Delegated Report - Code - Engineering OPW23 0175 [As Published] · OPW23/0175
GENERAL CONDITIONS
Engineering
3. A revised Construction Management Plan (CMP) must be submitted to Council prior to the
pre-start meeting. Note that due to the location of the site Council is unlikely to support
excessive construction vehicles parking along Seaview Terrace. The revised CMP must
specifically address the following:
a. Traffic Management during all aspects of the construct phase including:
i. A Traffic Management Control Plan in accordance with Manual of Uniform Traffic
Control Devices (MUTCD) detailing all temporary signage and traffic control
measures prior to construction.
ii. Maintenance of safe pedestrian access across the frontage of the site both during
daily construction and after daily construction has ceased. Note that pedestrian
access along Seaview Terrace including but not limited to the public beach
access must be maintained at all times.
iii. Proposed fencing to the site during the construction phase of the development.
iv. Adequate parking arrangements for construction workers. Note that public and
emergency vehicle access along Seaview Terrace must be maintained at
all times. Construction vehicles are to abide by parking rules and
regulations and are not to block resident’s driveways or park on yellow line
marking under any circumstances. The revised CMP must provide an
alternative carpark location and transportation for construction vehicles
should public carparks be occupied.
v. No queuing of trucks is permitted on residential streets, especially prior to
7.00am. Further parked trucks must have engines turned off.
b. Maintenance and protection of water quality and existing drainage lines through the
construction site through the implementation of appropriate erosion and sediment
control measures.
c. Works programme identifying key components of the works and their respective
durations.
d. Establishment of a communication protocol with the general public, adjoining owners,
emergency services and local businesses to advise of agreed construction times,
impacts on traffic and services and other relevant issues.
e. Include a post out to the local residents and businesses advising of the proposed
development, the expected time frames and the site contact details.
f. Include signage in prominent locations on the boundaries of the site advising of the
proposed development, the expected time frames and the site contact details.
g. identification of complaint management procedures including:
i. Contact details for the on-site manager
ii. Dispute resolution procedures
h. For haulage operations involving significant volumes of fill material or excavated
material being transported onto or off the site: details on the location of external fill
sites/sources, the haulage route, type of vehicle to be utilised during filling operations
and frequency of usage. NB any damage to the existing road system as a result of
haulage operations shall be fully repaired at the applicant’s expense.
4. A condition report including photographs of the frontage of the site must be completed and
submitted to Council at the prestart meeting.
Page 6 of 10
Document Set ID: 22700693
Version: 8, Version Date: 13/12/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Delegated Report - Code - Engineering OPW23 0175 [As Published].pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.