SITE BASED STORMWATER MANAGEMENT PLAN

For

Dr. Drew McMenamin



Proposed Medical Centre Development at

45 Maple Street,

Cooroy




Job Ref: SC- 8407



March 2020

Log in to download the original (Stormwater Mgmt Plan.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 26 pages

Page 2

SC-8407 – 45 Maple Street, Cooroy                                                              ii



                               AUTHORSHIP INFORMATION

                    REPORT TITLE        Site Based Stormwater Management Plan
                    Affected
                    Properties
                    Street Address      45 Maple Street, Cooroy
                    RP Description      Lot 15 C5605
                    Prepared For        Dr. Drew McMenamin
                    Report Status       For DA Approval
                    Prepared By
                    Name                Aaron Petersen
                    Qualifications      Undergraduate Civil Engineer
                    Phone Number        07 5477 6437
                    Reviewed By
                    Name                Sean Dwyer
                    Qualifications      BE (Civil), CPEng, RPEQ 17012
                    Phone Number        07 5477 6437
                    Approved By
                    Name                Troy Paulsen
                    Qualifications      BE (Civil), CPEng, RPEQ 6990
                    Phone Number        07 5477 6437


                          REVISION        DATE             Reviewed/ Approval

                               A         19.03.20

                               B         24.03.20




Document Qualifying and Ownership Statement:
The contents of this document represent an assessment of the facts and circumstances pertaining to this
matter, as they are known to the writer at the time of preparation. It is possible that upon completion and
distribution of this document further information may come to hand that impact upon the findings,
recommendations or conclusions drawn in this document. This document and its contents remains the
property of Empire Engineering and cannot be reproduced in whole or in part for any reasons that could be
considered to be outside the exact, intended original use of this document.

Page 3

SC-8407 – 45 Maple Street, Cooroy                                                                                                               iii




                                                 TABLE OF CONTENTS
1.0       Introduction ................................................................................................................. 1
   1.1        Background ...............................................................................................................1
   1.2        Scope ........................................................................................................................1
   1.3        Existing Topography .................................................................................................1
   1.4        Proposed Development ............................................................................................1
2.0       Existing Drainage Regime .......................................................................................... 3
   2.1        Subject Site ...............................................................................................................3
3.0       Stormwater Quality Management .............................................................................. 4
   3.1        Background ...............................................................................................................4
   3.2        Construction Phase ..................................................................................................4
   3.3        Operational Phase ....................................................................................................6
      3.3.1       Water Quality Objectives ......................................................................................6
4.0       Stormwater Quantity Management ............................................................................ 7
      4.1         Background ..........................................................................................................7
      4.2         Methodology .........................................................................................................7
      4.3.2       Catchment Areas ..................................................................................................8
      4.3.3       Roughness Coefficients .......................................................................................8
      4.3.4       Storm Events ........................................................................................................8
      4.3.5       Outlet Condition ....................................................................................................9
      4.3.6       On-Site Detention .................................................................................................9
   4.4        Modelling Results ...................................................................................................10
5.0       Flood Hazard Overlay and External Catchment ..................................................... 11
6.0       Conclusions ............................................................................................................... 11
APPENDIX A – CONCEPT STORMWATER MANAGEMENT PLAN AND ........................... 12
DETAIL & CONTOUR SURVEY ............................................................................................. 12
APPENDIX B – XP STORM MODELLING RESULTS ............................................................ 13

Page 4

SC-8407 – 45 Maple Street, Cooroy                                                               1



1.0 Introduction
1.1      Background
This report is to accompany and be considered part of an application to Noosa Shire Council to gain approvals
for a proposed medical centre development at 45 Maple Street, Cooroy.


1.2      Scope
Empire Engineering Pty Ltd was commissioned by Dr. Drew McMenamin to develop a Site Based Stormwater
Management Plan (SBSWMP) to outline water management strategies for the proposed development that will
comply with Council’s relevant planning scheme policies, Queensland Development Code and the
Environmental Protection Act (1994) and associated Environmental Protection (Water) Policy 1997.


