NEOLOKy We Checklist - Applications Involving Land
Development & Land Use Sections

 

IDAS APPLICATION

This checklist should be used for any IDAS application. Please check each of the following items before accepting an
application at the counter.

wat Lem eee

4. APPLICATION FORMS
1.1 Form 1 PartA

 

4.1.1. Ensure that the form is fully completed.

 

 

 

1.1.2 In the case of an MCU or Op Works below the high-water mark, owners consent is required.
4.1.2.1 If there are multiple owners, the consent of each owner is required.
4.1.2.2 If the owner of the land is a company, either ACN No. or Company Seal required.
4.2. Form1 Part B-O Supporting information
1.1.2 Ensure that for each box checked on Form A, the relevant additional Forms B-O are attached. (74
4.1.2.1. Ensure that each of Forms B-O which are attached are fully completed. [A
cA

2. REFERRAL INFORMATION. ~_ me ram stems owe ae mm ee ne
2.1 Ensure that items 1-23 have been checked and/or completed with regard to referrals.

ck i ee rere oe . ae

 

 

‘¢ “ENVIRONMENTALLY RECEVANT ACTIVITIES.
3.1. Ensure that Part G is completed if EPA referral is required.

 

 

3.2 Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application
fee is paid and recorded on the application.

 

 

 

 

 

 

 

 

 

4, " FORM 2 REQUEST TO CHANGE APPROVAL “7 "3. E T A
4.1 Ensure that items 1-28 have been checked and/or completed including information regarding
applicant details and owners consent. Lf
5. PLANS 0 ER SIME es Bo oes
5.4 Ensure that at least 6 sets of the Plan of Development (5 for Reconfiguration and Operational a
Works) accompanies the application. In addition ensure that each set is complete.
§.2 Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format and is -
unbound.

 

en ee fee ee sae kate ates

6. SUPPORTING INFORMATION 70" SLT le a ee Oat
6.1. Ensure that at least 6 copies of any report accompanies the application (5 for Reconfiguration
and Operational Works). If the application is accompanied by a covering letter, ensure that it is

capable of reproduction. (-]
6.2 In the case of reports, ensure that 1 of the copies ts in an A3 or A4 format and is unbound. =

 

 

 

 

LED PRPS nh canieysye merme ee eee myn mem agama ramets samy, ek Ho ae ete

      

 

 

Te OEE ee ee cael tenance arc inert ie Bb a a EE, hg a
7.1 Ensure that the application fee, as determined from the Council's adopted scate of fees,
accompanies the application or has been paid. 7

 

 

7.2 Ensure that the fee which has been paid is recorded on the application form.

Receiving Officer CZ

 

 

7

  

Having completed this form and accepted the applicatio9, please deliver both to the following IDAS Application Receiving

trays:- .

« — Ifthe application is for a Material Change of Use exclusively —-AOP1's desk in the Land Use Section.

« — Ifthe application is for an Material Change of Use & Reconfiguration - AOP1’s desk in the Land Use Section.

¢ If the application is for Operational Works (for parking, access, sewerage or drainage) exclusively - AOD2 in the
Land Development Section.

¢ Inall other circumstances — AOP1’s desk in the Land Use Section.

Please DO NOT leave the application at the counter and DO NOT deliver the application to Records.

 

 

SEP! g:\ant\Yforms\application checklist.doc

 
Full text of the other 23 pages

Page 2

PILE-IT Pty Ltd

‘Trading as
Noosa Jetty Builders
LETTER ABN: 55099036736
No: 0046 BSA: F111115
DATE:3/04/2008

FROM: Noosa Jetty Builders

PO Box 299 Phone: (07) 5474 3480

Noosaville Fax: (07) 5474 3480

QLD, 4566 Mobile: 0408 137 526
TO: Trish Sweeney
Sunshine Coast Regional Council
Noosa Office
Pelican Street
Tewantin, Q 4565
Contact No: 54 495 293

RE:

Dear Trish,

Due to an oversight on my part the boat storage device shown on the attached plan
was not assessed under the recent jetty application. Could you please assess the boat
storage device as discussed in our previous phone conversation.

Attached is 4 plans one being the original approved jetty plan, the other a copy of the
site plan from the approved plans, plus 2 copied of the proposed boat storage device.

In regards to the application fee | have submitted as discussed payment of the reduced
fee of $650 & I thank-you for this relaxation.

[f you require any further information regarding this application please contact me on

the above numbers.

Yours Sincerely,

Emma Reed
(Managing Director)

ot/U1F

Page 3

INTEGRATED PLANNING ACT 1997

Part A, Version 3.1, 3 March 2008

Common details

 

  
    

Rpphicant Gelails (ihe App 24 5 the p's07 reiponsh «for Moki Ho appsccuOn and red not be the owner of the land. airs f cant st the
jremneran pra.ited wh (Fs IDAS Ape cotion Form it correct Thes intonatortss read upon by ing Assessment Manager and any referral egenaies wins atsessine amt
ideciceng this snpicanon By ledeng thes appherton, tne App.cone Neuss the ob’ qasors and respons.b:.t.319 preserhed by the PA Any deselopme-s pera of presat-nary
lepprovad that may be issued 1s 2 consequence of ths oprwe.dh Wo BS nisucd te the Apsticent}

   

     

 

 

 

 

 

Company/organisation name (if applicable) [Pe-IT Pty Ltd t/a Noosa Jetty Builders

 

Individual applicant/Contact person (if there is more than one applicant, provide additional applicant details on an attachment to this farm)

[PO Box 299, Noosaville, QLD 4566

 

Title Lastname {Reed

 

 

 

 

Postal address

 

 

 

 

 

Contact telephone number [07 5474 3480 Mobile phone number (0408 137 526
Facsimile number 07 5474 3480 e-mail address [email protected]

 

 

 

Details of the premises (' the ind on which the devr‘opment is propased _efer to the advice at tne end of the form)
1. Identify the premises by completing Table A, or Table B and/or Table C (ensure adequate information is given to identify the premises)
Table A Ifthe application is for a mobile and temporary Environmentally Relevant Activity (ERA), complete Table A only. Then go to Q2.

| 1
OR
Table B Street address for the premises (tick applicable box/es below and insert property description in the table. Identify each lot in a separate row.)

(i)

“|

 

“Name of each local government area in which the mobile and temporary ERA is proposed to operate

 

 

 

 

[] Street address / lot on plan for the premises (Appropriate for most applications including building applications); Ot

DX] Street address /lot on plan for the land adjoining or adjacent to the premises (Appropriate for development in water e.g. jetty.
pontoon etc) (Note: Loton plan details may be obtained from title documents, a ‘Rate’ notice, or from the local government, )

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Thi | Sree Street Address - sors eT Local governhent ar area ale g. Logan,
No. | No Street Name and official suburbhacalty name — | Post Code} Lot No. Plan Number Caitns) “e
L 41 27 Masthead Quay, Noosaville. QLD 4566 603 RP 883862 Sunshine Coast regional council
AND/OR
TableC Coordinates and/or a map of the premises (Appropriate for development in remote areas, over part of a lot, in water (e.g. channel dredging in Moreton
Bay) etc.)
— “~— Coordinates eee .
(Nola: piace eath sal of cnordinales in a saparaie row) Zone Daturn Loca! government area
Easting Nosthing Latitude Longitude Reference ifapplicable) -
1 (DF oepags
CO weses
D Other -

 

 

 

 

 

 

 

 

 

 

2. Identify if any of the following apply to the premises by completing Tables D, E, or F. (Note: in most instances, the premises will not involve any of
the fotlowing characteristics, however some applications may involve one or more of these characteristics - complete only if applicable)

 

Page 4

INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008
Table D Complete if the premises ai are @ adjacent tc to or associated with a water body, watercourse or aquifer fg iver, creek, lake, cane

~ Name of water body, watercourse or aquifer (if known) 4

 

 

| 1 Noosa Waters

 

Table E Complete if the Premises are on Strategic Port Land under the Transport Infrastructure Act 1994

 

 

 

 

 

 

 

 

~ Lotonplan description for strategic portland =| srt Authorityforthe ot
i a . etna een
Table F Complete if the premises are in tidal water
| Name of local government for the tidal area (if appicable) Name of port authority for the tidal area (?f applicable)
li

 

3. Indicate the total area of the premises on which the development is proposed: (Note: The total area may include fand both above and below water)

 

Total area of premises _

 

800.00 Bim? [hectares (Tick applicable unit)

 

 

 

 

 

‘Existing use of the premises ]

 

4. — Current use/s of the premises: (e.g. vacant land, house, townhouses, apartment building, shop, service station, school, sugar cane farming etc.)

oy J

5. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overland flow, water etc.)?

