Skip to the record
Mmm.. taste the original NoosaWatch™

Council archive · source document

OPW staging plans revised · MCU13/0211.02

Attached to the e-mail MCU13/0211.02 & REC13/0136.02 & OPW15/0185.03 - amended plans.

of 7

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
Construction Hydraulic
    Building Service Engineers


[OCR of page images]
 

 

 

Fall

 

Fall lies Fall
sey

 

 

 

Fall

 

“300 ~
i

7200

 

 

inched grate

   

 

Grade W12144/12

Floor drain to strainer

 

 

 

     
 

 

 

 

 

Ground level
Secondary
Strainer To Sewer
Bucket on 3
Strainer ~100
Thrust block

 

PROPOSED BUNDED EXTERNAL
OWN DETAIL CONNECT TO SEWER

WASH_Di

 

50

Scale

SL approx 1.150

 

 

   
 

"Fox" Gross
Pollutant Trap

 

 

 

 

TRENCH GRATE & FOX” GROSS
POLLUTANT TRAP DETAIL

  

 

 

 

 

SECTION A — A

Z] y-0.05

   

New concrete
Inlet with
scour protection

 

Pollution Control

 

agement Plan (PCMP):

1. To be responsibility of Management

2. To list all in flow filtering devices like leaf eaters
at DP’s and other filters

3. To keep and maintain a log of cleaning

4. To clean devices including first flush storage tank
—as to manufactures specification
—minimum quarterly, but monthly in rainy season
—after each major rainfall event

 

 

5. To inspect and clean tanks minimum once yearly
6. To install and maintain pump and fixtures for
reuse/watering/irrigation as to manufactures specification
Pollutant Efficiency Rating Device
Litter 80-100% VH Fl, Fox
Organic 80-100% VH Fl, Fox
Coarse Sediment 80-100% VH Fl, Fox
Fine Sediment 60-80% H Fl, Fox
Free Oil & Grease} 60-80% H Infiltration
Nutrients (N&P) 40-80% M-H Infiltration

 

 

 

 

 

 

Grated lid
Su1.140

 

~300

 

Pete eo

TIE

 

 

 

 

1050

 

~375

 

 

110.530

New 150mm

 

 

 

 

100.450

Chamber to be
inspected & cleaned:
min ev. 3 mths.
monthly Oct.—Feb.

after each major rainfall

NEW_IC_INSPECTION CHAMBER
SCHEMATIC

NTS

   
 
 
 

RFC headwall ~375 discharge
from proposed development

min 5No

velocity

breakers

150x150x50

natural bank

discharge
to Noosa River

Existing
open channel

 
  
 
  
  
  
 
  

 

isting kerb & Channel
drain to open channel

Existing 900x900
culvert

 

bitumen

Mill Street

Grossed crea
DETAIL DISCHARGE TO OPEN
CHANNEL

POLLUTION CONTROL SCHEME

C [Outlet to Callaghan & Toth Plan 0619—05C 25-03-19
A_|infiltration deleted 27-04-06
x (23-11-05

PH: 5444 8645

 

CONTACT:

Reinhold Koenning

CLIENT :
NC OLIVER PROPERTIES PTY LTD
ARCHITECT =
MIDDAP DITCHFIELD PTY LTD

PROJECT: PROPOSED UNIT DEVELOPMENT
HILTON TERRACE
NOOSAVILLE

DRAWING TITLE:

GENERAL NOTES &
DETAILS

22-11-05
1 3 | 1451-0

-Lots 1, 2, 3 & 9 MCH3881

-1 Cc

 

 

 

 

 

 

 

 

Used in these records

About this file

File size
1.9 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

OPW staging plans revised.pdf · 1.9 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.