This report presents the results of engineering design and outlines the proposed measures to be adopted in
relation to stormwater quality and quantity management for the subject site and the proposed development.


1.3      Existing Topography
                                                2
The subject site has a total area of 2,252m , is fronting Maple Street to the west and bounded by existing
commercial lots to the north-east and existing residential allotments to the remaining boundaries. The subject
site is currently occupied by a large residential dwelling, refer Figure 1.1.


The average site elevations vary from RL122.50 on the Western boundary, to RL115.00 on the Eastern
boundary with an average slope of approximately 8%.


1.4      Proposed Development
Schematic architectural drawings prepared by Blackburne Jackson depict the proposed medical centre.

Page 5

SC-8407 – 45 Maple Street, Cooroy                                        2




                                    Subject Site:




                                                                     N

                                         Figure 1.1 - Subject Site


[OCR of page images]
SC-8407 — 45 Maple Street, Cooroy 2

 

 

Figure 1.1 - Subject Site

 

= e
2 Empire

Engineering

Page 6

SC-8407 – 45 Maple Street, Cooroy                                                            3



2.0 Existing Drainage Regime
2.1      Subject Site
Stormwater currently sheet flows across the subject site and the ‘Balance Lot’ towards Myall Street road
reserve to the east. Then travel’s south via kerb and channel towards two kerb inlets ‘KI 1 & 2’ (Refer
Figure 2.1). The existing underground drainage network conveys south along the western side of Myall
Street. Kerb inlets (KI 1 & 2) drain to an existing 450mm dia network which outlets to an existing drainage
easement (DEMT) on the eastern side of Myall Street.




                                          Subject Site



                                                                                                  N




                                                                Balance Lot




                                                                  KI 1 & 2




                                                                                           DEMT




                                    Figure 2.1 - Existing Drainage Regime

Page 7

SC-8407 – 45 Maple Street, Cooroy                                                                4



3.0 Stormwater Quality Management
3.1      Background
A requirement of the subject site is that Stormwater quality treatment shall be provided to meet the design
objectives set out in Section 2.4 of DERM’s Urban Stormwater Quality Planning guidelines 2010 and the
associated with State Planning Policy (SPP) 4/10 Healthy Waters. The scope typically encompasses the
‘post construction’ phase of the development however ‘construction phase’ water quality is briefly
addressed.


3.2      Construction Phase
Table 3.1 has been adapted from Table C4.1 of Brisbane City Council’s (BCC) Stormwater Best
Management Practices 2000 and details the typical stormwater pollutants which may be generated during
the construction phase of the development.


                     Pollutant                                       Sources

                         Litter                   Paper, construction packaging, food packaging,
                                                             cement bags and off-cuts
                     Sediment                    Unprotected exposed soils and stockpiles during
                                                             earthworks and building
                  Hydrocarbons                 Fuel and oil spills, leaks from construction equipment

                  Toxic Materials              Cement slurry, solvents, cleaning agents, wash waters

             pH Altering Substances                        Cement slurry, wash waters

                                    Table 3.1 - Typical Construction Phase Pollutants


         The following ESC measures should typically be implemented prior to the commencement of
         construction:
                 Education of all site workers in sediment and erosion procedures;
                 Specified storage areas for construction materials and plant that are bunded to prevent
                  any spillages from escaping.


         Table 3.2 illustrates the State Planning Policy objectives for construction phase stormwater quality
         that the erosion and sediment control plan to be submitted with the operational works approval is
         required to achieve.