 

& No oO Yes - Ensure the type, jacation and dimensions of each easement are included in plans, submitted with the application
Proposal details . j
6. Brief description of the proposal (e.g. 6 unit apartment building, 30 lot residential subdivision, a bore, aquaculture)

 

 

Pneumatic boat storage device

 

 

 

7. Does the poposal include new buildings or operational work (including any services) on the premises?

No RX Yes - Ensure the nature, location and dimensions of the proposed works are included in plans, submitted with the application

 

fResource entitlement jieppscabie). . further ndormstionas prov.tod.in the. advice section..at the-and.of dhe form : |

 

8. Does the application involve taking or interfering with a State resource and therefore require a resource entitlement? (e.g. the application
involves State land (leased and freehold), declared Fish Habitat areas, taking quarry material, taking or interfering with water under the Water Act 2000, etc.)

mR No -Goto.Q9 oO Yes - Complete Table G - provide details for each evidence required an a separate row, if applicable. Evidence of resource
allocation or entitlement must be submitted with the application. You do not need to answer Q9 - go to the next section.

 

(Owner's consent Mf apehceble)  furthar snlotkiation provided 1 the edvice section at the wrxt of te farm }

9. Complete Table H for applications involving a material change of use; reconfiguration of a lot; work on land below high-water mark and
not within a canal as defined under the Coastal Protection and Management Act 1995, or work on rail corridor land defined under the
Transport Infrastructure Act 1994 - provide details for each owner an a separate row, or on an attachment to this form if applicable,

 

 

 

Premises Owner's namels ~ Details of the premises owned . . | Dateconsent |
Table H and postal address (street address or fot on plan description} Owner's signature was obtained |
1 Jetter Pty Ltd 27 Masthead Quay, Noosaville. QLD 4566 05/02/2008

 

 

 

 

 

 

 

* Owner's signature cannot be provided on the form if you intend to submit the application electronically. Owner's consent must be provided to the assessment manager on an
attachment containing appropriate written documentation of the owner's consent. If the owner is a company, $127 of the Corporations Act 2001 (Cwealth) details how a
company may sign as owner. Templates for the provision of owner's consent are available on the [PA website .

 

iitachments and supporting information (Compyis Feb Use a septate réw for each lypd of attactrnent or korirstinn nckecting arformstion requitelt
this Par) Please ensure al documeniation submited with this fortn, including ether Parts of Fon 1,.0f owner's consent, el6, are securely attached to this Part of thé Farm,

 

 

 

 

~~ Description of attachment or information =|. Title a picable) | Method od
ppicable} _ Method of delivery to to
Table | {eg Pan mc of "Fenn vs oer pecans mn vance {e.g General Autonty James Stout Report} Date assessment manager’!
Part E : 07-Apr-2008 | over the counter

 

 

 

 

 

 

 

2 Check fist 07-Apr-2008 | over the counter

 

Page 5

INTEGRATED PLANNING ACT 1997 Pait A, Version 3.1, 3 March 2008
[3 [Plans | [07-Apr-2008 over the counter |
Portable Long Service Leave (PLOL) levy (aggscat= ta cats nbw arg end consa*an work v.tuad over $6200 OY? |
10. The Portable Long Service Leave Levy (PLSL) is not applicable to this application if any of the following apply: ( Tick box if applicable)
(1 the application seeks a preliminary approval only;

(77 the application is not for building and construction work under the Building and Construction Industry (Portable Long Service
Leave) Act 1991, section 3AA (e.g. the application is only for a change of use, or for the following types of work carried out solely for
farming purposes: land clearing, site preparation, earthworks, fences, fodder harvesting. clearing of encroaching vegetation, clearing of

regrowth, thinning vegetation or controlling weeds or pests);
[X) all costs, that relate to the work both directly and indirectly, are less than $80,000, inclusive of GST, or

[1 the work is being carried out under an owner-builder permit issued under the Queensland Building Services Authority Act 1991 -
Complete and submit a QLeave Notification and Payment Form (no payment required if owner-builder permit number stated). The receipted form must be
sighted by the assessment manager before a development permit can be given.

11. Is payment of a PLSL levy applicable to this application? (Refer to Q10 and the Advice below for more information)?

Bd No - End of Part A

 

 

@ (1s Yes - Answer Q12 below
OFFICE USE ONLY (For use by the Assessment Manager / Private Certifier) (Optional)
. Receiving officer's Reference
Fee ($)} |, 0 | Date received 3\4) ov name PS numbers | © t ko uA

 

 

 

 

 

 

 

 

 

 

NOTIFICATION OF ENGAGEMENT OF PRIVATE CERTIFIER

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

To: Council. | have been engaged as the private certifier for the building work referred to in this application.
“geaet | —_ : Nome oo BSA Ceftiication nubs Building classi icons |
} engagement 2 co
e@ QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager or private certifier if applicable)
Se - — = aS — —
a. . , . form sighted by | Name of officer who sighted the |
Description of the work QLeave Project Numbes jAmount paid (§}} Date paid fom :
1
Privacy Statement

The information collected on Form 1 will be used by the Department of Infrastructure and Planning (DIP) in accordance with the processing and assessment of your Application.
Your personal details will not be disclosed for a purpose outside of the IDAS process, except where required by legislation (including the Freedom of information Act 1992) or as
required by Parliament. This information may be stored in a DIP database. The information collected wil be retained as required by the Public Records Act 2002.

 

Advice for completing Part A

General advice

fe Part A of IDAS Development Application Form 1 must be completed and accompany all development applications. The applicant is responsible
for answering al! questions fully and correctly, unless following a response there is a statement to go directly to another question. The
Assessment Manger may refuse to receive an application that is not property made.

le The IDAS Assessment Checklist must also be completed for all development applications, other than those requiring assessment against the
Building Act 1975 only, i.e. those applications requiring the completion of Parts A and B only.

 

 

Applicant details
e If the applicant is a company or organisation, a contact person must be nominated. The applicant's signature is not required to be provided

under the IPA.

 

 

 

 

Page 6

INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008

 

Details of the premises

The term ‘premises’ is defined by the IPA, schedule 10 to mean a building or other structure, and land (whether or not a building or other

structure is situated on the land). The term ‘land’ is also defined to include the estate in, on, over or under the land.

Details of the land are not required if the application involves @ mobile and temporary Environmentally Relevant Activity only. instead complete

Table A.

The premises may be identified in a number of ways —

* Street address and Jot on plan are most common and will apply to most applications.

