Council archive · source document
OPW staging plans revised · MCU13/0211.02
Attached to the e-mail MCU13/0211.02 & REC13/0136.02 & OPW15/0185.03 - amended plans.
Plans and drawings: the text below has words only, no drawings.
Construction Hydraulic
Building Service Engineers
[OCR of page images]
Fall
Fall lies Fall
sey
Fall
“300 ~
i
7200
inched grate
Grade W12144/12
Floor drain to strainer
Ground level
Secondary
Strainer To Sewer
Bucket on 3
Strainer ~100
Thrust block
PROPOSED BUNDED EXTERNAL
OWN DETAIL CONNECT TO SEWER
WASH_Di
50
Scale
SL approx 1.150
"Fox" Gross
Pollutant Trap
TRENCH GRATE & FOX” GROSS
POLLUTANT TRAP DETAIL
SECTION A — A
Z] y-0.05
New concrete
Inlet with
scour protection
Pollution Control
agement Plan (PCMP):
1. To be responsibility of Management
2. To list all in flow filtering devices like leaf eaters
at DP’s and other filters
3. To keep and maintain a log of cleaning
4. To clean devices including first flush storage tank
—as to manufactures specification
—minimum quarterly, but monthly in rainy season
—after each major rainfall event
5. To inspect and clean tanks minimum once yearly
6. To install and maintain pump and fixtures for
reuse/watering/irrigation as to manufactures specification
Pollutant Efficiency Rating Device
Litter 80-100% VH Fl, Fox
Organic 80-100% VH Fl, Fox
Coarse Sediment 80-100% VH Fl, Fox
Fine Sediment 60-80% H Fl, Fox
Free Oil & Grease} 60-80% H Infiltration
Nutrients (N&P) 40-80% M-H Infiltration
Grated lid
Su1.140
~300
Pete eo
TIE
1050
~375
110.530
New 150mm
100.450
Chamber to be
inspected & cleaned:
min ev. 3 mths.
monthly Oct.—Feb.
after each major rainfall
NEW_IC_INSPECTION CHAMBER
SCHEMATIC
NTS
RFC headwall ~375 discharge
from proposed development
min 5No
velocity
breakers
150x150x50
natural bank
discharge
to Noosa River
Existing
open channel
isting kerb & Channel
drain to open channel
Existing 900x900
culvert
bitumen
Mill Street
Grossed crea
DETAIL DISCHARGE TO OPEN
CHANNEL
POLLUTION CONTROL SCHEME
C [Outlet to Callaghan & Toth Plan 0619—05C 25-03-19
A_|infiltration deleted 27-04-06
x (23-11-05
PH: 5444 8645
CONTACT:
Reinhold Koenning
CLIENT :
NC OLIVER PROPERTIES PTY LTD
ARCHITECT =
MIDDAP DITCHFIELD PTY LTD
PROJECT: PROPOSED UNIT DEVELOPMENT
HILTON TERRACE
NOOSAVILLE
DRAWING TITLE:
GENERAL NOTES &
DETAILS
22-11-05
1 3 | 1451-0
-Lots 1, 2, 3 & 9 MCH3881
-1 Cc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
OPW staging plans revised.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.9 MB (small file)
- File type
No other editions are linked here.