Page 8

   SC-8407 – 45 Maple Street, Cooroy                                                                   5


Issue                                   Design objectives
Drainage         Temporary drainage     1.         Design life and design storm for temporary drainage works:
control          works                             Disturbed area open for <12 months—1 in 2-year ARI event
                                                   Disturbed area open for 12–24 months—1 in 5-year ARI event
                                                   Disturbed area open for > 24 months—1 in 10-year ARI event
                                        2.          Design capacity excludes minimum 150 mm freeboard
                                        3.          Temporary culvert crossing—minimum 1 in 1-year ARI hydraulic
                                                    capacity
Erosion          Erosion control        1.          Minimise exposure of disturbed soils at any time
control          measures               2.          Divert water run-off from undisturbed areas around disturbed
                                                    areas
                                        3.          Determine the erosion risk rating using local rainfall erosivity,
                                                    rainfall depth, soil-loss rate or other acceptable methods
                                        4.          Implement erosion control methods corresponding to identified
                                                    erosion risk rating
Sediment         Sediment control       1.          Determine appropriate sediment control measures using:
control          measures                          Potential soil loss rate, or
                                                   Monthly erosivity, or
                                                   Average monthly rainfall
                 Design storm for       2.          Collect and drain stormwater from disturbed soils to sediment
                 sediment control                   basin for design storm event:
                 basins                            Design storm for sediment basin sizing is 80th% five-day event
                                                    or similar
                                        3.          Site discharge during sediment basin dewatering:
                 Sediment basin                    TSS < 50 mg/L TSS, and
                 dewatering                        Turbidity not >10% receiving waters turbidity, and
                                                   pH 6.5–8.5
Water            Litter and other       1.          Avoid wind-blown litter; remove gross pollutants
quality          waste, hydrocarbons    2.          Ensure there is no visible oil or grease sheen on released waters
                 and other              3.          Dispose of waste containing contaminants at authorised facilities
                 contaminants
Waterway         Changes to the         For peak flow for the 1-year and 100-year ARI event, use constructed
stability and    natural waterway       sediment basins to attenuate the discharge rate of stormwater from the
flood flow       hydraulics and         site
management       hydrology
                              Table 3.2 - Construction Phase Stormwater Quality Objectives

Page 9

SC-8407 – 45 Maple Street, Cooroy                                                               6


3.3       Operational Phase
During the operational stage of the development, the following impacts have been identified in relation to
stormwater runoff and water quality of the receiving waterways:
         Gross pollutants which include human derived litter and vegetation
         Coarse sediment
To target these potential pollutants coarse sediment traps or GPT baskets are proposed to be incorporated
within the drainage within trafficable pavement areas.


3.3.1     Water Quality Objectives
The water quality objectives (WQO’s) for this site were determined in accordance with Appendix 2 of the
State Planning Policy (SPP) Jul 2017. As the development proposal involves a material change of use for
urban purpose that involves premises of less than 2500 square metres, the development is exempt from
demonstrating WSUD load reductions.


Noosa Councils Planning Scheme Policy, ‘Division 20’ Water Sensitive Design Code requires the capture
and utilising of run-off from appropriate areas on-site. Accordingly, 60kL of harvesting and reuse is
proposed to be available for all external uses including gardening, irrigation, ponds and outdoor cleaning,
to satisfy specific outcome O2, Table 14-61 to this code.

Page 10

SC-8407 – 45 Maple Street, Cooroy                                                              7



4.0 Stormwater Quantity Management
4.1      Background
The subject site has an existing fraction impervious of 30%. The proposed works will increase this fraction
impervious to approximately 80%. The proposed Medical Centre will subsequently require on-site detention
to ensure non-worsening to the downstream drainage infrastructure. In preventing nuisance to the
downstream Balance Lot, a formal inter-allotment drainage system is proposed in accordance with QUDM.


The software package XP-STORM was used to model the site and calculate an on-site detention volume
as described in the following sections.


4.2      Methodology
XP-STORM V2017.2.2 has been used to model the site in its current and post-developed state. The
modelling has been undertaken to determine detail design parameters of on-site detention to replicate pre-
development peak flow rates. As the development falls within the ‘Commercial’ development category
(QUDM), the (10% AEP) storm event was adopted for sizing the minor design drainage system.


Events ranging up to and including the 1% AEP storm event were analysed to compare pre/post
development discharges ensuring ‘non-worsening’. The development modelling and analysis undertaken
was based on the information provided by the detailed site survey and preliminary architectural layouts.