« Coordinates may provide the best means of accurately identifying the location of development proposed i in waters, or on a relatively small
development site distant from property boundaries on a large tot. Sufficient coordinates need to be provided to identify the boundary of the
premises the subject of the application. Eastings and northings using GDA94 datum is preferred, but ongitude and latitude and other
(specified) datum such as Zone Reference or GS84 may be provided.

The definition of ‘water body and ‘watercourse’ can vary from Act to Act

StrategicPortLandis within a local government area but a local government's planning scheme does not apply onStrategicPortLand.

StrategicPortL andis declared under the Transport infrastructure Act 7994. For further information go to DAS Guide 11 (Development on

strategic port land) and the Queensland Transport (Ports) website.

“Tidal water is defined in the Coastal Protection and Management Act 1995 (Schedule) and ‘tidal area’ for a local government and for strategic

port land is defined in the IPA (schedule 10). Generally, the area below ‘high-water mark’ (defined by the Coastal Act in relation to high water

mark at spring tides) establishes the boundary of a tidal area. Land below high water mark is not within a local government's area unless
provided for under the Local Goverment Act 7993. Unless otherwise provided for by legislation, a local government has no jurisdiction below
high water mark. A tidal area for strategic port land is within the jurisdiction of the relevant port authority, while the Environmental Protection

Agency generally has jurisdiction for a local government tidal area. However, the IPA gives local governments jurisdiction for assessing and

deciding applications for prescribed tidal works within the local government tidal area, and the planning scheme may be applied to that

assessment (to the extent provided for in the code for prescribed tidal work).

 

Resource entitlement

Section 3.2.1(5) of the IPA requires evidence of resource entitlement be given for applications if they involve taking or interfering with a
prescribed State resource. Schedule 10 of the integrated Planning Regulation 1998 (IPR) prescribes the State resources, including State-
owned fand, where evidence is required to be given, and the evidence required to support the application. Link to Integrated Planning
Reguiation. Section 3.2.1(10){a}{ii) states an application cannot be taken to be properly made without the required evidence.

For applications involving the taking or imterfering with water under the Water Act, the development application may be made at the same
time as the request for resource entitlement, and the Department of Natural Resources and Water will accept the application as properly made.
For State-controlled roads, a resource entitlement is not required for an activity that is exempt ancillary works or encroachment (identified by
gazette notice under the Transport Infrastructure Act 1994, section 50), or if the activity requires referral to the Department of Main Roads.
Evidence may be required from more than one Department responsible for a State-owned resource, e.g. from the Environmental Protection
Agency for quarry material below high water mark, and the Department of Natural Resources and Water in relation to the State-owned land
above high water mark.

 

Owner's consent

Section 3.2. 1(3} of the IPA prescribes that an application must contain, or be supported by, the written consent of the land owners, if the
application involves: a material change of use; reconfiguration of a lot; work on land below high-water mark and not within a canal as defined
under the Coastal Protection and Management Act 1995, or work on rail corridor land defined under the Transport infrastructure Act 1994.
Evidence of this consent may need to be provided before the application will be accepted as properly made by the Assessment Manager, during
the processes of the application or in the event of an appeal about the outcome of the application.

“Owner for the purpose of a lodging an iIDAS development application means the person at the time of lodging the application, entitled to
receive the rent for the fand (or would be entitled to receive the rent for it if it were let to a tenant at a rent).

Templates are available from the IPA website for the provision of owner's consent as an attachment to this form. However other documentation
may be used for providing owner's consent provided it is clear the documentation relates to the development application for the premises.
Owner's consent, if required, must be provided even if the applicant is the owner. Owner's consent is not required for a mobile and temporary
ERA.

 

Portable Long Service Leave (PLSL) Levy

 

The Building and Construction Industry Portable Long Service Leave Scheme provides long service leave entitlements to workers in the building
and construction industry who would be unlikely to accrue enough service with one employer to qualify for long service leave. To fund the
scheme, a Portable Long Service Leave Levy (PLSL levy) is collected on certain building and construction work carried out inQueenstand.

The PLSL levy amount and other prescribed percentages and rates for calculating the levy are stated in the Building and Construction Industry
(Portable Long Service Leave) Regulation 2002. Included in the amount collected by QLeave is the Workplace Health and Safety Fee and the
Building and Construction IndustryTrainingLevy.

The Building and Construction industry (Portable Long Service Leave) Act 1997 (PLSL Act) defines the building and construction work subject to
the PLSL levy and includes renovating, relocating, constructing, altering, demolishing, maintaining or repairing buildings, pools, roads, jetties,
pipelines, fences or earthworks, and works for subdividing, irrigating or draining land.

The PLSL levy need not be paid when the application is made, but the PLSL Act requires the levy to be paid before a development permit may
be issued.

The Assessment Manager must sight an approved form issued by QLeave advising of the status of the payment of the PLSL levy. Building and
Construction Industry Notification and Payment Forms are available from anyQueenslandpost office or agency, on request from QLeave, or can
be completed on the QLeave website at www.qleave. qld gov.au. For further information contact QLeave (Tet: 1800 803 481 Web:

www. gleave. qld.gov.au }

 

 

Page 7

INTEGRATED PLANNING ACT 1997

Part E, Version 3.1, 3 March 2008

 
   

_Form 1 Development Application

Part E

Building &/or operational works assessable
against a planning scheme

 

 

 

 

[Nature of the works
1. Nature of work that requires assessment against a planning scheme:
([] Building work - Complete Table A [X] Operational work - Complete Table 8
Table B
(i) What is the nature of the operational work?

([] Roadworks ([] Stormwater {([) Water infrastructure [1] Sewerage infrastructure
{_] Landscaping (FD Earthworks [] Drainage Works C1 Signage
[L] Clearing vegetation under the planning scheme DX] Other - Specify below

 

 

 

Boat Storage Device

ii) What type of approval is being sought? (NOTE: if you have indicated multiple operational works in question (i) above and your answers to this
yo! pel q x
question would be different for different operational work, it may be more appropriate to provide these details in an attachment to this form}

[EX] Development Permit [] Preliminary approval [J] Both (Specify betow)

 

 

(iii) 1s the operational work necessary to facilitate the creation of new lots (ie. subdivision)?
[XJ No —_[_] Yes - Specify the number of lots being created

(iv) Are there any current approvals associated with this application? (e.g. Development Permit or Preliminary Approval for MCU or reconfiguring
alot)
—X] No (_] Yes - Complete Table B(a)

 

 

 

 

 

 

 

 

2. Whatis the dollar value of this operational work? (Le. the total value including GST, materials and labour) |$ 10000
jandatory Information 4 wo, . so. : . |
3. Confirm that the following mandatory information accompanies this application
Confirmation of [oy eri cant
lodgement — Method of lodgement

 

 

Plans, andspecifications if applicable, showing the nature and location of the proposed works finchuding the
extent of any cut and fit) K Confirmed over the counter

 

 

 

 

 

OFFICE USE ONLY

 

 

 

Date Received Reference Numbers i

 

 

Advice for completing Part E

l.

General advice
Part A must also be completed for all IDAS development applications.
The applicant is responsible for answering ail questions fully and correctly, unless following a response there is a statement to go directly to another question.

 

(oa)

 

 

A development permit authorises development to occur, while a preliminary approval is a step in the approval process and does not authorise development to occur,

 

Page 8

IDAS Assessment Checklist, Version 21.2, 31 March 2008

   
 
   

velopment Application

IDAS

Assessment Checklist

 

boas Development Application Form 1 is the approved form for all development applications under the Integrated Planning Act
19971PA). Form is made up of various Parts.

Part A {Common details) of Form 1 must be corepleted for all applications. The refevance of other Parts of Form 1 depends on
the nature of the application.

