Councils There are a number of strategies and policies to be reviewed and developed that
will set the strategic direction for the future.
Key achievements include:
Council established a new set of Local Laws and Subordinate Local Laws after undertaking
an extensive community consultation campaign. The new Local Laws came into effect on 1
July 2015 with a smooth transition.
The vast majority of policies required to be reviewed following the de-amalgamation process
have been completed. Many of these were governance type policies which are important
from a governance and compliance perspective. These include:
o Public Interest Disclosure Policy;
o Contact with Lobbyists Policy; and
o Public Officials Complaints Policy.
All of Council’s delegations have been developed and implemented.
A number of background studies and assessments have been undertaken in preparation for
the development of the next Town Planning Scheme. This includes the Noosa Demographic
Profile, Noosa Economic Profile plus a range of flood studies. The new Planning Scheme is
obviously one of the major issues for the next Council term.
Council developed a new Community Grants Policy and established a streamlined process
for assessing community grant applications. Council also adopted a Street Performance
Policy.
The Council has adopted a Social Strategy for Noosa. This Strategy has four long term
development goals:
o A cohesive and resilient community
o An active and healthy community
o An accessible, diverse and affordable community
o A creative and informed community
The Council re-established its Local Disaster Management Group (LDMG) and successfully
managed two flooding events. A number of training exercises have also been undertaken.
Page 16 of 20
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.