Page 11

SC-8407 – 45 Maple Street, Cooroy                                                              8




4.3.2    Catchment Areas
The subject site has been modelled in its existing pre-development and proposed post-development states
with the catchment areas illustrated in Tables 4.1 & 4.2. In its pre-development state the subject
catchments were each modelled as one hydrologic node to replicate the existing drainage situation for the
lot. XP-STORM model layouts and outputs are included in Appendix B of this report.


                 Catchment                  Description          % Impervious        Area (Ha)

                                                Roof                  100              0.068
                      ‘A’
                                             Landscape                  0              0.244

                            Table 4.1 - Pre Development Node Sub-Catchment Areas


                 Catchment                  Description          % Impervious        Area (Ha)

                                                Roof                  100              0.106

                      ‘B’              Carpark/hardstand areas        100              0.180

                                             Landscape                  0              0.045

                                                Roof                  100              0.016
                      ‘C’
                                             Landscape                  0              0.034

                                                Roof                  100              0.022
                      ‘D’
                                             Landscape                  0              0.077

                             Table 4.2 - Post Development Sub–Catchment Areas

4.3.3    Roughness Coefficients
The conduits and links used within the model are based on the ultimate design scenario for the internal
roadways and overland flow paths. Mannings “n” roughness coefficient values are specified as 0.014 for
RCP pipes and 0.011 for uPVC pipes.


For overland flow within the sub-catchment areas a Mannings “n” value of 0.014 for concrete areas and
0.025 for vegetated areas was adopted.


4.3.4    Storm Events
Storm patterns were setup using Australian Rainfall and Runoff (ARR 2016) storm patterns with intensity
frequency duration data taken for the local area. Storm durations of 10, 15, 20, 25, 30, 45, 60, 90, 120 and
180 minutes were investigated for the pre and post developed scenarios.

Page 12

SC-8407 – 45 Maple Street, Cooroy                                                              9


4.3.5    Outlet Condition
The subject site is not impacted by regional flooding or tidal backwater.


4.3.6    On-Site Detention
It is calculated from the development site plan that the proposed development will increase impervious
areas on the site. The proposed increase in impervious areas has the potential to increase peak flow rates
to the existing drainage system. To mitigate potential increases in flow rates it is planned to detain
stormwater flows on-site and discharge at a mitigated rate to the existing stormwater infrastructure system.


Mitigation of flow is provided by the following volumes:
        Catchment A – Minimum 60kL of on-site detention volume.

A concept drainage layout plan has been included as Appendix A of this report.

Page 13

SC-8407 – 45 Maple Street, Cooroy                                                            10


4.4      Modelling Results
A node layout plan is included in Appendix B of this report and the resultant peak flow rates are displayed
in Table 4.3 & 4.4.

                                                                  3
                                                   Peak Flow (m /s)
                                    AEP (%)
                                                   Pre Development

                                    50 (Q2yr)       0.093 (30min_1)

                                    20 (Q5yr)       0.137 (20min_10)

                                    10 (Q10yr)      0.166 (30min_3)

                                    5 (Q20yr)       0.194 (30min_3)

                                    2 (Q50yr)       0.222 (15min_8)

                                    1 (Q100yr)      0.245 (15min_8)

                            Table 4.3 – Pre-Development Peak Flow Rate Results


                                                                  3
                                                   Peak Flow (m /s)
                                    AEP (%)
                                                   Post Development

                                    50 (Q2yr)       0.082 (20min_10)

                                    20 (Q5yr)       0.120 (10min_5)

                                    10 (Q10yr)      0.132 (30min_3)

                                    5 (Q20yr)       0.151 (30min_3)

                                    2 (Q50yr)       0.161 (15min_8)

                                    1 (Q100yr)      0.175 (15min_8)

                      Table 4.4 – Post-Development (mitigated) Peak Flow Rate Results


As can be seen in Tables 4.3 & 4.4 the post-development peak flow rates to the existing drainage system
compare well to that of the existing pre-development site discharges. This is due to the large volumes of
on-site detention proposed to be included as part of the development.