Form 1 also includes the IDAS Assessment Checklist, which is used to assist in determining State assessment and referral
requirements, and the Parts of Form 1 retevant to the application.

Section 1 and afl other relevant sections of the IDAS Assessment Checkilst, as identified in the Table below, must be
completed for all development applications except those proposed on land in-an urban development area, or for building work
requiring assessment against the Building Act 1975 only.

For more intormation about development applications on land in an urban development area, refer to www,ulda.qid gow au,
For more advice about building applications refer to Part B of the IDAS Application Form.

 

 

Answering the following questions will assist you in determining which sections of the checklist must be completed for your application.

 

For all DAS development applications (except those for building wark requiring assessment against the Building Act 1975 only) - complete Section 1 af this
checkist

 

Does the application seek approval to materially change use of the premises?

 

 

 

if yes - complete Section 2 of this checklist CYes |PNo
Does the application seek approval to reconfigure a lot? Ces |BNo
if yes - complete Section 3 of this checklist and Part F of IDAS Application Form 1. Assessment is by the local government.

Does the application seek approval to carry out operational work?

if yes - complete Section 4 of this checklist Yes /[]No
Does the application seek approval to carry out building work requiring assessment against the Fisheries Act 1994? Ces | INo

if yes - complete Section 5 of this checklist

 

Have you received a referral agency response under section 3.3.2.0f the IPA, in relation to this development application?
if yes - complete Section 6 of this checklist. C1Yes |EXNo

 

Does the application seek approval to carry out building work requiring assessment against a local government planning
scheme? KlYes |(JNo
if yes - complete Part E of (DAS Application Form 1. Assessment is by the local government.

Does the application seek approval to carry out building work requiring assessment against the Building Act 1975?
if yes - go to Appendix 1 of this checklist for advice on building referrals. Complete Part B of IDAS Application Form 7. Yes |KjNo

 

 

 

 

 

Assessment is by a building certifier

 

 

jp “(> tle. 7 Section 1 must be compteted for a3 epplications that require completion of the IDAS Acsessment Checklist

 

 

 

[HERITAGE " !

11 Answer both A and B below.
A Is any part of the proposal intended to be carried out on a Queensland Heritage place under the Queensland Heritage Act
1992?

EX] No-Gotos [1] Yes

 

Page 9

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.2, 31 March 2008

B Does the proposal involve development, other than development mentioned in the /ntegrated Planning Act 1997 Schedule 9
(development that is exempt from assessment against a planning scheme), that is intended to be carried out on a place entered

in a Local Heritage Register under Part 7B of the Queensland Heritage Act 1992?

K No - Goto Q1.2 oO Yes - (Complete Form 1, Part Cz) This application requires assessment by the relevant local government against the IDAS

Cade in the Queensland Heritage Regulation 2003. If the development involves building work and the focal

government is not the Assessment Manager for the application, the local government has jurisdiction as Concurrence

Agency.

IPA, sanauine 8, patt 1, fabie 4 em 7A, schedute 8 tables 17-3, 4&3 IP Regutten schedule 2 hable “dem TA PA sechen 14 (Definiions for terns ax de dk veo pmncny,

Queenstand Hentage Reguiaten 2005 schedule 2 (NAS Conte}

 

IREMOVING QUARRY MATERIAL; WILD RIVER AREA

1.2 Does the proposal involve removing quarry material from a watercourse or lake as defined under the Water Act 2000?

[X] No-Gotoa73 ([_] Yes

IPA, schedule 8, part 1, table 5, #em 1; 1P Regulation, schedule 2, table 2, item 11, IP Regulation, schedule 1, table 5, ftem 2 (wild river area): Water Act 2000,

section 966C; Wild Rivers Act 2005, section 43A

 

‘ENVIRONMENTALLY RELEVANT ACTIVITY; WILD RIVER AREA

1.3 Does the proposal involve an environmentally relevant activity (ERA), other than a mining activity or a petroleum activity?

[X] No-Gotoan4 {_] Yes

JPA schedule 8 part], tatle 2,,lain 1 IPA, schedule &, part I table 5, tems 3 add, IP Regulation scheduie 2, table 2 ters 1 anit 23; Frearanmental Protection Act 104, sentir:

SAA (waht siver aea): Wid Rivers Aut 2005, seein 3A, relevant wid fiver declitation, Wild Rivers Code

WITHIN THE LIMITS OF A PORT
1.4 Is any part of the premises within the limits of a port under the Transport Infrastructure Act 1994?
[JX] No - Goto. Q7.s

CJ Yes

IP Regulation, schedule 2, table 2, tems 15 and 16

 

iDECLARED FISH HABITAT AREA

15 Does any part of the premises adjoin a declared fish habitat area under the Fisheries Act 1994?
DX] No - Gotoaié

(71 Yes - if answers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA, schedule

8, this application requires assessment by the Department of Primary Industries and Fisheries (DPI&F). If DPI&F is not the

Assessment Manager for the application, the agency has jurisdiction as Advice Agency.
JP Regulation, schedule 2, table 2, item 26

 

 

iCOMMUNITY INFRASTRUCTURE |
1.6 Is any part of the premises designated for community infrastructure?

[IX] No - Goto.Q7.7

(] Yes

IP Regulation, schedule 2, table 3. item 7

 

WASTE WATER MANAGEMENT “ moe ue : os

17 Does the proposal involve the establishment or expansion of a waste water disposal system?

[EX] No - End of Section? [_] Yes
JP Regulation, schedule 2, table 3, tem 5

 

4 Section 4 must be completed when the epp'ication seeks approval to-cany out operational work,

 

  

ISR OE D«.

 

 

 

[PLANNING SCHEME

44 Is any of the proposed operational work assessable under a planning scheme?
LL No - Go to Q4.2 DX] Yes - (Complete Form 1, Part E} Answer Qs4.1.1 - 4.1.7 below.

Page 10

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.2, 31 March 2008

 

 

ISTATE-CONTROLLED ROAD |
4.1.4 Is any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road?

XJ No

(Yes

If no, is the proposed operationat work for filling or excavating listed in integrated Planning Regulation 1998,
schedule 5 and does it exceed the threshold?

BX] No -Goto 04.1.2

oO Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.

IP Reguiauan, scheduie 2 tate 3. tem 3, iP Regulation, scheduie 2. table 3, item 1(bj
{ACID SULFATE SOILS . 1

4.1.2 |s any of the operational work proposed in a local government area listed*' in State Planning Policy 2/02: Planning and Managing
Development Involving Acid Sulfate Soils

KK] No -Gotoa413 (Yes
4Taurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Buske, Burnett, Caboolture, Cairns, Calliope, Caloundra, Cardwell, Carpentaria, Cook, Cooloola, Douglas,

Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrook, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vale, Mornington, Noosa, Pine Rivers,
Redcliffe, Redand, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday

IP Regulation, schedule 2. table 3, tem 4, State Planning Poly 2/02 Planning end Managing Development involving Acid Sutfate Scils, section 3 6

JEASEMENTS AND SUBSTATIONS. —_- oe - wd
41.3 Is any of the proposed operational work for filling or excavation?

IK} No -Gotoa4.14

C] Yes

IP Reguiation. schedule 2. table 3 item 10{a): IP Requiation. schedule 2, table 3, item 10(b}

 

 

 

4.1.4 Is any part of the premises subject to an easement in favour of the holder of Pipeline Licence Number 1 issued under the
Petroleum Act 1923 for the construction or operation of the Moonie to Brisbane strategic pipeline under that Act?

No -Gotoa4.1.5 [_] Yes
IP Requiation, schedule 2, table 3, tem 17

 

 

PUBLIC PASSENGER TRANSPORT i
4.1.5 s any of the proposed operational work listed in schedule 13C of the integrated Planning Regulation 1998 and does it exceed the
specified threshold?

[EX] No-Getoa4.1.6 © [_] Yes - This application must be referred to QueenslandTransport (QT) as Concurrence Agency.
IP Reguiation, schedule 2, table 3, item 14

 

RAILWAY SAFETY AND EFFICIENCY }

4.16  !s any of the proposed operational work listed in schedule 13D of the Integrated Planning Regulation 1998 and does it exceed the
specified threshold?
BX] No- Goto q4.1.7  ([] Yes - This application must be referred to QueenslandTransport (QT) as Concurrence Agency.
JP Regulation, schedule 2, table 3, item 15

iKOALA CONSERVATION , . |
417 Is any part of the premises in a koala conservation area or koala sustainability area?
[KX] No -Gotoasz (] Yes

IP Regulation, schedule 2, table 3, tem 19

 

 

 

 

{WILD RIVER AREA - Although legislation provides for assessment of operational works for residential, commercial. and industrial
dévatopment for the purposes of the Wild Rivers Att 2005, currently no declarations for any of the wild river aréas apply the Wild Rivers
code to that type of development, . ,

 

 

 

Page 11

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.2, 31 March 2008
(ASSOCIATED WITH RECONFIGURING A LOT: RESIDENTIAL, COMMERCIAL OR INDUSTRIAL DEVELOPMENT IN A WILD RIVER
‘AREA

 

42 ls any of the proposed operational work associated with reconfiguring a lot and the reconfiguration is also assessable?
No -Gotoa43 {_] Yes

IPA, schedute & part 1, table 4, kem 2: IP Reguiation, schedule | part 2, table 5, tem tfc}
Wid Rivers code (Note the code does not currerily Contam app's able provisions for resident:

1a

  

indusviai of commercial devevopment nside a designaied urban

 

 

area)
NEGETATION CLEARING; KOALA CONSERVATION; WILD RIVER AREA 4
43 Is any of the proposed operational work for the clearing of native vegetation to which the Vegetation Management Act 1999
applies?

[XK] No -Gotoass (_] Yes

IPA, schedule 8. part 1, table 4, ilems 1A-1G: IP Reguiation, schedule 2, table 2, tem 5 (vegetation clearing): IP Regulation, schedule 2, table 2, item 34 (koala
conservation): 1P Regulation, schedule |, part 3, table 4, tem (vegetation clearingAmid river area); Vegetation Management Act 1999, section 22A (vegelation
cleating/wild nver area), Wild Rivers Act 2005, sections 31F and 43A

{TAKING OR INTERFERING WITH WATER; WILD RIVER AREA ]

 

44 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with water from a watercourse, lake or spring (other than using a water truck to pump water, and other than under
the Water Act 2000, section 20(2), (3) or (5), or from a dam constructed on a watercourse or lake?

No - Goto Q4.5 oO Yes - Answer (a) and (b) below

IPA, schertule 8, part}, table 4, tems 3a); IP Regulation, schedule 2, table 2, nem 8: IP Reguiaton, schedule 1, pat 3. table 4, Rems 3 and 3A; Water Act 2000, section 9GGA (Hh woh
area), Wikd Rivers Act 2005, section 42A; relevant wid ver deckasation, Wid Rivers Code:

45 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with artesian water (other than using a water truck to pump watery?
& No Goto. 04.6 Ol Yes - (Complete Form 1, Part K,) This application requires assessment by the Department of Natural Resources and Water
(NRW). IF NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.

WPA, schedule 8, part 2, (able 4. tem 3{b): 1P Regulation, schedule 2, table 2, item 8 IP Regulation, schedule 1, part 3, table 4, tem 3
Wild Rivers code (Note: the code does not currently contain applicable provisions for taking or interfaring wath artesian water)

46 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking
overland flow water (other than using a water truck to pump water)?
BX] No -Gotoas7 —[_] Yes - Answer (a) and (b) below
IPA, schedule 8, part 1, lable 4. dem 3(c}{i), IP Regulation, schedule 2, table 2. tem 8 1P Regulabon, schedute 1, part 3, lable 4. item 3; Water Act 2000 serton 966A (wild river tea),
Mut Rivers Act 2005, section 43A; relevant yald river declaration, Wiki Rivers Code

47 ls any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with subartesian water (other than using a water truck to pump water)?
EX] No -Gotoass [_] Yes
IPA, schedule 8, part i, table 4, item Ic){il); P Regulation, schedute 2, table 2. item 8; JP Regulation, schedute 1, part 3, table 4, item 3

Water Act 2000, section 966A (wild river area)(Note: no current Wild River declaration identifies taking or interfering with subartesian water as assessable}
Wild River code (Note: the code does not currently contain applicable provisions for sub artesian water)

48 Does any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for
interfering with overland flow water (other than using a water truck fo pump water)?

[EX] No -Gotoa49 [_] Yes - Answer bath (a) and (b) betow

IPA, schedule 8 part 1, table 4 mers {cyt} sud 3{d}, IP Regedahon, schedule 2, rade 2, tem &, IP Regulation schedule t. pait 3, table 4, fem 3A, Water Act 000 section 9668 (belt
fer 3i¢u), fatavant wild aver dectatatot: Wild Revers Code

 

49 Is the proposed operational work for the following?
(i) For the construction of a referable dam as defined under the Water Act 2000 [XJ No C1 Yes
(i) To increase the storage capacity of a referable dam by more than 10% &J No QO Yes

If yes to either or both (i) or (ii) above - (Complete Form 1, Part Ks) This application requires assessment by the Department of Natural Resources and

Water (NRW). if NRW is not the Assessment Manager for the application, the agency has jurisdiction as
Concurrence Agency.

IPA, schedule 8, part 1, table 4, item 4, IP Requlation, schedule 2, table 2, tem 10

{TIDAL WORK; WILD RIVER AREA |

 

4.10 (s any of the proposed operational work tidal work, other than excluded work defined under the IPA?
Dd] No -Gotea411 [_] Yes - Answer (a) and (b) below

Page 12

INTEGRATED PLANNING ACT 1997 (DAS Assessment Checklist, Version 21.2, 31 March 2008
IPA, schedule §, part 1, table 4, item 5; 1P Regulation, schedule Z. table 2. tems 12. 14 and 17, IP Reguiation, schedule 1. part 3, lable 4, items 4A and §
Coastal Profeciian and Management Act 1995, section 104A (wild fiver area;

(COASTAL MANAGEMENT DISTRICT; WILD RIVER AREA J

 

 

411 ls any of the operational work proposed to be carried out within a coastal management district?
[X] No -Gotoas12 ([] Yes

IPA. schedule 8, part 1. table 4, item 5; IP Regulation, schedule 2. tabie 2. dems 12 ang 14, IP Regulation, schedule i part 3, table 4, items 4A and §
Coastal Protection and Management Act 1995 Act 1995, section 104A {wid river area}, Wid Rivers Act 2008, section 43A

WATERWAY BARRIER WORKS, WILD RIVER AREA 7

 

4.12 (s any of the proposed operational work for constructing or raising waterway barrier works under the Fisheries Act 1994?
(KJ No -Gotoas13 [_] Yes

IPA scheduk. 3 part} table 4 dem 6: IPA, schedule & pact 7 table @ der ¢ Ershenes Regulation 1904 61144 (sell assessable codesr iP Regidkston schedule 2 tetie 7 death co
Regulatwn, schedtie 1, part 3 table ¢, Kem 6 Fsheries Act 1994, section /6D (w.td aver aiea}, Wed Rivers Act 2005, section 43a

 

 

{DECLARED FISH HABITAT AREA; WILD RIVER AREA ]
4.13 Is any of the operational work proposed to be carried out completely or partly within a declared fish habitat area under the

Fisheries Act 1994?