Page 14

SC-8407 – 45 Maple Street, Cooroy                                                            11



5.0 Flood Hazard Overlay and External Catchment
The subject site is not affected by regional flooding impacts.




6.0 Conclusions
This report has outlined a total water cycle strategy to be adopted in the construction and operational
works phase of the development which satisfies State and Council planning scheme policies.


        Rainwater harvesting and re-use is adopted to reduce the demand on Council’s existing
         infrastructure;
        Best practice and practical water quality improvement methods;
        60kL of peak flow mitigation volume is required of the development; and
        Formalisation of drainage regimes in accordance with QUDM including inter-allotment drainage
         and dedicated drainage easements.

Page 15

SC-8407 – 45 Maple Street, Cooroy                             12




 APPENDIX A – CONCEPT STORMWATER MANAGEMENT PLAN
                                             AND
                                    DETAIL & CONTOUR SURVEY

Page 16

                                                                                                                                                                                                                                                                                                                                                                  LEGEND




                                                                                               MC




                                                                                                                       MC
                                                                                                                         MC
                                                                                                                            MC
                                                                                                                              MC
                                                                                                                                   MC




                                                                                                                                                                                                                                                                                                                                                                     Project North:




                                                                                                                                                                                                                                                                                                                                                                                                        N
                                                                                                                                                                                                                                                                                                                                                                     Scales:
                                                                                                                                                                                                                                                                                                                                                                           0        2       4    6      8   10m       1:200 at A1
                                                                                                                                                                                                                                                                                                                                                                      A
                                                                                                                                                                                                                                                                                                                                                                                                                      1:400 at A3


                                                                                                                                                    CONCEPT STORMWATER MANAGEMENT PLAN                                                                                                                                                                                  Status:




                                                    NOTES                                                                                                                                                                                          Client:   GRAEME JONES              Designed:   SFD      Drawn:      TAK         Title:                                        Date:    MARCH 2020        Scale:  AS NOTED
Issue                  Amendment   Date       Dft   1. This is the property of the engineer, and may not be                                                       Sunshine Coast Office                     Bundaberg Office
  A
  B
        FOR APPROVAL
        FOR APPROVAL
                                   19.03.20
                                   24.03.20
                                              TAK
                                              TAK
                                                       used, copied, or reproduced wholly, or in part without the
                                                       express permission of the engineer. Infringement in any
                                                                                                                                                                  L2, 13 Norval Court Maroochydore Q 4558
                                                                                                                                                                  PO Box 102 Mooloolaba Q 4557
                                                                                                                                                                                                            66A Barolin Street Bundaberg Q 4670
                                                                                                                                                                                                            PO Box 2052 Bundaberg Q 4670
                                                                                                                                                                                                                                                   Project: PROPOSED MEDICAL CENTRE    Approved:                                             CONCEPT STORMWATER                           Job Ref No:        Drawing No:  Issue:
                                                       way may result in legal action.                                                                                                                                                                       45 MAPLE STREET, COOROY
                                                    2. Figured dimensions take precedence over scaled.
                                                    3. Verify all dimensions on site.                               ACN 112761510 ABN 21112761510
                                                                                                                                                    Engineering   P: 07 5477 6437
                                                                                                                                                                  E: [email protected]
                                                                                                                                                                                                            P: 07 4154 4894
                                                                                                                                                                                                            E: [email protected]                                                                                             MANAGEMENT PLAN                            SC-8407                C001                 B
                                                                                                                                                                                                                                                                                                         GAVIN EVANS / RPEQ: 8054

Page 17

PROPERTY DESCRIPTION                                                                                                                                                                                                                  NOTES                                                                                                         NOTES