IX] No - Goto 04.14

LI Yes

JPA schertute 8 pait 1, luble 4. dem 7 IPA scheduie 5. part 2 table 4 tent 3 Fishenes Requlanen 1994 5) 13A (ge! srsessahie codesy IP Requiduen, schedule 2 labie 2..tan 2h iP
Regutzton, schedule | part ¥ table 4, xem 7, Wiki Reers Act 2005, secuions 434, fishenes Act section 26D1 (yald uver ated}

 

FREMOVAL, DESTRUCTION OR DAMAGE OF A MARINE PLANT; WILD RIVER AREA J

 

414 Is any of the proposed operational work removing, destroying or damaging marine plants under the Fisheries Act 1994?
BX) No -Gotoas1s (_] Yes

IPA. schentile 8 pait T, lable 4, Ren 8 IPA, schedule & pati 2 table 4 lem 4, Fishates Reguiaton 1965 91134 (seit amessatte codes), 0? Regulation. schedule 2, ade ¢ dette aa WP
Regulation. schedile 1, part 4 table 4, dem 8, Fishenes Act 1994, soron /60U fvald over aiea} Wild Rivers Art 2010, sechion 4.3A, telovant wil iver declaration, Wid Kivets Cade

 

 

WILD RIVER AREA — mere a

AAS |s any of the operational work proposed to be carried out in a wild river area deciared under the Wild River Act 2005?

[K] No -cotoasi6 {[] Yes
IPA, schedule 8, part 1, table 4, item 10: IP Regulation, schedule 2, table 2, nem 37; Wild Rivers Act 2005, sections 42, 43A

 

SSTATE-CONTROLLED ROAD ]

4.16 is any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road?
DX] No -Endofsection¢ [_] Yes
IP Reguiation, schedule 2, {able 2, item 3

 

Disclaimer:
While the Department of Infrastructure and Planning (DIP) believes that this information contained on this form and provided as part of
this process will be of assistance to you, it is provided on the basis that you will not rely on the information without first making your own
enquiries regarding the interpretation and application of the applicable legislation to your circumstances.

To the full extent permitted by law DIP expressly disclaims all liability (including but not limited to liability for negligence) for errors or
omissions of any kind or for any loss {including direct and indirect losses), damage or other consequence which may arise from your
reliance on this process and the information contained on this form.

 

 

 

Page 13

JSC ltr

INTEGRATED PLANNING ACT 1997 Part A, Version 3.0, 3 September 2007

maou Development Application,

Common details

 

 

 

identification of the.premises the subject of the application

4. Can any part of the premises be identified by a street address or lot on plan description?
(7 No - Answer Qi{a)

£X] Yes - Complete Table 8 and answer Qi(b) and Q1(c) iJ e F RS F

@ Table B

 

ED

 

 

 

 

 

 

 

 

 

 

 

 

 

 

~ ~~ ~ Lot on plan description _— —"~s
Unit | Street _ | . Official suburb Post (place each descfiption in a separate row} j
Fumber j ndmber} + * Steetngme. . 5 flocality name }° codes | “tot “Plain type Pan Local government area ,
number (eg. RP. SE number
27 Masthead Quay Noosaville 4566 603 RP 883862 Noosa Counc
1(b). Can the address be further described by shop/tenancy number or storey/level?
—X] No
(C]_ Yes - Complete Table C
1(c). _ {s any part of the premises strategic port land under the Transport Infrastructure Act 19947
No
Yes - Complete Table D
2. Can the premises best be identified by coordinates (e.g. for development proposed in waters, or on a site within a large rural lot)?
@ No

[7] Yes - Complete Table E

3. Are the premises within or adjacent to a water body or watercourse?
(No

Yes - Complete Table F and answer Q3(a)
ip

Table F

de

Name of water body or watercourse ~ |

 

 

 

1 Noosa Waters Canal

 

 

3(a). _ Is any part of the development proposed in tidal waters (ie. below high water mark)?
XX No
L) Yes

Page 14

INTEGRATED PLANNING ACT 1997 Part A, Version 3.0, 3 September 2007
4.  Whatis the total area of land that makes up the premises (le. the area covered by the application)?
__ Area of land above high water mark/outside watercourse

 

 

~~ Area in a water body or watercourse.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

800.00 (&m? [hectares (Tick applicable unit) (im? [Jhectares (Tick applicable unit)
Existing use of the premises t
5. Are the premises currently used for any purpose?

(J No

KX] Yes - Ensure details of any existing use of the premises are provided in plans and documentation submitted with this application, e.g. location

and nature of existing uses, buildings, structures and services

6. Are there any existing easements on the premises (e.g. for vehicular access, electricity, overtand flow)?

&X] No

oO Yes - Complete Table H and ensure the location and dimensions of each easement are included in plans, submitted with the application
Proposal details . : so 4d
7. Are new uses proposed on the premises?

[1 No

LX] Yes - Provide details in Table |
Table |

- "Each proposed new use : 7 - 4
{ New timber jetty
2 Pneumatic boat storage device.

8. Are new buildings or structures proposed to be erected on the premises?

(CJ No

XK) Yes - Ensure the nature, location and dimensions of the proposed new buildings, structures or services are included in plans, submitted with the

application

Applicant details 7 ; . 7

 

9. Who is the applicant for the application?

 

 

Company/organisation name

(if applicable) etter Pty Ltd ATF Jetter Property Trust C/- Noosa Jetty Builders

 

 

 

 

Individual contact person details ni : . ; ae |

Postal address Po Box 299 Noosaville, QLD 4566

 

 

 

 

 

 

 

 

Contact telephone number lo7 5474 3480

 

 

 

 

 

 

 

 

 

Mobile phone number [o4os 137 526
Facsimile number lo7 5474 3480
e-mail address [email protected]

 

 

 

 

 

SS ee ee ee ee

(Oumner’s consent and resource efillement

 

10. Does the application involve a State-owned resource prescribed by schedule 10 of the Integrated Planning Regulation 1998 (IP Reg) or
any other regulation?

DX No

oO Yes - Complete a new Table J for each State-owned resource and submit, with the application evidence of resource allocation or entitlement

Page 15

INTEGRATED PLANNING ACT 1997 Part A, Version 3.0, 3 September 2007
11. Does the application involve land other than State-owned land (i.e. privately owned land) and require owner's consent?

CJ No

® Yes - Complete Table K and submit, with the application, written dacumeniation of all owner's consent

 

 

 

 

 

 

 

 

 

Table K
ae” oe Date written consent |
_ Owner name/s Street address or lot on plan description was obtained
1 Jetter Pty Ltd ATF Jetter Property Trust 27 Masthead Quay, Noosaville QLD 4566 05/02/2008
Mandatory attachments and supporting information }

 

12. What are the other parts of IDAS Application Form 1 submitted with this application, and the other mandatory attachments and
supporting information accompanying this application, not identified in those other form parts?

 

 

 

 

 

 

 

 

 

 

 

 

 

 

"Description of attachment or information | ———>-‘Title (Wappicabk) ; “| Method of defivery to:
{eg. Part C of Form 1, owner's consent, evidence of | (e.g. General Authority James Street Traffic Date ant er |
resource ettocatlon/entitlement, plans, drawings, reports) Report) assessment manager |
1 Part & 05-Feb-2008 | over the counter
2 Checklist 05-Feb-2008 | over the counter
3 Owners Consent 05-Feb-2008 | over the counter
4 Plans 08/ Feb 2008 over the counter
{Portable Long Service Leave (PLSL) fevy for building and construction work j

 

13. Is payment of a Portable Long Service Leave (PLSL) levy required for building and construction work before a development permit for
the application can be given?

&X] No
(Yes

13(a). Indicate the reason PLSL is not applicable

(The application is not for building and construction work under the Building and Construction Industry (Portable Long
Service Leave) Act 1991, section 3AA (e.g. the application is only for a change of use or for the following types of work carried
out solely for farming purposes: land clearing, site preparation, earthworks, fences, fodder harvesting, clearing of encroaching
vegetation, clearing of regrowth, thinning vegetation or controlling weeds or pests); or

K) Allcosts, that relate to the work both directly and indirectly, are less than $80,000, inclusive of GST; or

(1 The work is being carried out under an owner-builder permit issued under the Queensland Building Services Authority
Act 1991- Complete and submit a QLeave Notification and Payment Form (no payment required if owner-builder permit number
stated). The receipted form must be sighted by the assessment manager before a development permit can be given

 

OFFICE USE ONLY

Date Received Reference Numbers | og] Gy \
L

| FOR COMPLETION BY ASSESSMENT MANAGER |

 

 

 

 

 

 

 

Is a QLeave Notification and Payment Form required for this application?

(No

(J Yes - Complete Table M

Page 16

INTEGRATED PLANNING ACT 1997

Part A, Version 3.0, 3 September 2007

 

L

NOTIFICATION OF ENGAGEMENT OF PRIVATE CERTIFIER

5

 

To

 

 

 

Council

| have been engaged as the private certifier for the building work referred to in this application

 

 

~~ Date of

 

Accreditation number

Name

BSA Cerlificaton number

Building classification

 

 

 

 

 

 

 

 

Page 17

INTEGRATED PLANNING ACT 1997 Part A, Version 3.0, 3 September 2007

Advice for completing Part A

 

General advice
Under IPA, section 3.2.1(7} mandatory requirements must be correctly completed for a development application to be a ‘property made application’.
The assessment manger may refuse to receive an application that is not properly made.

Completion of Part A of Form 1 is required for all development applications. Other mandatory requirements, applicable to certain types of applications,
are stated in other Parts of Form 1.

The IDAS Assessment Checklist must also be completed for all development applications, other than those requiring assessment against the Building

Act 1975 only.

For further information about completing this form go to IDAS Guide 1 (Making and IDAS appfication)

 

qi

The premises, the subject of the application, may be identified in a number of ways. Street address and lot on plan are most common.
Lot on plan details can be obtained from title documents or through the local government.

The term ‘premises’ is defined by the IPA, schedule 10 to mean a building or other structure, and land (whether or not a building or
other structure is situated on the land). The term ‘land’ is also defined to include the estate in, on, over or under the land.

A description of the land is not required if the application relates to a mobile and temporary Environmentally Relevant Activity (ERA)
only. Instead complete Q1 (a).

StrategicPortLand is within a local government area but a local government's planning scheme does not apply on Strategic Port Land.
StrategicPortLandis declared under the Transport Infrastructure Act 1994. For further information go to IDAS Guide 11 (Development
on strategic port land) and the Queensland Transport (Ports) website.

 

Q2

Coordinates often provide the best means of accurately identifying the location of development proposed in waters, or on a relatively
small development site distant from property boundaries. Sufficient coordinates need to be provided to identify the boundary of the
premises the subject of the application.

Eastings and northings using GDA94 datum is preferred, but longitude and latitude and other (specified) datum may be provided.

 

 

Q3

A single development application may involve land both within and outside waters.

A ‘watercourse’ is defined by the Water Act 2000, schedule 4 and generally means a river, creek or stream upstream of the point to
which high spring tide ordinarity flows and reflows (unless a regulation has declared a limit for the watercourse). Generally, a
watercourse is in the jurisdiction of the Department of Natural Resources and Water.

“Tidal water is defined in the Coastal Protection Act 1995 (Schedule) and ‘tidal area’ for a local government and for strategic port land
is defined in the IPA (schedule 10). Generally, the area below ‘high-water mark’ (defined by the Coastal Protection Act in relation to
high water mark at spring tides) establishes the boundary of a tidal area.

Land below high water mark is not within a local government's area unless provided for under the Local Government Act 1993.

Unless otherwise provided for by legislation, a local government has no jurisdiction below high water mark. A tidal area for strategic
port land is within the jurisdiction of the relevant port authority, while the Environmental Protection Agency generally has jurisdiction for
a local government tidal area. However, the IPA gives local governments jurisdiction for assessing and deciding applications for
prescribed tidal works within the tidal area for a local government, and the planning scheme may be applied to that assessment (to the
extent provided for in the code for prescribed tidal work).

 

Q9

The applicant need not be the owner of the land. However, the applicant is responsible for ensuring the information provided on the
Form 1 Application Form (including this Part and any other relevant Part) is correct.

If the applicant is a company or organisation, a contact person must be nominated.

Evidence of this consent may need to be provided before the application will be accepted as properly made by the Assessment
Manager, during the processes of the application or in the event of an appeal about the outcome of the application.

 

Qt0

Section 3.2.1(5) of the IPA requires evidence of resource entitlement be given for applications involving a prescribed State resource.
Schedule 10 of the integrated Planning Regulation 1998 (\PR) prescribes the State resources, including State-owned land, where
evidence is required to be given, and the evidence required to support the application. Link to integrated Planning Regulation
Section 3.2.1(10)(a)(ii) states an application cannot be taken to be properly made without the required evidence..

Evidence may be required from more than one Department responsible for a State-owned resource, e.g. from the Environmental
Protection Agency for quarry material below high water mark, and the Department of Natural Resources and Water in relation to the
State-owned land above high water mark.

In the case of applications involving the taking or interfering with water under the Water Act, the development application may be
made at the same time as the request for resource entitlement.

In the case of State-controlled roads, a resource entitlement is not required for an activity that is exempt ancillary works or
encroachment (identified by gazette notice under the Transport infrastructure Act 1994, section 50), or if the activity requires referral to
the Department of Main Roads.

 

 

Page 18

INTEGRATED PLANNING ACT 1997 Part A, Version 3.0, 3 September 2007

 

Q11 . Section 3.2.1{3) of the IPA prescribes that an application must contain, or be supported by, the written consent of the land owner/s, if
the application involves any of the following:
(i) a Material change of use;
(ii) reconfiguration of a lot
(iii) work on land below high-water mark and not within a canal as defined under the Coastal Protection and Management
Act 1995; or
(iv) work on rail corridor land defined under the Transport infrastructure Act 1994.
. “Owner for the purpose of a lodging an IDAS development application means the person at the time of lodging the
application, entitled to receive the rent for the and (or would be entitled to receive the rent for it if it were let to a tenant at a rent).
° Owner's consent is not required for a mobile and temporary ERA.

 

Q12 Only information not identified in other Parts of Form 1 needs to be listed in this section of Part A.

 

Q13 . The Building and Construction Industry Portable Long Service Leave Scheme provides long service jeave entitlements to workers in
the building and construction industry who would be unlikely to accrue enough service with one employer to qualify for long service
leave. To fund the scheme, a levy is collected on all building and construction work carried out in Queensland where the total cost of
the work, whether direct or indirect, is $80,000 or more inclusive of GST. This amount and other prescribed percentages and rates for
calculating the levy are stated in the Building and Construction industry (Portable Long Service Leave) Regulation 2002. Included in
the amount collected by QLeave is the Workplace Health and Safety Fee and the Building and Construction IndustryTraining|evy.