LOTS 15 & 18 on C5605 &                                                                                                                                                                                                               (1) This plan was prepared for the purpose and exclusive use of                                                (5) Spot heights and contours are representative of the
                                                                                                                                                                                                                                      Dr DREW McMENAMIN and his other professional advisers and is                                                   topographical terrain at time of survey, 22/10/2019.
LOT 1 on RP99323                                                                                                                                                                                                                      not to be used for any other purpose or by any other person or
LOCALITY of COOROY                                                                                                                                                                                                                    corporation.                                                                                                   (6) Spot heights are not shown on this plan. Refer to the AutoCAD
                                                                                                                                                                                                                                      JFP URBAN CONSULTANTS PTY LTD accepts no responsibility for                                                    drawing for all spot heights and codes in frozen layers: X-RL-T,
LOCAL GOVERNMENT:                                                                                                                                                                                                                     any loss or damage arising to any person or corporation who may                                                X-CODE-T & X-NOTES-T.
NOOSA SHIRE COUNCIL                                                                                                                                                                                                                   use or rely on this plan in contravention of these terms.
                                                                                                                                                                                                                                                                                                                                                     (7) These notes form an integral part of this plan. If others use this
TOTAL AREA 2868m² (Deed)                                                                                                                                                                                                              (2) The title boundaries shown on this plan were not marked at                                                 information, they should be advised of its purpose and limitations.
                                                                                                                                                                                                                                      the time of survey and have been determined from recent
                                                                                                                                                                                                                                      adjoining surveys. While the boundaries shown are a better                                                     (8) This plan may not be reproduced unless these notes are
                                                                                                                                                                                                                                      approximation than the subject survey plans (dated 1909 & 1962),                                               included.
                                                                                                                                                                                                                                      an Identification Survey is required to accurately determine
                                                                                                                                                                                                                                      boundary dimensions.                                                                                          12d Project: S:\M2815\McMenamin - Cooroy\12D\contour survey
                                                                                                                                                                                                                                                                                                                                                    LM 221019\contour_survey_LM_221019.project
                                                                                                                                                                                                                                      (3) " Dial Before You Dig " search has not been carried out, and
                                                                                                                                                                                                                                      Position of Underground services and utilities not obtained.                                                   Contour Interval: 0.5m

                                                                                                                                                                                                                                      (4) Prior to any demolition, excavation or construction on the site,
                                                                                                                                                                                                                                      the relevant authority should be contacted for detailed locations
                                                                                                                                                                                                                                      of all services.




                                                                                                                                                                                                                                                                                                                                                                                           LEGEND
                                                                                                                                                                                                                                                                                                                                                                                                      BLOCK RETAINING WALL

                                                                                                                                                                                                                                                                                                                                                                                                      TOP of BANK

                                                                                                                                                                                                                                                                                                                                                                                                      BOTTOM of BANK/CHANGE GRADE

                                                                                                                                                                                                                                                                                                                                                                                                      APPROXIMATE BUILDING
                                                                                                                                                                                                                                                                                                                                                                                                      LOCATION FROM AERIAL PHOTOS




                                                                                                 NORTH:       SCALE:                                                                                       ISSUES:                                                   TITLE:                                                                                                                                DETAILS:
                                                                                                                                                                                                                                                                                                                                                                                                           PROJECT:                        PLAN:           ISSUE:
                                                                                                          N   SCALE: @ A3 1:300
                                BRISBANE - SUNSHINE COAST - CENTRAL QLD PLANNERS                              0         2.5         5         7.5        10         12.5        15       17.5        20
                                                                                                                                                                                                                                                                       CONTOUR SURVEY                                                                                                                       M2815                       01                  A
                                                                                                              SCALE 1:300 at (A3) size                                                                                                                                                                                                                                                                      SHEET:
                                                                          URBAN DESIGNERS
                                SUNSHINE COAST
                                Tower 1, Level 2, 55 Plaza Parade,
                                Maroochydore, Qld 4558
                                                                          SURVEYORS
                                                                                                              THIS SCALE SHOWN IS ORIGINAL DRAWING SCALE - (A3 SIZE)
                                                                                                              DO NOT SCALE FROM THIS DRAWING - USE ONLY DIMENSIONS PROVIDED - IF IN DOUBT PLEASE ENQUIRE
                                                                                                                                                                                                                                                                       Dr DREW McMENAMIN                                                                                                                    1 OF 1
                                                                                                                                                                                                                                                                                                                                                                                                           FILE:
                                P 07 5450 3900 W www.jfp.com.au           ENGINEERS
                                                                          LANDSCAPE ARCHITECTS
                                                                                                              SURVEYED        LM        CHECKED       MC
                                                                                                                                                              HORIZONTAL DATUM:
                                                                                                                                                                   RP867327                                A         ORIGINAL ISSUE        24-10-2019        SCP
                                                                                                                                                                                                                                                                   9 MYALL STREET & 45 MAPLE STREET                                                                                                        M2815-01A Contour.dwg
                                                                                                                                                                                                                                                                                                                                                                                                           DATE:
    C O N S U L T A N T S JFP URBAN CONSULTANTS PTY LTD ACN 050 414 045
                                                                                                                                                                                                                                                             INIT: COOROY
                                                                                                                                                              VERTICAL DATUM:
                                                                                                              DRAWN           SCP       APPROVED      MC          PM54011_RL 114.880 AHD                   ISSUE:    DETAILS:               DATE:                                                                                                                                                           24th October 2019
                                                                                                                                                                                                                                                        COPYRIGHT © 2018 JFP URBAN CONSULTANTS PTY LTD. THIS DOCUMENT MAY NOT BE COPIED OR TRANSMITTED IN ANY FORM OR BY ANY MEANS IN PART OR IN WHOLE WITHOUT THE WRITTEN CONSENT OF JFP URBAN CONSULTANTS PTY LTD.

Page 18

SC-8407 – 45 Maple Street, Cooroy                 13




              APPENDIX B – XP STORM MODELLING RESULTS


[OCR of page images]
SC-8407 — 45 Maple Street, Cooroy 13

 

APPENDIX B — XP STORM MODELLING RESULTS

 

= e
= Empire

Page 19

SC-8407 – 45 Maple Street, Cooroy                                              14




                                           Catchment A




                        Figure B.1 – XP-STORM Pre-Development Catchment Plan

Page 20

SC-8407 – 45 Maple Street, Cooroy                                                15




                   Figure B.2 – XP-STORM Pre-Development Peak Flow Hydrographs




              Figure B.3 – XP-STORM Pre-Development Peak Flow Hydrograph (50% AEP)

Page 21

SC-8407 – 45 Maple Street, Cooroy                                                16




              Figure B.4 – XP-STORM Pre-Development Peak Flow Hydrograph (20% AEP)




              Figure B.5 – XP-STORM Pre-Development Peak Flow Hydrograph (10% AEP)

Page 22

SC-8407 – 45 Maple Street, Cooroy                                                   17




              Figure B.6 – XP-STORM Pre-Development Peak Flow Hydrograph (5% AEP)




              Figure B.7 – XP-STORM Pre-Development Peak Flow Hydrograph (2% AEP)

Page 23

SC-8407 – 45 Maple Street, Cooroy                                                   18




              Figure B.8 – XP-STORM Pre-Development Peak Flow Hydrograph (1% AEP)

Page 24

SC-8407 – 45 Maple Street, Cooroy                                                19




                                     Catchment C
                                                            Catchment D




                       Catchment B




                        Figure B.9 – XP-STORM Post-Development Catchment Plan




                     Figure B.10 – XP-STORM Post-Development Hydrograph Outlet

Page 25

SC-8407 – 45 Maple Street, Cooroy                                               20




            Figure B.11 – XP-STORM Post-Development Peak Flow Hydrograph (50% AEP)




            Figure B.12 – XP-STORM Post-Development Peak Flow Hydrograph (20% AEP)

Page 26

SC-8407 – 45 Maple Street, Cooroy                                                21




            Figure B.13 – XP-STORM Post-Development Peak Flow Hydrograph (10% AEP)




             Figure B.14 – XP-STORM Post-Development Peak Flow Hydrograph (5% AEP)

Page 27

SC-8407 – 45 Maple Street, Cooroy                                                22




             Figure B.15 – XP-STORM Post-Development Peak Flow Hydrograph (2% AEP)




             Figure B.16 – XP-STORM Post-Development Peak Flow Hydrograph (1% AEP)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.