* The Building and Construction industry (Portable Long Service Leave) Act 1991 {PLSL Act) defines the building and construction
industry for the purposes of the levy and includes, for example, renovating, relocating, constructing, altering, demolishing, maintaining
or repairing buildings, pools, roads, jetties, pipelines, fences or earthworks, and works for subdividing, irrigating or draining land.

« The PLSL Act requires the portable tong service leave levy (PLSL levy) be paid before the assessment manager may give a
development permit for certain building or operational work. The assessment manager must sight an approved form issued by
QLeave advising of the status of the payment of the levy.

* Building and Construction Industry Notification and Payment Forms are available from anyQueenslandpost office or agency, on
request from QLeave, or can be completed on the QLeave website at www.gleave, qld, gov.au

For further information contact QLeave (Tel: 1800 803 481 Web: www.gleave.qlid.gov.au }

 

 

Privacy Statement
The information collected on Form 1 will be used by the Department of Local Government, Planning, Sport and Recreation in
accordance with the processing and assessment of your Application. Your personal details will not be disclosed for a purpose outside
of the IDAS process, except where required by legislation (including the Freedom of information Act 1992) or as required
by Parliament. This information may be stored in a Department of Local Government, Planning, Sport and Recreation database, The
information collected will be retained as required by the Public Records Act 2002. For further information on your privacy, contact the
Privacy Contact Officer for the Department of Local Government. Planning, Sport and Recreation at (07) 3237 1860.

 

 

 

 

 

Proposal ID

 

 

 

 

 

 

 

ae ) Click here to submit your DA

 

 

 

Page 19

 

 

 

 

L-€c/80

 

 

oo

 

 

 

wvrer epousmae 4 weg
C4 b0005 40 EBs LEARNS £0 el

{ -—4
Sear D Vaunee,
900 2B Od / eNUby BpUoY
AEDs NEAL, 9 PG

eroeugug ulna BAD | HunnRR
248 €9T O10 KOV Ay
$0}2/908Sy 9
uepJoN UYyor £

W/L OL) Add SDE

 

 

SYaLVM WSOON
AVND GVASHLSVN
L£Z°ON

€09 LOT

ALLS? GaSOd0ud
Yat ft

Sysaine
ALL3r VSOON

37h

 

 

 

BLCIf AI GAB OG

TUN <? *

GaAOuddv SNV'Id

nN AP ETT

HOYVAW ALNNOD
Va@AaM HSIdivd
7OBEREdY

609 101

NOLLdIND830
ALuadOUd Twau

oe.

_ @NOIWAAIA

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TWURAD O0b7 t

LNOAVT
= AL ONINVYS

-

 

 

 

 

 

 

 

 

cosas vO cor coos
SYSHLO AS
3OVuO1LS LvOa
Garren 30 01 T . daSOd0ud
ALI? OMLEOG ——*T | 8
|
18
if
1 L

 

 

 

 

 

 

 

ON3 HOVa SM3Y80S 1331S

 

F bE

|

ag
f
it

“fom

Poi td

 

 

 

 

r
|
el ST

~ \

‘TWWAAD 00001

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3009 ONMid > 6542 SV HLIM

 

“9 CSVZVH O1 CALVaeL ONV
QOOMOYWH G3A0Uddv 38 TIVHS S31id TV
‘Sd

 

 

 

BONVOYODOV NI GSTIVISNI 38 TIVHS S3d Tiv ~RRRBRERRRE

SSTINIVLS OML HUM
SuauVvaE OL G5XI4
GMH ¥b SZb x 8 [
SONDIOIG A A +
-
i 3G
‘ oon ‘ Onuav4 3WKALOZO *
G3LVIOOSSY ONY ONIHOLUd
£09 107 3NOLS 4O YVSTO 38 OL S3Tid
i
| ell
he AER EY SNR Ee a }
ey aa | et oeeriavauaerco
[ |
ws
, b NOILVAS 14
ae
AVNO GV3HISYN

 

 

 

 

 

 

 

 

 

 

 

 

 

” “GHW 90 Td YALVM WNNININ

 

 

 

 

 

 

 

 

 

OHV 0°+ Ta
TIWM 40 dOL

GHv 0'- Ta
30

 

 

' ~ GHV 00° Ta 18A37 GO01d G30u00se WANIKWA

 

 

Page 20

NO. 207 Bee

“7 ro.

wae

 

 

 

 

 

 

tI r }
sev pasnorged i
[sterwnvne | ue Iisa :
wong Rene ca posecesnpentty pe

 

( Moos est! + Seessz09

 

Sts ag aly

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

L

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 21

Yr

 

 

2 js _ J ro

 

 

0 (ove tz AQUdd'
cAaN IN WOON | ON Ona Win

 

 

28 NMG

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Sti hI FDS
Au: AINDAS UjIS
ole¥ S304 ANeT OLB wHBORY aE ave
13s] rere rere Sere pecan OF
6597 918 - StOvy :
40 - OLOIOWY —
| cy ry]
"BATIONNOND - a — ” ~
3
WANSIVM . ° a ‘Cc
LI
/
]
8
os
¢

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 22

 

 

 

 

 

 

4.2. RxaM OD)

je eed ene.

fo) pv 42.

 

 

 

 

 

6resoses < AIRF Acoo 7

 

 

 

cy pete eee ee

 

 

 

aa mae eg ee ee

 

yar

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

488° ON

 

Tea

Page 23

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

; ony T ee poe pT ET me
0 ee wo | ~~ ‘FarAcuds (7
Aaa JAN BOON | “CN ONAVAC win Denmwd Z
st favo¢ z
ONE Ugh acs -
0 cy BtOg Aer Oo) amet Uj aay NARI keyed -
(poy ia3aHs] pO ppd minpnirtilpn sare nipabeventir ent Sine t
sree
__ —
"1 re’ | mr a
— ' i
BAT ONNOWS ~ ° r
f
3 a}
HAR BLM ~
f :
$ , $
:
| ro
v ¥
¢ J gs J ¢ ! __ i é _L !

 

 

 

 

 

 

 

Page 24

——————

 

Sunshine Coast ‘TAnd use section FEES

Regional Council

 

 

 

 

 

 

 

 

RECEIPT TYPE
SALE OF DOCUMENTS
Superseded Planning Scheme Documentation 520
Copy of Permit/Approval Letter 110
The Noosa Plan Documentation 111
APPLICATION FEES
Material Change of Use - Code/Impact
Consistent 521
Inconsistent 521
Assessment under Superseded Planning Scheme 521
Modification to a Development Permit 521
@ Extension of a Currency Period 521
Operational Works - Landscaping 521
Bldg Work assessable against the Planning Scheme 521
PRE LODGEMENT REVIEW
Half Hour 522
One Hour 522
ADVERTISING .
Purchase Advertised Applications 523
JETTIES _
Jetty Application Fee bSO 524
Jetty Bond : 51
(Category 4)
BONDS
’ Performance Bond 51
(Category 9)
iS
ov Registration Fee 222
SEARCH FEE
Search of Land Use Section file 112
Liquor Licensing Request mo 113
TOTAL ¢ ©xO
name: frre Ve fle
ADDRESS: PQ Bex 2499
Nocsavit~e (5b
FILENO: oe/ by, DATE: Uf4foe
Fo PS
REGEIPT NO: 26¢5¢5 Signature of TP Officer: _/ Shee
7 r f
AUTHORITY NO: 4

 

14 res] ou (,

Used in these records

About this file

File size
1.3 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0611 - Transport Type 5 - Boat lifting device (inc INCORRECT 4M boat lift plans) [As Published].pdf · 1.3 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.